Amends 20 & 10 to Licenses NPF-76 & NPF-80,respectively, Revising TS Re Organizational Titles
ML20028H248
Person / Time
Site: South Texas  
Issue date: 11/14/1990
From: Dick G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20028H249 List:
References
NUDOCS 9011190242
Download: ML20028H248 (9)


Text

___

1, i h-O s*"*%

p(b k

UNITED STATES -

3:,

.g NUCLEAR REGULATORY COMMISSION

- 7, 9j WASHINoToN, D. C. 20565 l

HOUSTON LIGHTING & POWER COMPANY CITY PUBLIC SERVICE BOARD OF SAN ANTONIO CENTRAL POWER AND LIGHT COMPANY CITY OF AUSTIN, TEXAS DOCKET NO. 50-498 SOUTH-TEXAS PRUJECT; UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Q

Ar.endment No. 20 -

L" cense No. NPF-76 1.

The' Nuclear.~ Regulatory Commission (the Commission)' has f :und that:

_A..

The application for amendment by Houston Lighting & t,wer

. Company *.(HL&P) acting on behalf of itself.and for the City Public Service Board of San Antonio-(CPS), Central Powe' and Light Company (CPL), and City'of Austin, Texas (COA)-(the licensees) dated December 18 1989,: as supplemented on July 30,.

1990, complies with the standards and requirements of the Atomic Energy Act of'1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; lB.

The facility wil.1; operate in conformity with the application, as amended. the provisions' of the - Act,'and the rules and regulations 7

of:the Commission;.

4a1 a

C.

There.is reasonable assurance:'. (1) that the activities authorizedi by-this amendment can> be conducted without' endangering the health 4

.and' safety.of the public, and (ii) that'such activities wi'41 be conducted in compliance with the Commission's regulations; L D.

The N uance of'this license anendment will not be inimical to the-E.

comm.i defense and security or to the health and safety of.the.-public;-

'and-

,i)

T.7 E.

The, issuance of this amendment is in accordance-with 10 CFR Part 51 4'

of the Commission's regulations and all applicable requirements have 7

1 been. satisfied.

WN.

(

sy

[

  • Houston Lighting &. Power Company is authorized to act for the City Public

--Service Board.ofzSan Antonio, Central Power and Light Company and City of

" 'P 1 Austin,': Texas.and has exclusive-responsibility and control.cver the physical

. construction, operation and maintenance of the facility, m -

m' o011190242 901114 EUR ADOCK 05000498 P

PDC "c

q..

s n:

A 2.

Accordingly, the-license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-76 is hereby amended to read as follows:

2.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 20, and the Environmental Protection Pian

  • untained in-Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, 3.'

The license amendment-is effective as of its date of issuance.

s FOR THE NUCLEAR REGULATORY COMMISSION I

L u

Georg F. Dick,' Jr., Acting Director

-Project Directorate IV-2 Division of Reactor Projects - III, TV,'V and Special Projects Office of Nuclear Reactor Regulation

/

Attachment:

1

' Changes to the Technical Specifications' Date ofilssuance:

November 14,' 1990

~

s i

5

's'k

+}

ll f-i k

. - r.-

t 4

1

1. ;

[

b' UNITED STATES e

.c[

'I g-NUCLE AR REGULATORY COMMISSION

-l WAsHINoToN, D. C. 2055s f

j 1*

i HOUSTON LIGHTING & POWER COMPANY

. CITY PUBLIC SERVICE BOARD OF SAN ANTONIO CENTRAL POWER AND LIGHT COMPANY CITY OF AUSTIN, TEXAS DOCKET NO. 50-499.

1 SOUTH TEXAS PROJECT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amert %ent No.10 1

License No. NPF-80 l

1.

. The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application.for amendment by Houston Lighting & Power 1-Company *?(HL&P) acting on behalf of itself and for the City Public Service Board of San Antonio (CPS), Central Power and

.c 1

4 Light Company (CPL),'andL City of Austin, Texas (C0A) (the.

-1

.m

. licensees) dated December 18,~1989, as supplemented on July 30, 7

1990, complies with the standards and requirements of the Atomic s

Energy Act'of 1954, as= amended (the Act), and the Commission's
i m>

<x y

rules and regulations set forth;in 10 CFR Chapter I;

{

B;

Theifacility will operate in~ conformity with the application, as amended, the' provisions.of the Act, and the rules and regulations

,.. V of the Commission;-

,o C.

There is reasonable-assurance:.(i) that'the activities. authorized by this amendment can be. conducted without endangering.the health:

3 a

and safety:of the public, and'(ii) that such activities will be

f D.

l conducted in compliance with the Commission's regulations; h

D..

The.iss mce' of this " license amendment will-not be inimical to the:

i

.6 common e "ense and: security.or to the health and safe _ty of the public; i.y l

and

?

E.

The issuance of this amendment is in accordance with 10 CFR Part-51.

i g

of the' Commission's regulations' and all applicable' requirements have Mpn been satisfied.-

l i

y w

=

  • i b,'
  • Houston Lightin'l & Power Company is authorized to act for the City Public-U

. Service Board o1 San Antonio, Central Power and Lige.t Company and City of Aus*in, Texas and has exclusive responsibility and control over the physical construction, operation end maintenance of the facility.

