Forwards QA Program Insp Rept 99900235/82-01 on 821115-18. No Noncompliance Noted
ML20028F977
Person / Time
Issue date: 01/18/1983
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Frisco L
RAYCHEM CORP.
Shared Package
ML20028F978 List:
References
REF-QA-99900235 NUDOCS 8302070263
Download: ML20028F977 (2)


Text

,'

JAN 1 s 1983 Docket No. 99900235/82-01 Raychem Corporation Energy Division ATTN:

Mr. L. J. Frisco Director of Corporate Product Review 300 Constitution Drive Menlo Park, CA 94025 Gentlemen:

This refers to the inspection conducted by Mr. H. W. Roberds of this office on November 15-18, 1982, of your facility at Menlo Park, California, associated with the manufacture of electrical cable and to the discussions with you and members of your staff at the conclusion of the inspection.

This inspection was made to ascertain whether appropriate records had been maintained by Raychem Corporation which would allow verification of information provided to the NRC Office of Inspection and Enforcement with respect to nuclear plant sites that have received electrical cable containing potentially defective insulation.

Areas examined during the inspection and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, we found no instance where you failed to meet NRC requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by te!cphone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than 7 days are available for your review., please notify this office promptly so that a new due date may be established.

Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit (1

RIV JT @11 ins CI:R& CPS SC:R& CPS BC:R& 5 D:D; A

V i

HWRoberds/jkh IBarnes UPotapovs RLB.

rt g

1/p/83 1/ /83 1/ /83

[

1/ fp37 1

y C302070263 830118 PDR GA999 EMVRACH 99900235 PDR

l l

Raychem Corporation '

Energy Division l

executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, "Oric:==t cynod byg

u. PorApo/s-Uldis Dotapovs, Chief Vendor Program Branch

Enclosures:

1.

Appendix A - Inspection Report No. 99900235/82-01 2.

Appendix B - Inspection Data Sheets (2 pages) r bec:

IE Files AE0D NRC:POR QAB Reg. Administrators I, II, III, IV, V EHJohnson, RIV RLBangart, RIV JEGagliardo, RIV IVillalva, IE j