fMR 11 1991
Docket / License Nos. 50-277/DPR-44
50-278/DPR-56
,
Philadelphia Electric Company
Correspondence Control Desk
ATTN:
Mr. D. M. Smith
Senior Vice Pres ':nt-Nuclear
P. O. Box 195 -
'
Wayne, PA 19087-0195
Gentlemen:
Subject:
,
COMBINED INSPECTION REPORT NOS. 50-277/91-03; 50-278/91 03
This letter transmits the findings of the routice resident safety inspection conducted by Messrs.
J. J. Lyash, R. J. Urban, F. P. Bonnett, and L. E. Myers from January 8 through February 11,
1991, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania. The inspectors based
these findings on observation of activities, interviews and document reviews, and discussed them
with Mr. J. F. Franz of your staff.
Based ca the results of this inspection, one of your activities appeared to be in violation of NRC
requirements, as specified in the enclosed Notice of Violation. This violation involved the
operation of controls that directly affect reactivity by a non licensed operator. The non-licensed
operator was not in the presence of a licensed operator or a participant in a license training
program. Although Section 2.201 requires you to submit to this office a written statement of
explanation within 20 days of your receipt of this Notice, we note that your immediate and
planned corrective actions, as documented in this report, adequately address this issue. There-
fore, no response with respect to this matter is required. If our understanding of your corrective
actions as stated in this report is not correct, please notify us immediately.
During this inspection, we observed refueling activities and found them to be generally well
coordinated and conducted. However, subsequent to this inspection, several fuel handling errors
occurred and were the s6 ject of a management meeting in the Region 1 Office on February 25,
1991. These problems and your corrective actions will be reviewed and documented in Inspec-
tion Report Nos. 50-277/91-08; 50-278/91-08
OoN
7
<
',
.,
O
,
2
in accordance with 10 CFR 2.*i90 of the NRC's " Rules of Practice.
spy of this letter and
its enclosures will be placed in the NRC Document Room.
We appreciate your cooperadon.
Sincere 2 b m :;d By:
l
OF ar
L
y, .
Vin
'
A. Randolph Blough, Chief
Projects Branch 2
Division of Reactor Projects
,
Enclosures:
,
1.
Apptidix A, Notice of Violation
2.
NRC Region i Combined Inspection Report 3, 2; "41-03; 50 278/91-03
i
ec w/ encl:
D. It hiiller, Vice President, Peach Bottom Atomic Power Station
9
D. R. Helwig, hee President, Nuclear Engineering and Services
J. F. Franz, Plant hianager, Peach Bottom Atomic Power Station
E. P. Fogarty, Project Manager, Peach Bottom Atomic Power Station
E. J. Cullen, Jr., 6 squire, Assistant General Counsel
G. J. Beck, Jr., Manager, Licensing Section
R. J. Lees, Chairman, Nuclear Review Board-
A. A.- Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station
J. Urban, General Manager, Fuels Department, Delmarva Power
S. b. Ungerer, Atlantic Electric
B. W. Gorman, Manager-Extenni Affairs, Public Service Electric & Gas Co.
'
J. W. Durham, Sr., Esquire (Without Report)
R. L. Ilovis, Esquire (Without Report)
R. McLehn, Pour Plant Siiing, Nuclear Evaluations
J. H.' Walter, Chief Engineer, Public Service of Maryland
D.. Poulson, Secretary of Harford County Council
Pubik Document Room (PDR)
i
Local Public Document Room (LPDR)
Nuclear Safety information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
K. Abraham, PA0 (2)
!
.
..
_ _ _ . _ _ _
_ -
_ _ _ _ _
_ _ _
,,
. . '
.
.
bec w/ encl:
Region I Docket Room (with concurrences)
Ma.iagement Assistant, DRMA (w/o enclosure)
R. Blorgh, DRP
L. Doen'..a, DRP
P. Kaufman, DRP
i
M. Miller, RSLO
K. Abraham, PAO (2)
f
G. Suh, NRR
R. Bellamy, DRSS
J. Caldwell, EDO Office
R, McBreatty, DRS
l
1.ec w\\ letter and Executive Summary only:
!
W. Hehl, DRP
J. Wiggins, DRP
W.11odges, DRS
J. Durr, DRS
L. Bettenhausen, DRS
,
'
M. Knt.pp, DRSS
T. Kenny, SRI-Limerick
l
B. Norris, PI-Shoreham
!
W. Butler, NRR
i
!
CONCURRENCES:
$