Text
_ _ _ _ _ _ _ _ _ _ _.
l March.1, 1991 l
Docket No. 50-382 Mr. Ross P. Barkhurst Vice President Operations Entergy Operations, Inc.
Post Of fice Box B K111ona, Louisiana 70066
'sBJECT:- -INSERVICE TESTING (IST) FROGRAM FOR PUMPS AND VALVES WATERFORD STEAM ELECTRIC STATION, UNIT NO. 3, ENTERGY OPERATIONS,(TAC NO. 69819 INC. - CHANGE 1 (RELIEF PEQUESTS 2.1.5 AND 3.1.56) TO REVISION 6 This letter provides tne results of the staff's review of Revision 6, Change 1 to the Waterford Steam Electric Station, Unit No. - *.irvice testing program for pumps and valves. Louisiana Power and Light Company (previcus licensee) originally submitted the relief request in a letter dated August 21, 1989. On January 10, 1991,) additional information was submitted by Entergy Operations, Inc.
(currentlicensee withdrawing relief request 2.1.4, and revising relief requests 2.1.5, and 3.1.56.
The relief requests were revised to address NRC concerns discussed with the licensee on August 16, and November 6, 1990.
We have determined that Change 1 to Revision 6 is acceptable for implementation.
We have also determined that the testing requirements for which the relief request is being granted, (1) would result in undue hardship without a compen.
sating level of safety, pursuant to 10 CFR 50.55a(a)(3)ii, and (2) provides an acceptable level of This letter grants (a) quality ano safety, pursuant to 10 CFR 50.55a(a)(3)i.
pump relief request 2.1.5 and (b) valve relief request 3.1.56 from the ASME Code requirements as requested pursuant to 10 CFR 50.55a(a)(3)(ii). The basis for granting the relief requests are in the enclosed Safety Evaluation.
Program changes such as revisions or additional relief requests or deletion of any components from the IST program should be submitted for our review by should not be-implemented prior to NRC review and approval.
Please contact Acting Project Manager, L. Raynard Wharton at (301) 492-1108, if you need any clarification.
Sincerely, Original Signed By:
Paul W. O'Connor -
Theodcre R. Quay, Director
-Project Directorate IV-1 9103060300 9303o3 Division of Reactor Prcjects-III, IV, and V DR p
ADOCK 03000382 Office of Nuclear Reactor Regulation PDR
Enclosure:
DISTRIBUTION:
As stated 3 Docket File =
NRC & Local PDR PD4 1 Reading B. Boger (MS13E4)
T.
Gwynn M. Virgilio (MS13E4) cc w/ enclosure:
P. Noonan R. Wharton OGC (MS15B18)
See_next page E. Jordan MNBB3701 ACRS (10) MSP-315 P04-1 Plant File P. Hatrell, Region IV
- $ee Previous Concurrence OFC
- PD4-1/LA?
- PD4-1/FM
- 0GC
- PD4-1/(A)D K :
- .. %... < 4
..............:.L1......[.h............p...........................
HAME
- PNoonan\\
- RWharton:lh N
O iTQuay f t:
.......:..........a.{$ $C2/01/91 DATE
- 02/08/91 3
- P2) /9)
- 02/o(/91 OttICIAL RECORD COPY Document Name: W3 LlR/69819 f
MOOl8
(,
Mf ll
- - - ~ - - - - - -. - - -.
,9
. lpQ QICgo
=yN Iz UNITED STATES
c l[ (g, f [i n
7 NUCLEAR REGULATORY COMMISSION
~'
o,. -
WASHINGTON, D.C, 20666
%,' N /
March 1,1991
- Dockef*lio.50-382 Mr. Ross Pl Barkhurst Vice President Operations Entergy Operations, Inc.
Post Office Box B K111ona, Louisiana 70066 S' BJECT:
INSERVICE TESTIllG (IST) PROGRAM FOR PUMPS AND VALVES. WATERFORD STEAM ELECTRIC STATION, UNIT NO. 3 ENTERGY OPERATIONS,(TAC NO. 698 INC. - CHANGE 1 (RELIEF REQUESTS 2.1.5 AND 3.1.56) TO REVISION 6 This-letter provides:the rescits of the staff's review of Revision 6, Change 1 to the Waterford Steam Electric Station, Unit No. 3 inservice testing program
-for pumps and valves. Louisiana Power and Light Company (previous licensee)
-originally submitted the relief request in a letter dated August 21, '%9.
