ML20029C194

From kanterella
Jump to navigation Jump to search
Forwards Clinton Power Station Simulator Certification Rept.
ML20029C194
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/21/1991
From: Jamila Perry, Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20029C195 List:
References
U-601809, NUDOCS 9103260412
Download: ML20029C194 (2)


Text

'

lA.120 ,

ILLINDIS POWER "in1A'3-21ne I Ct.INTON ItWER STATION. P,0. dOX 678. CLINTON, ILLINOIS 61727 0078. TELEl9 TONE (217) 935 8881 March 21, 1991 10CFR55.45 ,

l Docket No. 50-461 U. S. Nuclear Regulatory Commission Director of Nuclear Reactor Regulation Washington, D.C, 20555

Subject:

Clinton Power Station (CPS) Training Simulator Initial Certification Report

Dear Sir:

In accordance with 10CFR55.45(b)(1)(ii), (b)(3), and (b)(5),

Illinois Power Company (IP) submits the initial certification report for the Clinton Power Station (CPS) training simulator.

NRC Form 474, Simulation Facilities Certification, is enclosed along with the certification report which has been developed in accordance with Regulatory Guide 1.149 and American National Standards Institute /American Nuclear Society standard ANSI /ANS 3.5-1985 entitled, Nuclear Power Plant Sieulators for Use in Operator Training.

If you have any questions regarding this report, please contact me at (217) 935-8881. extension 3400.

Sincerel yours,

,Q F. A. Spangenb' erg, III Manager, Licensing and Safety DWW/alh Enclosures cc: 1.RC Clinton Licensing Project Manager NRC Resident Office NRC Region III, Regional Administrator Illinois Department of Nuclear Safety l

9103260412 910321 a PDR P

ADOCK 05000461 PDR A

is i1

[vl g A

U.S. NUCLE AR REGULATORY CoMMIS51oN AnROvED a r OM8 NO 3160c138 NoC PORM 4/4 E XPtRES 63097

()(ol to CFR 66 a6(b),

66 t end 66.6 ESTIM ATED BURDEN PER RESPONSE TO COMPLY WITH THl3 INF ORM A TION COL L E CTION REQUEST;l'o HMS FORWARD a

, . SIMULATION FACILITY CERTIFICATION c?J"A"'Antc= ,=n;tn','*,^4'N;? =,";'.,fa U. S NUCLEAR REOULATORY COMMISSION W ASHINGTON DC

(

r 20666. AND TO THE PAPERWORK REDUCliON PROJECT tJI60 0138).

l DC 2063.OF FICE OF MANAGEMENT AND DVDGET, th ASHING TO INST RUCTIONS. This form is to be f> led 'or initial certification, recertificatAbi retwredL and for any change to a simulation facility performaxe testmo plan made after initial

.ubmiitai ce iuch a pian. Provide the foliowmg mform.iion. .nd check in e ooroteia e on to mdicate resiun for sutnnittai.

F ACILIT Y lDoWE1 NUMtlEH Clinton Power Station Unit No. 1 s 50 461 LICE NSE E lDAfE Illinois Power Company March 13s 1991 This is to certity that:

1, The above named f acdity 16censee is us ng a simuistion facility consistmo solely or a piant referenced simulator that meets the requirements of 10 CF R 55.45.

2. Documentation is eveasbie for NRC rwow in accordance with 10 CF R 55.45(bL
3. This simulation facility meets the guidante contamed m ANSl/ANS 3.5,1985, as endorsed by N RC Reguis">ry Guide 1,149.

If there are aPy eAceptions to the Certification of this item, Check hare ( ) s'Id describe fully on additional pages as necessary.

NAME for other s/entification) AND LOCATION of SIMULATION F ACILlTY Clinton Power Station Training Simulator Clinton Power Station Clinton, Illinola pf StMULATloN F ACILlTY PE RFoRMhNCE TEST ABSTR ACTS ATTACHED. (forperformance tests conducted in the perk >d endmg with the date of this certification)

DESCR IPTioN oF PE R Fo R M ANCE T ESTING COMPLETE D (Attach additoonalpage(sl as necessary, and identify the item denenproon bomg contmund)

See the Clinton Power Station Simulator Certification Report, dated March, 1991s Sectiont V. and VI.

StMULATioN F ACILt T Y PE RFoRMANCi TESTING SCHEDULE ATT ACHED. (For the conduct of approssmate/y 25% of performance tests per yest for the four year N period commencing with the date of this certification.)

DESCRiPTloN oF PER FoRMANCE TEST lNG To BE CoNOUCTE D. (Attach additsonalpage(s)as neceuary, and identi!y the item dea ription being continued)

See the Clinton Power Station Simulator Certification Reports dated March, 1991sSection V.G.

PE R FoR MANCE TESTING PLAN CHANGL (fcr any modification to a performance testing obn submrtted on a previous certification)

DESCRIPTloN oF PERFCoRMANCE TEST lNG PLAN CHANGE (Attach additionalpage(slas necessary.andidentify theitem descnotion being contMuect) l R E CE RTl FICA TloN (Deectibe corrective actions tak on, attach results of compteredperformance testmg in accordance with 10 CFR } 56.4$ib)($)/v).

Attach additionalpageis) as necessery, and identify the r' tem description being continued.)

/.ny false stat 6mwnt or omission in this document, includmg attachments, may be subject to civH and criminal sanctions. I certify under penalty of perjury that the information in this document and attachments is true and correct.

SIGNATURE - AUT REPRESENTATIVE l TITLE lDATE Vice President 2s y l In accordance 'ith 1 CF R l E5.5, Cormf(unications, this form shall be submitted to the NRC as follows:

SY Mall ESSED To: Director, Office of Nucteer Reector Regaletion BY DE LIVERY IN PERSON one Whita Flint North U.S. Nualeet flegulatory Commission To THE NRCoFelCE AT: 11566 Rocke6He Pike Weskingson, DC 2tP46 Rockeine, tie 0 8sRC FORM 474(14 3

CLINTON POWER STATION I I'~-

nyyuwhilo

~

w-e I

,., l 4

I n _ :!l'I k., J '_

-6 d -

~

g n

'"N " M'.Th g*g '

fl ;b ,, ,

'N ~

- ~ ~

l _

V(pl((fylilqT{

% _h_ ~..__ __%Emysutninimumwminst O

  • SIMULATOR CERTIFICATION REPORT

. . .- . -- -_ .. _ _ ..._ _ .-._- _ __