ML20029C243

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 91-32 W/Util on 910325 to Discuss SALP Mgt Meeting
ML20029C243
Person / Time
Site: Beaver Valley
Issue date: 03/14/1991
From: Ruland W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9103270043
Download: ML20029C243 (2)


Text

......

A-MAR 1 1 1991 No. 91-32 U.S. N'UCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Duquesne Light Company Facilities:

Beaver Valley Power Station, Units 1 and 2 Docket Nos:

50-334; 50-412 Time and Date:

1:00 p.m., March 25, 1991 Location:

Simulator Building Conference Room, Beaver Valley Power Station, Shippingport, l'emisylvania

Purpose:

Systematic Assassment of Licensee Performance (SALP)

Management Meeiing NRC Attendees:

M. Knapp, Director, Division of Radiation Safety & Safeguards J. Wiggins, Deputy Director, Division of Reactor Projects (DRP)

E. Wenzinger, Chief, Projects Branch No. 4, DRP q

W. Ruland, Chief, Reactor Projects Section 4B, DRP J. Beall, Senior Resident inspector, Beaver Valley P. Wilson, Resident Inspector, Beaver Valley J. Stolz, Director, Project Directorate (PD) 1-4, Office of Nuclear Reactoc Regulation (NRR)

A. DeAgazio, Project Manager, PDI 4, NRR Licensee Attendees:

W. Von Shack, Chairman of the Board J. J. Carey, Executive Vice President, Operations W. S. Lacey, General Manager, Corpcrate Nuclear Services T. P. Noonan, General Manager, Nuclear Operations N. R. Tonet, Manager, Nuclear Safety H. R. Caldwell, General Superintendent, Nuclear Operations OFFICIAL RECORD COPY 1

goS88st 3!887gy I

i 0

A+

e Beaver Valley SALP hiceting No. 91-32 F

Note: Attendance by NRC personnel at this meeting should be made known by h1 arch "J,1991, via telephone call to William H. Ruland, Region I, at FTS 8-346 5227.

Original eiped Ey:

Prepared by:

Wi!!! m E. "ulsi William H. Ruland, Chief, RPS 4B Distribution:

J. M. Taylor, Executive Director for Operations J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research (DEDR)

H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)

B. K. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR J. Lieberman, Director, Office of Enforcement W. Russell, Associate Dirc; tor for inspection and Technical Assessment,.NRR T. E. hiurley, Director, OfSce of Nuclear Reactor Regulation J. Partlow, Associate Director for Projects, NRR E. Greenman, Acting Assistant Director for Region I Reactors, NRR J. Stolz, Director, Project Directorate I-4, NRR A. DeAgazio, Project Manager, PD I-4, NRR K. Brockman, Regional Coordinator, EDO N. Green, Jr., Policy Development & Technical Support Branch, NRR C. Holden, LPEB/NRR Public Document Room (PDR)

Local Public Document Room (LPDR)

Commonwealth of Pennsylvania NRC Resident Inspector l-bec:

Regional Administrator DRMA Files Deputy Regional Administrator DRP Files Division Directors Bulletin Board Branch Chiefs M.J. DiDonato, DRP Section Chiefs Public Affairs OfScer (2)

J. McGrath, RI M. Miller, RI K. Smith, RI l

D. Holody, RI i

Region I Receptionist OFFICIAL RECORD COPY l

.