ML20029A808

From kanterella
Jump to navigation Jump to search
Requests Addl Info on EPRI Advanced LWR Requirements Document for Passive Plant Designs.Proprietary Encl Withheld (Ref 10CFR2.790)
ML20029A808
Person / Time
Issue date: 02/22/1991
From: Joshua Wilson
Office of Nuclear Reactor Regulation
To: Kintner E
ALWR UTILITY STEERING COMMITTEE
Shared Package
ML19310D271 List:
References
PROJECT-669A NUDOCS 9103040286
Download: ML20029A808 (3)


Text

_ _-

o

~

february 22, 1991 Project No. 669 Mr. E. E. Kintner, Chairman Adhneed Light Water Reactor Steering (nisnittee GPU Nuclear corporotion 100 Inttrpace Parkway Parsippany, New Jersey 07004

Dear Mr. Kintner:

SOBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON EPRI ADVANCED LIGHT VATCR P.EACTOR(AlkR)REQUIRFMfHTSDOCUMEllTTORPASSIVEPLANTDESICNS As a result of its review ot Volume 111 of the EPRI ALWR Requirements Document, sut.mitted by letter dated September 7,1990, the staff has determined thet it needs udditional inferiretion in order to complete its review of the d(sign criteria.

The additionel information is needed in the areas of the reactivity, physics, fuels and fuel storage criticality aspects of Chapters 4 and 7.

Our concerns are discussed in the enclosure to this letter.

You have requested that the inforr.ation subinitted by letter dated September 7, 1990 be exempt from mandatory public disclosure.

While the staff has not coirpl,oted its review of your request in accordance with the requirements of 10 CFR 2.790 concerning the inerits of your request for proprietary treatinent, this inferiration as well as any corres30ndence pertaining to it will be with-held f rot public disclosure, pending t1e staf f's final determination.

The reporting and/or recording roouirements contained in this letter af fect fewer then ten respondents; therefore, OMB cicarance is not required under P.L.96-511.

P1tese respond to this request within C0 days of the date of this letter.

If you have any questions regarding this matter please contact the project inanagers T. Kenyon or J. Wilson, at (301) 492-1118.

Sincerely, Original signed by:

Jarnes H. Wilson, Project. Manager Standardization Project Directorate Division of Nronced Reactors and Special Projects Office of Nuc1 car Reactor Regulation As stated This document, when separated from the enclosure, is cc w/ enclosure:

not subject to withholding requirenehts of 10 CFR 2.790.

See next page DISTRIBUT10th TBoyce NRC PDR w/o enclosure Eiitra T File JWilson TKeny(onACR$ 10), P-315 PDST R/T w/o enc 1 EJordon, MNBD3701 w/o PShea w/o enc 1 CHolzle, OGC, 15B18 w/o DOCUMENT HAME: SRX0 PM:PDS PH;Id D:PDST gig. d.

.)

f LA:PD

.j

! itr s

PShea >

JWilso TG yon CN111e f'O 02/h /91 0 2 / 21 /

02/

91 02/Lu/91 n = =

  • 222 HRC R.iCENIB CBM.

'g.

PROJ-669 PDR

\\

j

,