ML20029A308

From kanterella
Jump to navigation Jump to search
Forwards Proprietary PFE-G22 & Nonproprietary PFE-G22NP, Sequoyah Nuclear Plant Unit 2 Restart Physics Test Summary, Covering 900921-1231.Proprietary Rept Withheld (Ref 10CFR2.790)
ML20029A308
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/11/1991
From: Wallace E
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19310E612 List:
References
NUDOCS 9102150023
Download: ML20029A308 (5)


Text

v 1

'j t

7 IUA Tennes ee vey ot% not uwket street crammka temee an$

i FEB 111991 l

U.S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington, D.C.

20555 Gentlemen:

In-the Matter of.

)

Docket No. 50-328 Tennessee Vailey Authority

)

i SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 - START-Up REPORT FROM THE UNIT 2' CYCLE 4 REFUELING OUTAGE - OPERATING LICENSE DPR-79 i

i In accordance with the requirements of SQN Unit 2 Technical Specifications 6.9.1.1, 6,9.1.2,-and.6.9.1.3, Enclosures 1 and 2 provide the._the propriet,ary and nonproprietary versions, respectively, of the summary report of plant start-up and power escalation testing following installation of Vantago SH fuel assemblies.

This test summary report covers the period from September 21 to 1,ecember 31, 1990.

l Also providod-in Enclosure 3 are a Westinghouse Electric Corporation p

authorization letter, CAW-91.-117, accompanying af fidavit, proprietary

.Information Notice, and Copyright' Notice.

\\

Because Enclosure l' contair ormation proprietary to Westinghouse, it is supported by an affidat t,gned by Westinghouse, the-owner of the information. The affidavit sets forth the. basis on which the information 1

may be withheld from public disclosure by_NRC and addresses with specificity the considerations listed in paragraph (b)(A) of Section 2.790 of'NRC regulationu.

Accordingly, it is respectfully requestod that the information, which is

.[

. proprietary to Westinghouse, be withheld fre;n public disclosure in accordance with 10 CFR Section 2.790 of NRC regulations.

2 Correspondence with-respect to the copyright or proprietary aspects of

(

the items listed above or the supporting Westinghouse affidavit should E

reference CAW-91-117 and should be addressed to R. A. Wiesemann, Manager of-Regulatory and Legislative Affairs Westinghouse Electric Corporation, p.0. Box 355, pittsburgh, pennsylvania 15230-0355.

il' i'

9102150023 910211 AD

-PDR ADOCK 05000328 ff fO/

P PDR gj,

v

-q~ ~

m -.

f,

+

q.- w

+ t, h1klp Y

g.

m

+.

U.S. Nuc1Aar: Regulatory Commission-FE84 L391 q-No' commitments are contained in this submfttal.

Please direct questions concerning;this issue to J.LD. Smith atL(515)'843-6672.

. Very truly yours,

=s TENNESSEE VALLEY AUTHORI*H j-fi w E.:G. Wa lace,' Manager

.. Nuclear Licensing and'-

Regulatory Affairs

. Enclosures ce (Enclosures 2 and 3):'

Ms.=S. C.: Black,-Deputy Director

' Project Directorate II-4:

.U.S.1-Nuclear Regulatory Commission--

One White Flint, North:

-4 11555 Rockville Pike l

Rockville, Maryland:'20852-E Mr.1J. N.:Donohew, Project Manager

/

yU.S. Nuclear' Regislatory. Commission -

e 10ne White Flint, North' 1

11555 Rockville Pike Rockville,. Maryland-20852

'NRC, Resident Inspector y

~

_Sequoyah Nuclear-Plant 2600 Igou Ferry' Road:

Soddy Daisy.. Tennessee. 37379

'Mr. B.-A., Wilson, Project Chief U.S.. Nuclear Regulatory Commission

~ Region II 101;Marietta Street, NW, Suite!2900 JAtlanta, Georgia: 30323 s-.

E l

.a

,\\

\\

Y ^-

.. s,, +,.+ N. i hn,,- num...++r.

, w e r e.

,w-4

+

e an

. + +.

n o. - +