ML20029C232
| ML20029C232 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/20/1991 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20029C233 | List: |
| References | |
| NUDOCS 9103270029 | |
| Download: ML20029C232 (3) | |
See also: IR 05000245/1991002
Text
.
,.
_ . .
.
_.
. _ .
. .
. , _ . _ _ _ _ . . . - _ _ _ .
___.
4,
g~ f
7
-
,
Oik
.
- ,
_
MAR 2 0 ;g
,
. Docket Nos. 50 245 '-50-336
50-423
,
=.
.
.
1
- Northeast Nuclear Energy Company
/ ATrNi : Mr. E. J. Mroczka-
Senior Vice. President - Nuclear
-
Engineering and Operations
- P.O. Box 270.
- Hartford, Connecticut 06141-0270-
= Gentlemen:
12ubject: Combined NRC Inspection Report Nos. 50-245/91-02;
50 336/91-03; 50-423/91 03-
L A' routine'radiologicht controls' inspection was conducted on February 18 - 22,1991, by
'
LMri R. L.'Nimitz of this' office-at the Millstone Nuclear Power Station Unhs 1, _2, and 3.
-
The findings of the inspection ,were discussed with Mr. S. Sca'ce at the conclusion'of the
~
inspection.
! Areas reviewed during the Lvpectitm are described in the enclosed inspeedn'1 report.
Thel inspection principally focuced ya 3h(adequacy and implementation of radiological
- t
controls for the Unit i refueling Outage.
i
'
-Within the scope of the' inspection na violadens were identified. The inspector's review :
-_ indicated that radiological controls for the Unn $ outage 1were good. TWeaknesses in
\\ingiustrialfsafety were identified and are= described in-the. enclosed report.
,
s
m~
LNo response toLthis letteris required. Your cooperation with us is appreciated.
l
..
4 Sincerely,
'
'
Orieinct s;sn
y;r.
James H, yo,od B +-
'
+
ng, Y
'
'
James H. Joyner, Chief
Facilities Radiological Safety
,
a'nd Safeguards Branch -
Division of Radiation Safety -
l
L
and Safeguards -
't
f. '[ ' fP ?s
l.
"
inp yn w 4,m.qpwn
p.1;
+
,C (p3
,
k
. . .
W(!W..E n!jVg/i
y
'
!:
'1103270029 910320
'l
i
""
LPDR
ADOCK 05000245
I
I
k
k'
PDR y
1
-
.
. - -
-
,
.
-,
- . -
.
- .
- .
.
- . - .
.
,
.. _
>
. _ . -
_
. _ . .
-_
_
_.
_. _ _
. . _ _.
- .y
.
-,
,
';
,
_
f
- .
LNortheast Nuclear Energy Company ;
'2.
MAR f p
.
-
-
.m
. Enclosur'e:: . Combine'd NRC Inspection Report Nos. 50-245/91 02; 50 336/91-03,
- 50-423/91-03
. cc 'w/ encl:
. W. D; Romberg, Vice President, Nuclear Operations
-
,
. S.=E. Scace, Station Director, Millstone
- D. O. Nordquist, Director 'of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
'J. P. Stetz, Siation Director, Haddam Neck
'
, Gerald Garfield, Esquire
. , ,
Public Document Room (PDR)
LLocal Public Document Room (LPDR)
- Nuclear Safety Information Center (NSIC)-
NRC. Resident Inspector:
State of Connecticut--
.
b
2
4
.
e
i
s
f .,
$ 'j
i
$
f
5
- ff,8
8 y 89 k
,'b
(
-
+
bOi i
bi
= - J . . ..;
.
'
- . . . .
..
.=
-
-,
-
.-.
-,-
- , . . .
_-
____
________
1:';:_
-
-.
>
Nortlieast Nuclear Energy Company
3
Mg g
- bec w/ encl:
'
_ ._
_
- Region I Docket Room (with concurrences)
-Management Assistant, DRMA (w/o encl)
R. Bellamy, DRSS
DRP Section' Chief.
, K; Abraham, PAO (30) SALP Reports and (2) All Inspection Reports
_
W. Raymond, SRI Millstone
'M. Conner, SALP Reports Only
J. Shediosky, SRI, Haddam Neck
. J. Caldwell, EDO.
.
,
J
,.
(
- - RI:DRSS
RI:DRSS =
1:
l[ovNimitz/mlb
kPasciak
Joyner
03/19/91
03h/91-
03ff/91
nrm 1r
r< e n bbh
re-er a s :
,'
. IbOild
(. , d . . t .
_
. .
.
..
.
_ _ _ _ _ _ - - _ _ _ _ _ - _ _ _ _ _ _