Summary of 910205 Meeting W/Util Re Generic Licensing Issues & Plant Specific Concerns.Agenda & List of Attendees Encl
ML20029B359
Person / Time
Site: Byron, Braidwood, Zion  File:ZionSolutions icon.png
Issue date: 02/26/1991
From: Hsia A
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9103070100
Download: ML20029B359 (6)


Text

,

Pebruary 26, 1991 Docket Nos. 50-295, 50 304 STN 50-454, STN 50 455 and STN 50 456, STN 50 457 LICENSEE:

Comonwealth Edison Company FACILITIES:

Zion, Byron, and Braidwood

SUBJECT:

MEETING

SUMMARY

- PWR COUNTERPARTS MEETING, FEBRUARY 5,1991 On February 5,1991, NRC PDlII.2 staff met with their Commonwealth Edison Company (CECO) counterparts from the three PWR facilities to discuss generic licensing issues and plant specific concerns. A copy of the agenda and the list of attendees are attached.

The discussions took place according to the agenda. The key points and resolutions are summarized as follows:

NRC staff explained the SALP process with em)hasis on the Safety Assessment / Quality Verification section whici is evolving into a utility performance trend indicator. Mr. Kovach indicated that Ceco will involve NRC PMs in their mockup SALP midway through the SALP period.

Ceco suggested more frequent comunications between the counterparts to keep them better informed of the NRC's view of their licensing submittals. NRC staff agreed and is starting a pilot project on Byron so that the NRR assessments will be forwarded to the SRIs for their inclusion in the quarterly inspection reports.

Mr. Taylor said that he plans to infonn each PM on Ceco's responses to generic issues twice during each SALP period.

Ms. Moore instructed the Ceco personnel on the requirements for Oath and Affirmation on licensing actions.

Each NRC PM met with their counterpart and discussed priorities, schedules, and technical issues on the existing and 1991 planned licensing submittals.

g g g.

Anthony H. Hsia, Project Manager Project Directorate 1112 Division of Reactor Projects. !!!/IV/V Office of Nuclear Reactor Regulation

Enclosures:

1.

Meeting Summary 2.

List of Attendees n

DFC

L4:P T -2
PM:PDIII-2
PM:PDIII.2
PM:PDlII 2
D:PDIll.2

......:-(............:.........'....:..........

.. f..k.......... f..$.

.... f.

.. :..$ 'N...... h h/[/91

T/4 6/91
b /J6/91
A/E/91
7 /7 //9)/

DATE OFFICIAL RECORD COPY Document Name: MEETING

SUMMARY

ZION B & B 1

9103070100 910226 I

gDR ADOCK 050 g 5

DISTRIBUTION.

l

Docket TTies P1 37 (50-454/455, 50-456/457, 50-295/304)

NRC"&" Local PDRs F. Miraglia 12/G/18 J. Partlow 12/G/18 B. Boger 13/E/4 J. Zwolinski 13/H/24 R. Barrett 13/0/1 A. Hsia 13/D/1 R. Pulsifer 13/0/1 C. Patel 13/D/1 C. Moore 13/D/1 E. Jordan MNBB 3701 W. Kropp Rlll ACRS (10)

P-315 R. Lobel 17/G/21 L. Marsh 13/D/18 J. Hannon 13/E/21 W. Shafer Rlli D. Burgess Rlli E. Leeds 13/H/24 OGC

7-yo

! 4 t

.n

.g

.c, Me. Thomas J. Kovech l

Commonwealth Edison Conpany Byron /Braidwood Power Stations cet l

Mr. Gabe Toth U. S. Nucitar Regulatory Commission Westinghouse Electric Corporation Byron / Resident Inspectors Office i

Energy Systems Dusingst Unit 444B North German Church Road l

Post Office Box 355, Bay 236 West Byron, Illinois 61010 Pittsburgh, Pennsylvania 15230 i

Ms. Lorraine Creek 1

l Joseph Gallo, Esq.

