ML20029B799
| ML20029B799 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/27/1991 |
| From: | Beck G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20029B800 | List: |
| References | |
| NUDOCS 9103150114 | |
| Download: ML20029B799 (4) | |
Text
. _ _ _ _ _ _ _
s j
PHILADELPHI A ELECTRIC COM PANY NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD.
WAYNE, PA 19087 5691 (it si s404 coo February 27, 1991 Docket Nos.
50-277 50-278 License Nos.
DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Emergency Plan Implementing Procedures Dear Sir Enclosed are revisions 49, 50, 51, 52, 53, 54 and 55 to the Emergency Response Procedures for Peach Bottom Atomic Power Station, Units 2 and 3.
These procedures are being submitted in accordance with 10 CFR 50.54(q), 10 CFR 50 - Appendix E, and 10 CFR 50.4.
The following revised procedures are enclosed.
REVISION 49 ERP-140 App. 2 Rev. 14
" Technical Support Team Leader" (TSTL)
REVISION 50 ERP-140 App. 3 Rev. 16
" Dose Assessment Team" Leader" (DATL)
REVISION 51 ERP-140 App. 8 Rev.
6
Company Consultants and Contractors" REVISION 52 EPR-101 Rev.
6
" Classification of Emergencies" ERP-140 App. 2 Rev. 15
" Technical Support l {
Team Leader" (TSTL) l ERP-140 App. 3 Rev. 17
" Dose Assessment x
TeamLeader"(DATL[
ERP-140, Apo. 4 Rev. 11
" Chemistry Sampling I
9103fS6ff# siU22?
PDR ADOCK 05000277
/
i F
(
1 I
feach Bottom Atomic Power Station February 27, 1991 i
' Emergency Plan Implementing Procedures Page 2
)
1
& 5nalysis Team Leader" 1
(CSATL).
1 j
ERP-140 App. 6 Rev.
9
" Security Team Leader" j
(STL) 1 ERP-140 App. 7 Rev. 12
" Personnel Safety Team
]
Leader" (PSTL).
l REVISION 53 ERP-110
-Rev. 4
" Emergency Notifications" 1
ERP-130 Rev. 3
" Site Evacuation" ERP-250 Rev. 6
')
(TSC) Activation" ERP-260 Rev. 7
" Emergency. Operations lj F6c111ty (EOF)
Activation" ERP-315
.Rev. 4
" Operation of the Peach Bottom Computer Dose j
Assessment System" 1
ERP-520 Rev. 2
" Security Team j
2 Activation" j
ERP-600 Rev. 4
" Personnel Safety Team.
l Leader" (PSTL)
ERP-630 Rev. 3
" Dosimetry
- Bioassay, i
and Respiratory i
Protection Group" ERP-660, Rev. 4
" Entry for Emergency j
Repair and Operations"
)_
EPR-910 Rev. 1
" Reception and Orientation'of. Support l
Person 91" i
i REVISION 54 ERP-140 App. 1 Rev. 12-
" Emergency Director" (ED)=(Call in 2) i ERP-140 App. 2 Rev. 16
" Technical Support Team Leader" (TSTL):
4 ERP-140 App. 3.
Rev. 18
" Dose Assessment' Team Leader" (DATL)
ERP-140 App. 4 Rev. 12
" Chemistry _ sampling &
i Analysis Team Leader"
1 poach Bottom Atomic Powar Station February 27. 1991 i
' Emergency Plan Implementing Procedures Page 3 (CSATL)
ERP-250 Rev. 7
" Technical Support Center (TSC) Activation" ERP-260 Rev. 8
" Emergency Operations Facility (EOF)
Activation" ERP-320 Rev. 2 "Use of the containment Radiation Monitor to Estimate Release Source Term and Noble Gas Monitor Readings" v
ERP-340 Rev. 2
" Field Survey Group" ERP-640 Rev. 2
" Vehicle and Evacuee Control Group" REVISION 55 ERP-620 Rev. 3
" Plant Survey Group" In accordance with 10 CFR 2.790(a)(6), we request that names and telephone numbers in the above proceduras be withheld fr^m public disclosure since such disclosures would constitute an unwarranted invasion of the personal privacy of the individuals involved.
