Advises of Closure of Generic Ltr 83-28,Items 3.2.1 & 3.2.2 Re post-maint Testing,Per 881013 Meeting
ML20029C354
Person / Time
Site: Arkansas Nuclear  
Issue date: 03/21/1991
From: James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-83-28, TAC-53733, TAC-53734, NUDOCS 9103270204
Download: ML20029C354 (3)


Text

...

g Entargy.-

maum ci>=um ino.

operations -

OfNL le 50wamo 1

March 21, 1991 OCANO39102 U. S. Nuclear Regulat'ory Commission Document Control-Desk' Mail Station P1-137 Washington, DC 20555

SUBJECT:

Arkansas Nuclear-One - Units 1 &:2 Docket Nos.: 50-313 6 50-368 License Nos. DPR-51 & NPF Closure of Generic. Letter 83-28 Items 3.2.1 and 3.2.2 (TAC Nos. 53733 and 53734)

Gentlemen:

Generic Letter 83-28, " Required Actions;Dased on Generic. Implications of-Galem ATWS Events," was issued to the ' industry on July; 3, -1983. - There are two items in the area of Post-Maintenance Testing.

The items are:

3.1 Post-Maintenance Testing (Reactor Trip System: Components)'

3.2 Post-Maintenance Testing (All Other Safety-Related Components)

Within item 3.2 there are three actions applicable;to post-maintenance testing., These actions include:

3.2.1 Licensees and applicants shall submit a report 1 documenting the extending = of test and maintenance procedures and Technical Specifications review to assure that post-maintenance

~

operability testing of all safety-related -. equipment is; required to be' conducted and that the testing' demonstrates that the

- equipment is -capable of. performing itsisafety _ functions before

- being returned.to service.

3.2.2 Licensees and applicants shalinsubmit the results of their check

- of. vendor and -engineering recommendations to ensure _that any; appropriate tes_t guidance is? Included in 'the test and '

maintenance procedures or the Technical-Specifications where J

. required.

3.2.3 Licensees -and applicants shall; identify, _ if applicable,' any post-maintenance test requirements in existing' Technical, Specifications which are perceived to' degrade rather-than enhance safety. Appropriate changescto these test requirements, with supporting justification,: shall be ~ submitted for staf f :

approval'.

9103270204.910321

~

.DR,ADOCK-0500g3 g pgg' 1

yr

~e-

-y

.+

4 g

---s e

l U. S. NRC March 21, 1991 Page 2 y

A meeting was held on October 13, 1988, at the request o. the NRC, to expedite the resolution of several longstanding safety issues for Arkansas Nuclear One, Units 1 and 2 (ANO-1 6 2).

(The minutes of this meeting were published by the NRC on December 13, 1988.) Two of the items closed at the meeting based upon a commitment to the NkC were Items 3.2.1 and 3.2.2 of Generic Letter 83-28.

The commitment made during the meeting for thase two items was to complete the procedure upgrade program that was currently underway.

This program was to upgrade the maintenance procedures to conform to a newly developed writer's guide.

The maintenance procedure writer's guide and governing administrative procedures require that appropriate post-maintenance testing be specified in maintenance procedures and that the testing be adequate to verify the capability of systems or components to perform their safety functions.

Vendor recommendations are also required to be considered in the development of these requirements.

Entergy Operations has completed the procedure upgrado program for the maintenance procedures associated with safety-related equipment.

These procedures conform with the requirements of the writers guide.

Entergy Operations has also developed a procedure to provide the criteria to be used in the selection and documentation of post-raintenance tests.

This procedure assigns responsibility for determining post-maintenance test requirements, conducting the tests, and reviewing test results.

The procedure also provides guidance in determining the scope of the testing an.i provides typical tests for specific maintenance actions.

Entergy Operations believes the completion of the upgrade project and the implementation of the procedure to control post-maintenance testing

.j completes the required actions for Items 3.2.1 and 3.2.2.

This closes Items 3.2.1 and 3.2.2 of Generic Letter 83-28 for ANO.

1 Should you have any questions regarding this issue, please' contact ma.

Very truly yours, bA M

James Fisicato Manager, Licensing JJF:RWC:sgw cc:

Mr. Robert Martin U. S. Nucluar Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

~l w

J

U. S. NRC March 21, 1991 Page 3 NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1, Nuclear Plant Road Russellville, AR 72801 Mr. Thomas W. Alexion NRR Project Manager, Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 11-D-23 One White Flint North 11555 Rockville Pike Rockville,-Maryland 20852 Ms. Sheri Peterson NRR Project Manager, Region IV/ANO-2 U. S. Nuclear Regulatory Commission NRR Mail Stop 11-D-23 One White Flint North 11555 Rockville. Pike Rockville, Maryland 20852

.._