Forwards Reactor Containment Bldg Integrated Leakage Rate Test (ILRT) Rept.Rept Summarizes ILRT Conducted During Second Refueling Outage.Summary of Results for Local Leakage Rate Tests Performed,Per Previous ILRT Also Encl
ML20029A132
Person / Time
Site: Beaver Valley
Issue date: 01/23/1991
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20029A133 List:
References
NUDOCS 9102040198
Download: ML20029A132 (1)


Text

Duquesne @t Coriipany prcy "-

~-

<,nw,,n va y a au f>+N D Li M A t re besatura fu.+c Q, p

...i y n I pu U.

S.

Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 heactor Containment Building Integrated Leakage Rate Test Gentlemen:

Enclosed is the 1990 Beaver Valley Unit No. 2 Reactor Containment Building Integrated

' Leakage Rate Test Report submitted in accordance with Appendix J

of 10CFR Part 50.

The report provides a summary of the Integrated Leakage Rate Test conducted at BVPS Unit No. 2 during the second refueling outage.

Also submitted with this report is a summary of results for all local leakage rate tests performed since the previous integrated leakage rate test.

Sincerely,

/

.J.

D.

Sieber Vice President Nuclear Group Attachment cc: Mr. J.

Beall, Sr. Resident Inspector Mr.

A.

W.

DeAgazio, Project Manager Mr.

T.

T. Martin, NRC Region I Administrator Mr.

R.

Saunders (VEPCO)

'0/7 (I

9102040198 910123 ADOCK 0500g 1,

PDR P

~,.