Forwards Resident Insp Rept 50-336/91-01 on 910107-0216.No Violations Noted.Nrc Concerned W/Poor Communications & Breakdown in Maint Work Controls Which Immediately Preceded Reactor Trip on 910110
ML20029C230
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/15/1991
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20029C231 List:
References
NUDOCS 9103270027
Download: ML20029C230 (2)


See also: IR 05000336/1991001

Text

_

Dm.mQ$

o

.-

'r

March 15, 1991

Docket No. 50-336

. Northeast Nuclear Energy Company

ATI'N: Mr. E. J. Mroczka

Senior Vice President - Nuclear

. Engineering and Operations

P.O. Box 270

Hartford, Connecticut 06141-0270

Gemlcmen:

Subject: NRC Region I Inspection No. 50-336/91-01

This letter transmits the NRC report of a routine resident inspection conducted by Mr. Peter

Habighorst of Region I on January 7 - February 16, 1991, at Millstone Unit 2.

At the

conclusion of the inspection, the findings were liscussed with Mr. J. S. Keenan and other

members of your staff.

Areas examined during the inspection are described in the enclosed report. Within these areas,

the inspection ' consisted of performance observations of ongoing activities, independent

.

,

verification of safety equipment status and design configuration, interviews with personnel, and

review of records. Overall operation of the facility was concluded to be satisfactory.

Although not. cited as a violation during this inspection, we are concerned with the poor

communications and breakdown in maintenance work controls which immediately preceded the

reactor _ trip on January 10th. While erratic operation of a main turbine EHC pump was a

contributing factor in the trip, experienced mechanics prematurely began unauthorized,

unsupervised, and unisolated replacement of a filter without an adequate pre job bricting. -We

will focus future inspection followup on these aspects which are critical to effective and safe

maintenance.

Your cooperation witn us is appreciated.

Sincerely,

Oris11 Signed By j

N'

AW

de entz

Edward . Wenzinger, Chi f )

Projects Branch No. 4

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-336/91-01

OFFICIAL RECORD COPY

9103270027 910315

.fl50 I

PDR

ADOCK 05000336

o

PDR

7lI

(.

y

- e.

'

,. t, 7

o

Northeast Nuclear Energy Company

2

cc w/encls:

W. D. Romberg, V!ce President, Nuclear Operations

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

S. E. Scace, Station Director, Millstone

' J. S. Keenan, Nuclear Unit Director, Millstone Unit 2

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/encls:

Region 1 Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

E. Kelly, DRP

J. Shediosky, SRI, Haddam Neck

W. Raymond, SRI, Millstone

G. Vissing, PM, NRR

K. Brockman, EDO

H. Gregg, DRS (See Section 7.1)

C. Anderson, DRS (See Section 6.1)

M. Gray, DRS (See Section 6.2)

bec w/ Report Cover Sheet and Executive Summary only:

W. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

W. Lanning, DRS

L. Bettenhausen, DRS

J. Durr, DRS

M. Knapp, DRSS

-R. Coop:r, DRSS

J. Joyner, DRSS

J. Stoltz, NRR/PDI-4

I:I? P

I:DRP

I- RP

DR

g

'

'

T43

f

-

0

I.KhLLY

(R . \\ ' N11NGER

1-

RST

AYMOND

E

E

.

.

3/l$91-

34$/91

3/y91

3// /91

f

A:M129101.RPT

OFFICIAL RECORD COPY