s APPENDIX A NOTICE OF VIOLATION Arkansas Power and Light Company Dockets:
50-313/82-33 50-368/82-33 Arkansas Nuclear One, Units 1 and 2 Licenses:
DPR-51 NPF-6 Based on the results of an NRC inspection conducted during the period of November 15-19, 1982, and in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C), 47 FR 9987, dated March 9, 1982, the following violations were identified:
1.
Failure of the Plant Review Committee to Investigate a Licensee Identified Technical Specification Violation - Units 1 and 2 Technical Specification 6.5.1,6.e requires the Plant Safety Committee (PSC) to investigate all Technical Specification violations and provide a written report of such investigation.
Contrary to the above, it was found on November 17, 1982, that the PSC had not reviewed a Technical Specification violation identified in licensee nonconformance report (NCR) 81-007-0.
The NCR reported failure to comply with ANSI N18.1-1971 when a new maintenance manager was appointed.
Compliance with ANSI N18.1, 1971, is invoked in Technical Specification 6.3.1.
This is a Severity Level V Violation.
(Supplement I.D.) (313/8233-01; 368/8233-01) 2.
Failure to Maintain Penetration Fire Barriers Functional - Unit 2 Unit 2 Technical Specifications, paragraph. 7.11, requires that, "All penetration fire barriers protecting safety related areas shall be functional... at all times."
Contrary to the above, a cable conduit penetration through a 3-hour rated fire wall above fire door 268 in fire zone 21090 was found unsealed.
This is a Severity Level IV Violation.
(Supplement I.D.) (368/8233-02)
Pursuant to the provisions of 10 CFR Part 2.201, Arkansas Power and Light Company is hereby required to submit to this office, within 30 days of the date of this Notice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
Dated:
January 18. 1983 8302070382 830118 PDR 4 DOCK 05000313 G