LER 83-001/03L-0:on 830101,during Reactor Bldg Purge,Station Radiation Monitor RM-A9,iodine Channel,Failed.Caused by Single Channel Analyzer Circuit Board Failure.Circuit Board Replaced & Quarterly Calibr Performed
ML20028G377
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/01/1983
From: Stephenson C
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20028G376 List:
References
LER-83-001-03L, LER-83-1-3L, NUDOCS 8302090175
Download: ML20028G377 (3)


Text

-

(7 77)

. - LICENSEE EVENT REPORT (PLE ASE PRINT 071 TYPE ALL REcul AED INFORMATION)

CONTROL BLOCK: l i

l l l l l lh e

10l1llP!AlTlMITl1lh 7 8 9 LICENSEE CODE 14 15 l l l l l l LICENSE NUMBER l l l l l@l4 l1l1 25 2G l1 l ll@l57 CAT LICENSE TYPE JO l

b6 l@

CON'T lol11 3[RcE60l L l@l 0 l 5DOOKET l 0 l NUMBER 0 l 0 l 2 l 868 1969l@l EVENT 0 11DATE l0 l1 l 813l@l0 74 75 l 2l 0] ll 8l 3l@ 80 7 8 61 REPORT DATE EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h

[o l2l l During shutdown while RB Purge was in progress, station radiation monitor RM-A9, iodind l o l 31 l channel, failed. No significant occurrence took place. The particulate and noble gasl

~

p ;4l l channels of RM-A9 were operable. No iodine above background was oresent since plant I t o l s t lhas been in cold shutdown since 1979. Public health and safety were unaffected. l I o Is l l Reportable per 6.9.2.B(2) -l l0 l7l l l l 0 l8 l l l EO 7 8 9 SYSTEM CAUSE CAUSE COYP. VALVE CODE CODE SUBCODE COMPONENT CODE SUECCOE SUSCODE g lB lB j@ ]@ lA l@ l I l N l S l T l R l U l@ lE l@ { @ 13 18 19 20 7 8 9 to 11 12 OCCURRENCE REFORT REV;SION

, SEQUE NTI AL REPORT NO, CCDE TYPE NO.

LER Ro E h ,ag _ 21 8l 3l lVE NT YEl-l 22 23 AR l0 10l 1l 24 26 l/l 27 l0 l3 l 28 29 l Ll 30 l-l 31 l0 l 02 Ak r 'A O ON PL NT / WOURS E Et: FO

  • b S. SUPPLIE MAN FA T RER lA lgl34Xl@ lZ ]@ lZ l@ l 0] 0l 0l 0l l41Y l@ l42Y ]Q l43A l@ P l1l115l@ 47 Ja 3t 36 4/ 40 44 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS I1 ic1l Failure of RM-A9 iodine channel was due to sincle channel analyzer circuit board I i; lij l failure. Shortly before failure routine source check had been nerformed satisfacteribj ii ;7i l purge was secured per TS Table 3.21-2. Circuit board replaced and cuarterly calibra- !

l3 l3l l tion performed. No further corrective action recuired. I l

t i l 41 I 80 7 8 9 E ACl gi Y

,p ,; p cT t,,,,,,, h ,V,( ,

,CvP OOCVEHV OESCAJTIM' Operator Observation l1 l s l lX l@ l 0 l 0 l0 l@l NRC "

Order "

l lBl@l l

'JT,,,Tv CO% N1

'2 A*.*OUNT OF ACTIVITY LO;1T:ON OF CELE ASE AELEASE N/A N/^ l I i I 8e9 i LZ ] @D OF RELEASELZ_J@l 7 10 11 44 I I 45 50 FERSONNEL EXPOSURES NUYEEP TYPE CESCHiPTION .*

N/A l l 1 l 7 l l 0 l 0 l 0 l@l Z l@l "

' ' * ,tRSoNNE ' L%unS

Nuvet A DESCn!PTION li ig 10 l010 l@l N/A e

I ky,o' og,^l';*^Ng*,o '^ciuTv g fojag00gp0g0 e9 PDR l l 1 l 9 l l Z l@lto S3 7 8 9 PUBLICITv rgt USE ONLy ISSUED DESCD FTION t l2 l0] lN l N/A i lIllIllI!ll! I1 7 8 9 10 FS 69 E0 i NAME OF PREPARER

. ephe E n pagg5 (717I 948--8554 i

LER S3-01

1. Current Activites at the Time of the Occurrence TET Unit 1 was in a long ter cold shutdown ccadition.

II. _Circu= stances Leading to the Occurrence At 0150 on 1/1/83 RM-A9 Iodine channel, which =enitors the Reactor Building purge effluent, failed. A Reactor Evilding purge was in progress at the time.

Shortly bef ore the f ailure a routine source check of the Iodine channel' had been satisfactorily perfor=ed.

III. Descriotion Per action statement 31 of Tech. Spec. Table 3.21-2 the purge which was in regress =ay centinue for up to 28 days, provided that, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> af ter the channel has been declared inoperable, sanples are continuously collected with auxiliary sa=pling equip =ent. The Reactor Building purge was ter=inated at 0155 hours0.00179 days <br />0.0431 hours <br />2.562831e-4 weeks <br />5.89775e-5 months <br /> on 1/1/83, within the required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

While RM-A9 Iodine channel was out ef- service the =ini=u= nu=ber of oper.able

. cha=nels was less than that required by Tech. Spec. 3.21-2. This ite: is -

considered reportacle under Technical Specificatien 6.9.2.3.(2) as cperation in a degraded mode per=itted by a li=iting ccndition f or operation.

IV. Resultar.t Event No significant occurrence took place as a result cf this event. The particulate and gas channels cf RM-A9 were cperable during the purge. No iodine above background was present since the plant has been in cold shut-down since 1979.

V. Previous Events of a Si=ilar' Nature .

LER 82-07.

VI. Root Cause Failure of RM-A9 iodine single channel analyzer circuit board.

VII. I==e diate Corrective Actien'

!=nediate ccrrective action was to secure the purge within the required time fra=e. An investigation revealed that the single chuanel analyzer circuit board of RM-A9 iodine channel had f ailed. The circuit board was l- -

LIR 83-01 (Continued) replaced and S? 1302-3.1, PES Quarterly Calibratien, was perfor=ed to essure the channel was functioning properly following repair.

VIII. Lone Term Corrective Action No additional ecErective action is required for this isolated case of conpenent f ailure. .

IX. Cocponent Failure Data Victoreen single channel analyzer circuit board, part number 842-3-6.

-*G