ML20029A378

From kanterella
Jump to navigation Jump to search
Request Addl Info to Facilitate NRC Review of Rev 0 to Nov 1990 QA Plan.Clarification of Changes to Title of Figure 1 to QA Line Organization. Editorial Comments Encl
ML20029A378
Person / Time
Site: University of Texas at Austin
Issue date: 02/15/1991
From: Brach E
Office of Nuclear Reactor Regulation
To: Weiss S
Office of Nuclear Reactor Regulation
References
NUDOCS 9102210127
Download: ML20029A378 (3)


Text

,.

p me:y M

7,,

UNITED s TATES

[, 3 ei n

NUCLE AR R(iGULATORY COMMISSION i

e As w o m s.o.c m ss

%. =...+J February 15. 1991 Docktt No. 60 602 i

MEMORANDUM FOR:

Seycour H. Weiss, Director Nun-Power Reactor,l Project Directorate Decocnissioning and Environmenta l

Division of Advanced Reactors and Special Projects Of fice of Nuclear Reactor Regulaticn FROM:

E. William Brach, Chief Performance and Quality Evaluation Branch Division of Licenste Performance and Qu611ty Evaluation Office of Nuclear Reactor Regulation SUNECT:

QA PLAN FOR UNIVER$1TY OF TEXAS TRIGA REACTOR in accordance with the work request of February 7,1991, we have reviewed resision 0 of the University of Texas' QA Plan.

Revision 0, November 1990, was submitted to the Nhc by letter dated November 21,199C.

The letter indi-cates the subniittel contains no substentive changes or revisions to the previ.

ously approved QA Plen documents. Our acceptance of the previous QA Plan Documents is reflected in a Grimes to Thomas memorandum dated April 23, 1985 (Fiche 67823/0f9-071) l Our review of revision 0 consisted of comparing it to the previously accepted QA Plan documents (SAR Chapter 9 plus changes of April 4 1985, Fiche 29784/

284208),

in addition to several editorial cournents enclosed, we need a response to the follwwing request for additional information to complete our review:

The title of Figure I has been changed from " Academic Organization" to "00ALITY ASSURANCE Line Organization." The figure no longer shows a

" Reactor Conrnittee" nor " Licensee Certified Operators." A facility o?erations committto is still referred to in Section 4.2 of the plan, and t1e deletion of the committee f rom Figure 1 needs to be clarifitd.

Similarly, the plan needs to continue to be clear reg 6rding operation of the reactor only by qualified operators.

O f

s.S 9102210127 910215

)

ADOCKODOOg2 PDR

o February 15, 1991 Seymour H. Weiss

.P, We believe that these items can be taken care of by telephone call with the applicant. Our reviewer, Jack Spraul, is available for such a call to te arranged by your PM.

Original Signed by:

E. William Brach, Chief Performance and Quality Evaluetion Branch Division of Licensee Performance and Quality Evaluation Office of Nuclear Reacter Regulation Enclosure DISTRIBUTION:

(Cer. tral,FHe?

PDR LPED R.F.

JWRoe COThomas EWBrach EWickenna JGSpraul(2)

W0 Travers AAdams UTC

-:LPEB:DLPQ

50:LPED:DLPQ :C:LPENOLPQ NAME,)JGSpraul:jp..................... :../:; 44.,b'a,.

... :...f 'h: E WB r k........ :..........

EMMcKen

......:................:..............:.../.y........:..............:..............:.............

DATE

02/)d/91
02/H/91
02/l5/91 0FFICIAL RECORD COPY Document Name: MEMO TO WEISS a

F i

l o

I Enclosure 3'

1 t

\\

Editorial Comments 2.

The last paragraph in Section 1 ends with: (9,10). These appear to be references to Regulatory Guide 2.5 and ANSI /ANS-15.8.

Clarify.

i The'last sentence in Section 1.3 ends with: Figure 3.

It appears this 2.-

should be Figure 1.

3.

The last sentence in Section 2.3 ends with: Table 2.

It appears this should be Table =3.

4.

The.16st paragraph in Section 4.1 says "Related to as TRIGA reactor...."

!t appears this should be "related to a TRIGA reactor...."

i 5

I t

t t

?

a.

4 1

I r

y.

l l

6 L

4