Responds to Violations Noted in Insp Rept 50-346/90-36 on 901229-910213.Corrective Actions:Spring Tension Properly Adjusted on PORV 445A & I&C Procedure FNP-0-IMP-444.1 Enhanced to Include air-operated Valve Actuators
ML20029C310
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/21/1991
From: Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9103270148
Download: ML20029C310 (2)


Text

.

'Aubama Powce dorn;wiy L s' H

., y a l% 40 ineren Center Parnav:

Post Ottce Box 129$ _

ILmyn0 ham. A!armia as201 E"' leicphone 20b f68 5086L m

Alabamalhver vcee,esm + m oca, March 21, 1991 Fariev Project p g g,g,g g

10CFR2.201 Docket No. 50-364 U.=S. Nuclear Regulatory Commission LAttentions-Document Control Desk

-Vashington,'D.

C.- 20555.

SUBJECT:

Reply.to a Notice of Violation

'J.-M. ftriey Nuclear Plant NRC Inspection of Decembet 29, 1990 - February 13, 1991 RE:

Report Number 50-364/90-36

-Dear Sir

.a This. letter refers t'o' the : violation cited in-the subject inspection -

report. 4 The violation states:

Technical: Specification 6.8'.1 requires that applicable written procedures; recommended-in Appendix A of-Regulatory Guide (RG) 1.33, Revision-2,-1978Jshall be-established,-implemented and i

. maintained.

~'

Contrary,to:theiabove, complete and detailed writtenLinstructions-

e vere not_in place-for maintenanceJpersonnel to repair a pressure operatod! relief valve?(PORV).1 On December 31,'1990,= this lack,of;
complete'and' detailed. instructions,:resulted:in-an-inadvertent automatic actuation of.the PORV at=approximately 1730 psig-rath_er 7

than Lthe recommended opening'setpo. int of approximately 2285' psig.:

-:This' caused atsubsequent RCS depressurization of-approximately-100 psigiduring plant heatup. ; Isolation of the relief path was Lattained.by prompt operator action and'the. closure'of the' i

associated =PORV block valve.e s

Haintenance;Vork-Request VR-213581,: required that the. valve actuator for PORV 445A, be removed, repaired, reinstalled, and-

~

F returned to service. The instruetions:that were provided -as part of the work request, failed to provide suffid ent guidance to assure.that actuator sprir.g tension"vas properl adjusted.for

-the valve to open at the. recommended setpoint.:

~

This-isLa' Severity !.evel'IV violation (Supplement _I).

It should be notedithat;the actual PORV: opening setpoint.is 2335 psig-

-andinotn2285 psig as stated in the: violation.

-eon.noocx 0s000364 -

[/F N'

9103270148 910321 3 [

-Q.

PDR-

,7 r

.u

y.

~

. sg 4

' ' Nuclear Regulatory Commission

~*-

..Page 2 t

Admissicn or Denial.

The above violation occurred as described in the subject report.

Reason for Violation 4

This violation was caused by personnel error.

I&C personnel did not adequately

' check the calibration setpoint to ensure proper-PORV operation. A contributing cause vas--that the work sequence of the MVR for removing and reinstalling the actuator did not provide _setpoint information.

?

Corrective Action Taken and Results Achieved Spring tension was. properly-adjusted on PORV 445A.

Corrective Steps To Avoid Further Violations

1. 'All I&C personnel-vill be reinstructed to ensure proper calibration and

- setpoints are used :vhen performing maintenance on air operated valve-actuators.

2. 'The Daily. Planning Group has been instructed to include detailed
instructions for removing, reinstalling and calibrating air operated valve

-actuators.-

. 3.

I&C procedure FNP-0-IMP-444.1 has beer, enhence' ' to include instructions. for d

removing, reinstalling'andLcalibrating air operated vsive actuators. The Pressurizer'PORV is included in this reocedure.

LDate of-Full-Compliance 9-

' March'30, 1991 Affirmations:

I affirm that this response is true and.completeJto.the besi of my knowledge,

'information, and belief. _-Tne information contained-ir. this letter-is not considered ~to-be-of a proprietary nature.

Respectfully submitted, ALABAHA'POVER COMPANY r

~D. Voodard~

-JDV/BHV maf5-18 cct.

-Hr. S.;D..Ebneter

-Mr. S. T. Hoffman Mr. G..F. Maxwell w

m 3