ML20029C199

From kanterella
Jump to navigation Jump to search
Forwards Initial Simulator Certification.
ML20029C199
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/21/1991
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20029C200 List:
References
NUDOCS 9103260418
Download: ML20029C199 (2)


Text

., op.

RA

~

1.nnne v.wy ,wony. i soi u.+a se,et erwww.va. te mm v.a MAR 211991 Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commisalon

' Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR (SQN) PLANT - CERTIFICATION OF THE SQN UNITS 1 AND 2 SIMULATION FACILITY The enclosed NRC Forms 474 and supporting information provide TVA's certification for the SQN Units 1 and 2 plant-referenced simulator. The supporting infotination-consists of test schedules, test abstracts, and a C susenary of discrepancies and exceptions in response to the Form 474 questions.

The SQW simulator is owned and operated by TVA. It is located at the SQN Training Center adjacent to the plant site near Soddy-Daisy. Tennessee.

The sisailstor was manufactured by Singer-Link-Miles using the SQW design and performance characteristics. The simulator was first operational in 1977. A complete upgrade of.the software and initial certification testing were completed in March 1991. The simulator now features

-state-of-the-art reactor core and thermal-hydraulics modeling, extensive electrical system modeling, and an updated instructor's station.

If there are any questions'concerning this submittal, please telephone Earl G. McKeown at 615/751-4888. i Very_truly yours.

TENNESSEE VALLEY AUTHORITY

/k.I.)[

E. C. We ace, nager i.

Nuclear Licensing and Regulatory Affairs Enclosure cc - See page 2 Q J(

9103260418 910321 ' /

PDR ADOCK 05000327 1, {-

P PDR /

.. x .,._.- ~ . _ . _ _ . __ _ _ . .- _ _ , _ _ M

. ..+ -

2 MAR 211991  ;

U.S. Nuclear Regulatory Comraiscion

}

Enclosure >

ces Ms. S. C. Black, Deputy Director ,

Project' Directorate 11-4 U.S. Nuclear Re6ulatory Commission "

One White Flint. North ,

4 11555 Rockv1110 Pike.

Rockville, Maryland 20852 U.S. Nuclear Regulatory Commission (Encloouro)

Document Control Desk t Washin6 ton, D.C. 20555 U.S. Nuclear ReSulatory Constisalon (Enclosura)

. Region II P.O.' Box 2257 Atlanta, Georgia'30301 -

Mr. J. N. Donohew, Project Manager

  • U.S. Nuclear Re6ulatory Comunission One White Flint North

,c 11555 Rockville Pike >

Rockville, Maryland 20852 _

_. ~ _ _ .

NRC Resident inspector'(Enclosure) *

' Sequoyah Nuclear Plant

' 2600 Igou' Ferry Road Soddy Daisy. Tennessee 37379  !

Mr._B. A. Wilson.-Project Chief U.S. Nuclear Regulatory Coaunission' '

Region 11- _ 4 101 Marietta' Street, NW, Suite 2900- [

Atlanta, Georgia 30323 -l l

-1

?

e 4 e -w--t nwen-s- -+e-M Pg S rwy eg e 4M*"w*

e w _ -t y eap -m y +y -

g y g-'-w-Mw vyy1 em= $- wm-=--m'%- M'y= g-- - -

A Sequoyah Nuclear Training Department c ,,

A\

(I I 3 L~'YN Initial Simulator Certification

_. _ _