Provides Info Re Expected Fuel Load Date,Per DG Eisenhut .Fuel Load Expected in Aug 1983,w/o Further Extension to CP
ML20028G152
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 02/01/1983
From: Schroeder C
COMMONWEALTH EDISON CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
5908N, 5911N, NUDOCS 8302070460
Download: ML20028G152 (2)


Text

. _ -. _ _ _ - _ _ _ _ _ _ _ _

w s Commonwealth Edison

/

) one First hahonal Plaza, Chicago.Janois

\\

7 Address Reply to: Pc;t Othea Box 767

(

/ Chicago, Ilhnois 60690 February 1, 1983 Director of Nuclear Reactor Regulation Attention:

Mr. A. Schwencer, Chief Licensing Branch #2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Unit 2 Revised Fuel Load Date NRC Docket No.'50-374-Reference (a):

C. W. Schroeder letter to Director of Nuclear Reactor Regulation dated January 13, 1983.

(b):

D. G. Eisenhut letter to L. O.

DelGeorge dated May 3, 1982, j

" Extension of Construction Completion Date - LaSalle County Station, Unit 2."

Dear Sir:

The purpose of this letter is to provide you with information on the expected fuel load date for LaSalle County Station Unit 2.

Reference (a) stated that the applicant has determined that fuel load for LaSalle County Station Unit 2 was no longer expected to occur in April, 1983, and that the status was being re-evaluated. This re-evalua-tion has been completed.

Commonwealth Edison Company expects LaSalle County Station Unit 2 fuel load to occur in August, 1983.

Reference (b) granted an extension of Construction Permit CPPR-100 for the latest completion date for LaSalle County Station Unit 2 to September 30, 1983.

l The applicant therefore expects that fuel load will be achieved without 1

need for further extension of the Construction Permit.

Enclosed for your use are one (1) signed original and thirty-nine (39) copies of this letter.

Very truly yours, CU/JL A.2-fi/g3 C. W. Schroeder Nuclear Licensing Administrator 1m cc:

Mr. J. G. Keppler - Region III I

NRC Resident Inspector - LSCS B302070460 830201 gDRADOCK 05000374 PDR nu.

N

.. (

ATTACHMENT LASALLE COUNTY STATION Code Case NRC Approval Documentation l

1332-4 LSCS FSAR Table 5.2-1 1332-5 LSCS FSAR Table 5.2-1 1401 LSCS FSAR Table 5.2-1 1420 LSCS FSAR Table 5.2-1 1441 LSCS FSAR Table 5.2-1 N32-4 Regulatory Guide 1.84 N71-9 Regulatory Guide 1.85 N192 Regulatory Guide 1.84 N234 0.0. Parr letter to D.L. Peoples dated November 1, 1979.

N235 0.0.

Parr letter to D.L. Peoples dated November 1, 1979.

N240 LSCS FSAR Table 5.2-1 N241 0.D. Parr letter to 0.L. Peoples dated March 17, 1980.

N272 Regulatory Guide 1.84 N282 Regulatory Guide 1.84 N308 Telecon confirmed by C.W. Schroeder letter to A.

Schwencer dated July 6, 1982.

5908N