>s q) w a

v j

f I l l.Y <

8 m.

n..

'2.

Accordingly,-the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. NPF-80 is hereby amended to read as follows:

2.

Technical Specifications The Technical Specifications contained in Appendi'. A, as revised through Amendment No.10, and the Environmental Protection Plan contained in Appendix B, are hereby inccrporatt.d in the license.

y,

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan..

3.

The license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION (k

4 F. Dick, Jh.//

Geor

, Acting Director Project Directorate IV-2 i

Division of Reactor Projects - III, 4

IV, V and Special Projects Office of Nuclear Reactor Regulation

Attachment:

i Changes to the Technical LSpecifications.-

Dateiof Issuance:. November 14, 1990 1

1 8 1 np l~'

> h a-U h'

t),

\\l-1-

-:[ y m imi

n o

h S @* &

t,

o. @j'*%f#

TEST TARGET (MT-3)

IMAGE EVALUATION

/ /,4'4 #g,

%'t, k!/

f3

~~

\\+

m

?

1.0 l#mE4 glll'RE

~

~

u L" ILE U1

'" 1.25 T l.4

,' i.6 150mm 4

6" 4

A' h?

  1. p 4

gd'%rjgr

,'4$[4 3

=

V ya&:

- a4 e..}

=_..

4 p $er l

R%, l</,8,,,

/,gf y4,,,

IMAGE EVALUATION y

4)y y" #&

1.s11 Anoe1 (m13) gy,,,,+

=

P 1

1.0 E 2 EH

@ $ E2, n= m u

m.-

1.25

  • l.4 1.6 eme 150mm 4

6" 4-

/!b

$?;r//e

+

n <>+(gt.%

3,ii

+,p4

=

7g w!'l

. O!

O

{

u u

. ' b ^b0 ;

h ?h o <

'G NN

w. ;;&.;1ai e

W

%h

  • N>@' *'d 8

q,

///#p/

llIl s(%/p%g #*4 IMAGE EVALUATION N[o///7

['.

%f/

9 TEST TARGET (MT-3)

  1. ?

QY/

s+

l.0 li m IEt s y IB3 E = lille l.l m

  • I.25 l.4 i.6

=

., = =

150mm 4-6" 4

?'%

/ 54

+$y%,,y

, <g(b

///

y

y L

n y,

y

ATTACHMENT TO LICENSE AMENDMENT NOS. 20 AND 10 FACILITY OPERATING LICENSE NOS. NPF-76 AND NPF-80 DOCKET _NOS. 50-498 AND 50-499 Replace the. following pages of the Appendix A Technical Specifications with the attached pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change.

The corresponding overleaf pages are also provided to maintain document completeness.

REMOVE INSERT 6-7 6-7 6-10 6-10

ADMINISTRATIVE CONTROLS 6.4 TRAINING 6.4.1 A retraining and replacement training program for the unit staff shall be maintained under the direction of the Training Manager and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 1

and Appendix A of 10 CFR Part 55 and the supplemental requirements specified in Sections A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees, and shall include familiarization with relevant industry operational experience.

6.5 REVIEW AND AUDIT 6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)

FUNCTION 6.5.1.1 The PORC shall function to advise the Plant Manager on all matters related to nuclear safety.

COMPOSITION 6.5.1.2 The PORC shall be composed of six members, who shall be appointed in writing by the Plant Manager from senior experienced onsite individuals, at I

the manager level or equivalent, representing each of the following disci-plines:

engineering, operations, chemistry, health physics, quality assur-ance/ quality control and maintenance.

The quality assurance / quality control representatives shall not be appointed as PORC Chairman.

The PORC Chairman shall be appointed in writing from among those members by the Plant Manager.

One of the members shall meet the requirements of Regulatory Guide 1.8 (Personnel Selection and Training - Revision 1-R),

Radiation Protection Manager.

ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the Plant Manager to serve on a temporary basis; however, no more than two alternates shall participate as voting members in PORC activities at any one time.

MEETING FREQUENCY 6.5.1.4 The PORC shall meet at least once per calendar month and as convened by the PORC Chairman or his designated alternate.

QUORUM 6.5.1.5 The quorum of the PORC necessary for the performance of the PORC responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or his designated alternate and three other members including alternates.

SOUTH TEXAS - UNITS 1 & 2 6-7 Unit 1 - Amendment No. 4,20 Unit 2 - Amendment No. 10

~.

ADMINISTRATIVE CONTROLS

~

RESPONSIBILITIES

6. 5.1. 6 The PORC shall be responsible for:

Review of all safety-related station administrative procedures and a.

changes thereto.

b.

Review of safety evaluations for (1) procedures, (2) changes to procedures, structures, components, or systems, and (3) tests.or experiments completed under the provisicn of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.

Review of proposed (1) procedures, (2) changes to procedures, struc-c.

tures, components, or systems, and (3) tests or experiments which may involve an unreviewed safety question as defined in 10 CFR 50.59.

d.