On.
January 10,1991,) additional information was submitted by Entergy Opruions, Inc.
(current licensee withdrawing relief request 2.1.4, and revising relief requests 2.1.5,_ and 3.1.50.
The relief requests were revised to address NRC concerns discussed with the licensee on August 16, and November 6,1990.
We:have determined _that Change 1.to Revision-6 is acceptable for implementation.
We have also determined that the testing requirements for which the relief request is being granted, (1) would result in undue hardship without a compen-
. sating!1evel of safety Pursuant to 10 CFR 50.55a(a)(3)ii, and (2) provides an acceptable 1evel of, quality 'and safety, pursuant to 10 CFR 50.55a(a)(3)1.
This -letter grants (a) pump relief request.2.1.5 and (b) valve relief request 3.1.56:from-the ASME-Code requirements es requested pursuant to 10 CFR -50.55a(a)(3)(ti). The basis for granting the relief requests are in the
-enclosed Safety Evaluation.
Program changes such as revisions or additional relief requests or deletion of anyLcomponents from the IST program should be submitted for our review by should not be implemented prior to HRC' review and approval.
Please contact Acting Project Manager, L. -Raynard-Wharton at (301) 492-1108, if you.need any clarification.
Sincerely,
{ow Theodore P.. Quay Director Project Directorate IV-1 Division of' Reactor Projects III, IV, and-V Office of Nuc ker Reactor Regulation
Enclosure:
As stated-U
-cc w/ enclosure:
See next page-a
.w
r
~u Mr.-Ross P.-Barkhurst-Entergy ' Operations, Inc.
Waterford 3 CC L-Mr.-E. Blake-Regional Administrator, Region IV Shaw,. Pittman, Potts & Trowbridge U.S. Nuclear Regulatory Commission 2300 N; Street, NW Cf fice of Executive Director for
-Washington, D.C. -20037-Operations-611 Ryan P162a Drive, Suite 1000
- Mr. Glen Miller, Administrator Rediation Protection Division Resident inspector /Waterford NPS Office of Air Quality and Nuclear Energy Arlington, Texas 76011 Post Office Box 14690 Post Office. Box 822 Baton Rouge, Louisiana -70898 Killona, Louisiana 70066 President, P6rish Council Mr. - Gerald 'W.
Muench St. Charles Parish Vice President, Operations Hahnville, Louisiana 70057 Support-Entergy Operations,'Inc.
Mr. Donald C. Hintz P. O. Box 31995 Executive Vice President and Jackson, Mississippi 39286 Chief Operating Officer Entergy Operations, Inc.
7
- William A. Cross P. O. Box 31995 Bettesda Licensing Office Jackson, Mississippi 39286 13 Metro Center Suite 610 Chairman
.Bethesda, Maryland 20814 Louisiana Public Service Commission One American~ Place, Suite 1630 LMr.1 Robert B. McGehee Baton Rouge, Louisiana 70825-1697 Wise, Carter,. Child &-Coraw'ay P. O. Box 651' Mr. R. F. Burski, Director
~Jacksons Mississippi 39205-Nuclear Safety Entergy Operations,.Inc.
-.Mr. J. R. McGaha, Jr.
317 Baronne Street General--Manager Plant-.0perations
- New Orleans, Louisiana 70112 Entergy Operations, Inc.
P. O. Box B.
Mr. L. W. Larghlin, Site Licensing Killona,. Louisiana.70060 Support Supervisor Entergy Operations, Inc.
.Mr.JJerrold G. Dewease P. 0... Box-1 Sr. Vice President Killona, '.ouisiana - 70066
-Planning &-Assurance Entergy Operations, Inc.
e Post.0fice Box 31995-Jackson, Mississippi 39286-1995
,w-h 3,
,,9.,
--,,e-3 m.,
as a--,
.:,m+,e s
w=e a
m a---r
--mi--
-