Due to recent changes of responsibility for the distribution and control of Emergency Plan Implementing procedures, we hati encountered delays in reproduction services required to support this submittal.
As a result the enclosed procedures are not being submitted within the required 30 days per 10 CFA 50 -
Appendix E.
The reporting requirements for the submittal of these procedures have been reviewed and communicated to the new responsible group to ensure timely submitta1Lof future ravisions.
If you have any questions or require additional =information, please do not hesitate to contact us..
Very truly yours, lh w h]/
G. J.
.eck, Manager Licensing Section Nuclear Engineering & Services-Enclosure T. T. Martin, Administrator, Region I, USNRC j
cc:
J.
J, Lyash, USNRC Senior Resident Inspector, PB (2 copios)
l EMERGENCY RESPONSE FPOCEDURE) INDE:
ERP Index Page 2 l
.9EACH BOTTOM UNITS 2 AND 3 Rev. 49
- l 12/06/90
~
Sponsor
' Review Rev. Revisitn FJ1Ehgr Title ljumber
_,_ R a h &
Date ERP-140 NEARBY PUBLIC AND (000000) 03/16/90 6
03/16/90 APPENDIX 9 INDUSTRIAL USERS OF l
DORNSTREAM WATER s
l ERP-200 EMERGENCY DIRECTOR (ED)
(000000) 10/17/90 6
10/17/90 ERP-210 EMERGENCY RESPONSE (000000) 10/27/90 3
10/17/90 MANAGER (ERM)
ERP-215 PLANNING & SCHEDULING (000000) 03/27/90 0
06/02/88 COORDINATOR (P&SC)
ERP-220 OPERATIONS SUPPORT (000000).03/27/90
?
12/20/88 CENTER (OSC) OPERATIONS PERSONNEL ERP-230 OPERATIONS SUPPORT (000000) 07/02/90 4
07/02/90 CENTER (OSC) ACTIVATION ERP-240 AUXILIARY OPERATIONS (000000) 08/01/88 SUPPORT CENTER (AUX OSC) ACTIVATION
-CANCELLED-NO REPLACEMENT ERP-250 TECHNICAL SUPPORT (000000) 09/12/90 5
l'1/20/90 CENTER (TSC) ACTIVATION ERP-260 EMERGENCY OPERATIONS (000000) 02/02/90 6
11/16/90 FACILITY (EOF)
ACTIVAT.!ON ERP-270 ALTERNATE EMERGENCY-(000000)"09/12/90 2 ' 09/12/90 OPERATIONS FACILITY -
(ALT EOF) ACTIVATION ERP-300 DOSE ASSESSMI9f TEAM (000000) 05/02/90 2
03/20/89 LEADER (DATL)
ERP-305 DOSE ASSESSMENT GOUP (000000) 07/02/90 3
07/02/90 LIADER (DAGL)
ERP-310 DOSE ASSESSMENT GROUP (000000) 06/12/90 3
06/12/90 ERP-315 OPERATION OF THE PEACH (000000) 05/11/90 3
05/11.'90 BOTTOM COMPUTER DOSE ASSESSMENT SYSTEM ERP-316 CUKULATIVE POPULATION (000000) 12/19/89 3
03/27/90 DOSE CALCULATIONS FOR AIRBORNE RELEASES -
i 4
1
~
VMJLJLUAJLif NUCLE AR Rt.GULATORY COMMISSION I
[
g l
W A SHING T ON, D. C. 70%6
/
March 12,1991 S0-?77/218 Peach Bottom MEtiOPANDUM FOR:
Chief. Document Control Branch, IRM FROM:
Director Division of Freedom of Information and Publicatiers Services ADM 1
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION Tho Division of freedom of information and Publications Services has reviewed the attached document and has determined that it may now be made publicly available.
/Y# m-W / %ds, Donnie H. Grimsley, Director Division of freedom of Inforwation and Publications Services Office of.4dministration
//8
(
4 O
(
b
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.