Review of all programs required by Specification 6.8 and changes thereto.

Review of proposed changes to the Technical Specifications or the e.

Operating License.

f.

Review of all REPORTABLE EVENTS.

g.

Review of reports of significant operating abnormalities or devia-tions from normal and expected performance of plant equipment or systems that affect nuclear safety.

h.

Review of reports of unanticipated deficiencies in the design or i

optration of structures, systems, or components that affect nuclear-s a f t.ty, i.

Review of the Security Plan and implementing procedures and changes

thereto, j.

Review of the Emergency Plan and implementing procedures and changes thereto.

k.

Review of the PROCESS CONTROL PROGRAM and implementing procedures and changes thereto, 1.

Review of the OFFSITE DOSE CALCULATION MANUAL and implementing proce-dures and changes thereto.

Performance of special reviews, investigations, or analyses and reports m.

thereon as requested by the Plant Manager or the Nuclear Safety Review J

Board (NSRB).

Review of any accidental, unplanned, or uncontrolled radioactive re-n.

lease including the preparation of reports covering evaluation, rec-ommendations, and disposition of the corrective action to prevent-recurrence and the forwarciing of these reports to the Plant Manager 1

J and to the NSRB.-

i Reports of violations of codes, regulations, orders, Technical Spect-o.

fications, or Operating License requirements having nuclear safety significance or reports of abnormal degredation of systems designed to contain radioactive material.

Review of the Fire Protection Program, quality-related implementing p.

procedures and changes thereto.

SOUTH TEXAS - UNITS 1 & 2 6-8 i

p ADMINISTRATIVE CONTROLS RESPONSIBILITIES (Continued) i L

6.5.1.7 The PORC shall:

Recommend in writing to the Plant Manager approval or disapproval a.

of items considered under Specification 6.5.1.6a. through e. prior to their implementation, and items considered under Specifica-tion 6.5.1.61. through 1.

b.

Render determinations in writing with regard to whether or not each item considered under Specification 6.5.1.6a. through e. and o, con-stitutes an unreviewed safety question; and Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Group Vice c.

President-Nuclear and the Nuclear Safety Review Board of disagreement i

between the PORC and the Plant Manager; however, the Plant Manager shall have responsibility for resolution of such disagreements pur-1 suant to Specification 6.1.1.

RECORDS

6. 5.1. 8 The PORC shall maintain written minutes of each PORC meeting that, at a minimum, document the results of all PORC activities performed under the responsibility provisions of these Technical Specifications.

Copies shall be provided to the Group Vice President-Nuclear and the Nuclear Safety Review Board.

6.5.2 NUCLEAR SAFETY REVIEW BOARO (NSRB)

FUNCTION 6.5.2.1 The NSRB shall function to provide independent review and audit of designated activities in the areas of:

Nuclear power plant operations, a.

b.

Nuclear engineering, c.

Chemistry and radiochemistry,

d. -

Metallurgy, e.

Instrumentation and control, f.

Radiological safety, i

g.

Mechanical and electrical engineering, h.

Civil engineering, i.

j..
Training, Nuclear assurance, k.

Nuclear licensing, 1.

Plant security, and m.

Environmental impact.

The NSRB shall report to and advise the Group Vice President-Nuclear on those areas of responsibility specified in Specifications 6.5.2.7 and 6.5.2.8.

SOUTH TEXAS - UNITS 1 & 2 6-9

ADMINISTRATIVE CONTROLS COMPOSITION 6.5.2.2 The NSRB shall be composed of at least five members appointed in writing by the Group Vice President, Nuclear selected from senior managers reporting to at least the vice president level in the STPEGS Management

~

Organization.

Additional members shall be appointed in writing by the Group Vice President, Nuclear so the NSRB collectively has the capability to review technical matters listed in Technical Specification 6.5.2.1.

The NSRB Chairman shall be appointed in writing from among these members by the Group Vice President, Nuclear.

ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the Group Vice President-Nuclear to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NSRB activities at any one time.

[

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NSRB Chairman to provide expert advice to the NSRB, MEETING FREQUENCY 6.5.2.5 The NSRB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per 6 months thereafter.

QUORUM 6.5.2.6 The quorum of the NSRB necessary for the performance of the NSRB review and audit functions of these Technical Specifications shall consist of the Chairman or his designated alternate and at least a majority of NSRB members including alternates. No more than a minority of the Quorum shall have line responsibility for operation of the unit.

REVIEW 1

6.5.2.7 The NSRB shall be responsible for the review of:

a.

The safety evaluations for:

(1) changes to procedures, equipment, or systems; and (2) tests or experiments completed under the provision of 10 CFR 50.59, to verify that such actions did not constitute an unreviewed safety question; b.

Proposed changes to procedures, equipment, or systems which involve an unreviewed safety question as defined in 10 CFR 50.59; SOUTH TEXAS - UNITS 1 & 2 6-10 Unit 1 - Amendment No. f 20 Unit 2 - Amendment No.10 f

.