Ack Receipt of Informing NRC of Tentative Plans & Prioritization for Revising Emergency Operating & Abnormal Operating Procedures,
ML20029B011
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/20/1991
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gates W
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9103050238
Download: ML20029B011 (2)


Text

4 FEB 2 01991 Dociet 110. 50-205/90-20 License No. DPk-40 Ornaba Public Power District ATTit:

V. G. Gates, Division Menager Nuclear Operationt 444 South 16th Street itall t' ail Stop 8E/EP4 On.ata, liebras ka 08102-2247 Gentlen'en:

Thank you for your letter (LIC-91-039R) of January 30, 1991, docketing your tentative plans and prioritization for revising your emergency eprating procedures end abnorrnal operating procedures. We will review the implementation i

of your corrective ections during a future inspection.

Sincerely, Original Sancd Dy:

Samuel J. Co.lms Samuel J. Collins, Director Division of Reactor Projects

Enclosure:

Omaha Public Power District letter llc-91-039R cc w/ enclosure:

LeBoeuf, Lamb, Leiby & MacRae AT1N:

Harry H. Voigt, Esq.

1333 New Hampshire Avenue,liW Washington, D.C.

20036 Washington County Board of Supervisors ATTH: Jack Jen:,en, Cha irman Clair, Hebraska 68000 Combustion Engineering, Inc.

ATTH: Charles C. Brinkman, Manager Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 TMcKernon/cag$MAC:0 psp AD:DRS jo M RIV:RI:0PSq D 1RP DKelley JPJaudon'

.JC611, ins d

J//j/91 1 /A /91 gj\\/91

/91 h

9103050230 910220 gDR ADocKoSoog'jS

4 Omaha Public Power District

-P-i Hebraska Department of Healtn

[

ATTN:

Harold Dorchert, Director Division of Radiological Health 301 Centennial fiell, South P.O. Box 95007 Lincoln, Nebraska 68509 Fort Calhoun Station ATTN:

T. L. Patterson,flanager P.O. Box 399 Fort Calhoun,liebraska 68023 bec w/ enclosure:

bec to DMB (IE01) bec distrib, by RIV:

R. D. Martin Resid?nt Inspector DRSS-RPEPS Section Chief (DRP/C)

MIS System RIV file DRP RSTS Operator Project Engineer (DRP/C)

Lisa Shea, PM/ALF DRS Senior Resident inspector - Cooper Senior Resident inspector - River Bend A. Bournia, NRR Project flanager (MS:

13-D-18 )

T. McKernon D. Kelley J. Gagliardo l

w

-$mre,--

7 --..

7 m

l,,...

_N t

f-r

~'(

Omahs Public Power District 4445cuth 16th Street tial!

i Omaha. Nebraska 68102 2247 re-@,~

s

~

.102/636 2000

! ))f

' ' ~

January 30, 1991 gj; LIC-91-039R i

l pg 3 jggl 4

\\

N

~

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, DC 20555

Reference:

1.

Docket No. 50 285 l

2.

Letter from NRC (S. J. Collins) to OPPD (W. G. Gates) dated October 31, 1990 (Inspection Report 50-285/90-20)

Gentlemen:

SUBJECT:

Emergency Operating Procedures (EOPs) and Abnorn.al Ope rating Procedures (A0Ps) Revisior. Prioritization During a meeting with NRC Region IV staff on December 20, 1990, Omaha Public l

Power District (0 PPD) committed to identify our priorities for revising the E0Ps/A0Ps for Fort Calhoun Station linit No.1.

Please find attached a tentative prioritization schedule for revising the E0Ps and A0Ps.

The revisions to the E0Ps/A0Ps will be done after the human factors rewrite of the Writer's Guide is completed.

If you should have any questions, please contact me.

Sincerely, 8(/. b. s l

s W. G. Gates Division Manager Nuclear Operations WGG/sel Attachment J

c:

LeBoeuf, Lamb, Leiby & MacRae R. O. Martin, NRC Regional Administrator, Region IV W. C. Walker, NRC Project Manager i

9-\\

R. P. Mullikin, NRC Senior Resident Inspectnr 45 512~

Empeyr Occataty 97g76G~07Gh.

~._.

s htt3CWmrf Pyjn/J;ized Schedule fcr_BLvi5).as i E0Ps _ d AOPs j Q.Ilt St snctrd kost Trik Actions E0P 00 Opt \\nal Rtcovery Protv1cres E0P-01 thru E0P-07 Functional Recovery Procedure E0P-20 AQh loss of Shutdowo Cooling AOP-19 RCS Leak Proceduee A0P 22 SS Tube Rcrture A0P-24 Loss of Vital Auxiliary Components AC Buses A0P-32 Instrument Buses A0P 16 Instrument Air A0P-17 Component Cooling Water AGP ll Raw Watet f00 1;8 Remainder of AOPs k numerical order Please note tnat the schedule may require alteration as tiie process c17t',nuti.