Rt. 1. Box 182-

[.

Hopkins and Sutter Manteno, Illinois 60950 N

888 16th $treet, N.W.

L Suite 700 Mrs.- Phillip B. Johnson l

Washington, D.C. 20000 1907 Stratford Lane Rockford, Illinois 61107 L

-Reoional Aoministrator-U. S. NRC, Region III Douglass Cassel, Esq.

-799 Roosevelt Road B1dg. #4 17 East Monroe Street Glen Ellyn, Illinois 60137 Suite 212 r

i.

Chicago, Illinois 60603 Ms. Bridget Little Rorem Appleseed Coordinator David C. Thomas, Esq.

117 North Linden Street 77 S. Vacker Drive Essex, Illinois 60036 Chicago, Illinois 60601 Mr. Edward R. Crass Michael Miller, Esq.

Nuclear Safeguards and Licensing Sidley and Austin l

Division One first National Plaza Sargent & Lundy Engineers Chicago, Illinois 60690 55 East Monroe Street L

Chicago, Illinois 60603 George L. Edgar l

Newman & Holtzinger, P.C.

U. 'S. Nuclear Regulatory Commission 1615 L St reet, N.W.

Resident Inspectors Office Washington, D.C.

20036 RRf1, Box Braceville, Illinois 60407 Commonwealth Edison Company E

Byron Station Manager -

Mr.- Thomas W. Orteiger, Director 4450 North German Church Road Illinois Emergency Services By ron,1111nni; 61010 and-Disaster Agency 110 East Adams Street 1111nois' Department of.

Springfield, Illinois 62706-Nuclear Safety -

Office of Nuclear Facility Safety-Robert Neumann 1035 Outer Park Drive Office of Public Counsel Springfield,1111noic 62704 State of Illinois Center 100 W. Randolph Commonwealth Edison Company Suite 11-300 -

Craidwood Station Manager l-Chicago, Illinois 60601 Rt. 1, Box 34 Bracevil10, Illinois 60407

Mr. Thomas J. Kovech Zion Nuclear Power Station Commonwealth Edison Company Unit Nos. I and 2 i

cc:

Michael 1. Miller, Esq.

Sidiey and Austin One First National Plaza Chicago, Illinois 60690 Dr. Cecil Lue-Hing Director of Research and Ctvelopment Metropolitan Sanitary Dist 'ict of Greater Chicago 100 East Eric Street Chicago, Illinois 60611 Phillip Steptoe, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mayor of Zion Zion, Illinois 60099 1111nois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Resident inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4 Glen Ellyn, Illinois 60137 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601

_____..____m________.-____________________.___.__________-____.-___-_.-_____--______.__.____._m_.____.___

]

ENCLOSURE 1 e

NLA/PM COUNTERPARTS MEETING AGENDA 2/05/91 1.

INTRODUCTIOt'S

-self Introduction agenda overview

-T.J. Kovach/R. Barrett comments 2.

NRR EXPECTATIONS FOR SALP l PERFORMANCE PM comments on problems or improvements 3.

LUNCH AND BREAKOUT FOR SITE SPECIFIC 19 SUES

. priorities and schedules 4.

STATUS OF LICENSING ACTIONS

. Tech Spec amendment submittals scheduled for 1991 i

status of those on the docket i.

j 5.

IlON CONFlRMATORY ORDER l

l

-removal process scope and schedule of activities l

l l

6.

GENERIC ISSUES

,l L

i ENCLOSURE 2 i

LIST OF ATTENDEES NLA/PH COUNTERPARTS MEETING, FEBRUARY 5, 1991 Ceco T. Kovach T. Simpkin T. Schuster D. Brindle A. Checca J. Langan S. Stimac R. Chrzanowski D. Taylor NRC R. Barrett W. Kropp C. Patel A. Hsia R. Pulsifer A. Moore t