ML20028H747

From kanterella
Jump to navigation Jump to search
Submits Addl Info Re 901217 Tech Spec Change Request 90-11 on MCPR Safety Limit Changes Required for Cycle 9 Operation Per 910117 Telcon W/Nrc.Corrected Tech Spec Pages Encl
Date released: 02/11/2020 Download: ML20028H747


Proposed Tech Spec 6.9.1 Re Routine Repts & 2.1 Re Fuel Cladding Integrity
ML20028H748
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 01/22/1991
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20028H748 (3)
Submits Addl Info Re 901217 Tech Spec Change Request 90-11 on MCPR Safety Limit Changes Required for Cycle 9 Operation Per 910117 Telcon W/Nrc.Corrected Tech Spec Pages Encl
ML20028H746
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 01/22/1991
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20028H746 (4)