ML20029C343
| ML20029C343 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 03/18/1991 |
| From: | Cottle W ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20029C344 | List: |
| References | |
| GNRO-91-00051, GNRO-91-51, NUDOCS 9103270190 | |
| Download: ML20029C343 (3) | |
Text
.
8
-= Entargy somu o,, mum,io..
em Operations MaEL" W. T. Co ttle vo-ww
[WU trr Gwd GA' Na ex En un March 18, 1991 U.S. Nuclear Regulatory Commission Mail Str. tion PI-137 Washington, D.C.
20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station.
Unit 1 Docket No. 50-416 License No. NPF-29 Simulator Certification in Accordance With 10CFR55.45 GNRO-91/00051 Gentlemen:
This submittal contains the certification of the Grand Gulf Nuclear Station (GGNS) simulation facility in accordance with the requirements of-10CFR55.45(b)(5). Attached are a completed NRC Form 474 and a supplemental report containing:
a description of the GGNS simulation facility, exceptions to ANSI /ANS-3.5-1985, test abstracts for' completed performance testa, and a testis,g schedule for future performance testing._
Recertification and a description of changes te a performance testing-plan are not applicable to this-original certification.
Also in accordance with 10CFR55.45(b)(5), Entergy Operations will; submit L a rocertification report for the GGNS simulation facility approximately four years from this date. This report shall contain the description'of-the previous four years of performance _ tests, any uncorrected performance test failures with a schedule for correcting anyt such: failures, a schedule for the next.four years of. planned performance tests, and a, description of the planned _ tests if different from those completed in-the preceding four years.
Please -contact this of fice. should you;have questions or need-any additional information.
Yours truly, co V %
WTC/HEK/mtc attachments: 1 - Completed NRC Form 474 2 - GGNS Simulator Certification Report Supplementing NRC Form 474 cc:
(See Next Page)
-G9103121/SNLICFLR - 1
-9103270190 910318 P
frf -
PDR-ADOCK 05000416
[
R PDR
-u s.
l l
March 18, 1991 GNRO-91/00051 Page 2 of 3 t
cci Mr. D. C. Ilintz (w/a)
Mr. J. Mathis (w/a)
Mr. R. B. McGehoe (w/a)
Mr. N. S. Reynolds (w/a)
Mr.11. L. Thomas (w/o)
Mr. F. W. Titus (w/a)
Mr. Stewart D. Ebneter-(w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner Project Manager (w/a)
Office of Nuclear-Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 11D21 Washington, D.C.
20555 l
l l
G9103121/SNLICFLR - 2 t