ML20029C474

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 91-35 W/Util on 910327 in King of Prussia,Pa to Discuss Valve Lineup Verification Issues,Svc Water Sys Inoperability & safety-related Maint
ML20029C474
Person / Time
Site: Millstone  
Issue date: 03/19/1991
From: Eugene Kelly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9103290022
Download: ML20029C474 (3)


Text

3

~m

'#-l i ; T :_

+

1 MAR {$ygg(

g, e

r U.S. NUCLEAR REGULATORY COMMISSION-.

3 REGION 1

- No. 91 35

' LLNOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:l Northeast Nuclear Energy Company -

Facility:1

'Mllistone Nuclear Power Station, Units 1 and 2_

LDocket Noi 50 245; 50-336

" Time and Date: 9:00 a.m., March 27,1991 I RP Conference Room, Region I Office D

Location:

~

King ~of Prussia, PA furpose:

Enforcement _ Conference on Valve Lineup Verification Issues (Unit 1),

Service Water System inoperability(Unit ?),and Safety Related Maintenance /

+

. Quality Control Issues (Unit 2). -

References:

Reports 245/9101:-245/9104:

and 336/9105.

'NRC At'tendees:

t

C;,W. Hehl,-Director, Disision of Reactor Projects (DRP) lM. W. Hodges, Director, Division of Reactor Safety (DRS) -

E.1Wenzinger, Chief, Reactor Projects Branch No. 4._ DRP J. Durf, Chief, Engineering Branch, DRSf

_ D. Jaffe, Project Maneger, Millstone 1, Directorate 1-4, NRR

- G.Vissing, Project Manager, Millstone 2, Directorate 14, NRR D. Haverkamp, Chief, Reactor Projects Section IB, DRP-

- G. Kelly, Chiefi Reactor Projects Section 4A, DRP W._ Raymcnd, Senior Resident Inspector, Millsto_ne Station D. Dempsey,i Resident inspector, Millstone _ Unit 1 t'

.P Habighorst, Resident Inspector, Millstone Unit 2-DiHolody, Enforcement Officer K. Smith,- Regional Attorney

? Licensee Attendees:

W. Romberg, Vice President Nuclear Operations =

S. Scace,- Nuclear Station Director H. Haynes, Nuclear Unit Director, Millstone l

-J. Keenan, Nuclear Unit Director, Millstone 2-P. Blasioli, Licensing Supervisor

- W. Strong, Shief Supervisor -

y H

LNotc: This meeting is closed to the public. Attendance by NRC personnel at this meeting j

should-be made known by March 25,1991, via telephonezcall to ene Kell, le f n 1, at

'lp

~

FTS 8 346 5234.

Prepared by:

9103290022 910319c E. Mf Kelly, Chief, RP 6 h( '

PDR ADOCK 050002457 mewo10 6L 4

Omd W;~

[/

P PDR' v

<,3 1.

k' hieeting Notice 91-35 2

DISTRIBUTION:

J. Taylor, Executive Director for Operations J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H. Thompson, Deputy Executive Director for Nuclear hinterial Safety, Safeguards and Operations Support (DEDS)

B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement T. hiurley, Director, Office of Nuclear Reactor Regulation J; Partlow, Associate Director for Projects, NRR W. Russell, Associate Director for inspection and Technical Assessment, NRR E. Greenman, Acting Assistant Director for Region 1 Reactors, NRR S. Varga, Director, Division of Reactor Projects 1/11, NRR J. Stolz, NRR/PD l-4 K. Brockman, EDO D. Jaffe, Project hianager, NRR G. Vissing, Project h!anager, NRR W. Bateman, Chief, POEB Section A, NRR N. Green, Jr., Policy Development & Technical Support Branch L. Plisco, LPEB/NRR Public Document Room (PDR)

Local Public Documc1t Room (LPDR)

NRC Senior Resident Inspector State of Connecticut i

i O C.L # [

E Cd4 6 M

.c 1

.s a

Meeting Notice No. 9135 3

I bec:

Regional Administrator Deputy Regianal Administrator J. Stolz, NRR/PD 14 J. Caldwell, EDO Division Chiefs Branch Chiefs Section Chiefs Public Affairs Officer (2 copies)

M. Miller, RI K. Smith, R1 D. Holody, RI W. Raymond, SRI, Millstone J. Shedlosky,' SRI, Haddam Neck D. Dempsey, R1, Millstone Unit 1 M. Boyle, PM, NRR Region 1 Receptionist DRMA Files DRP Files Bulletin Board M.J. DiDonato, DRP Management Assistant, DRMA J. Douglas, DRM A 8

LA O cud bt/Lp