ML20028F608
| ML20028F608 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 12/14/1982 |
| From: | Mattimoe J SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20028F609 | List: |
| References | |
| TAC-49576, NUDOCS 8302020304 | |
| Download: ML20028F608 (2) | |
Text
SMUD
"""*"Te Muneceret uwtv costsucr o est s them, esa tans, soonmannen emusonin snar C3 asau-December 14, 1982 Qq) h e' d k n M F C
~
DIRECTOR OF NUCLEAR REACTOR REGULATION
. ATTN: DARRELL 4 EISGefUT, DIRECTOR DIVI 51tM OF LICOtSING U S NUCLEAR REGULATGRY C(N(ISSION MASHINGTON DC 20555 Dzs:cz,
U"tified sy_
~ %,
u
~
DOCKET NO. 56-3V4 c-
^ '----
RANCHO SECO NUCLEAR GENERATING STATION UNIT ha.1 PROPOSED ANEMDENT MO. 98 In accordance with 10 CFR 50.59, the Sacramento fbnicipal Utility District hereby proposes to amend its Operating License DPR-54 for Rancho Seca Nu-clear Generating Station, Unit No.1, by submitting forty (40) copies of Proposed Amendment Ms. 88.
The purpose of these revisions is to assure operation of the Rancho Seco Nuclear Generating Station, Unit No.1, Cycle 6 core within applicable fuel design and perforsmace criteria. The proposed es are shows in Attachment 1 as replacement pages for the Rancho seco Nuclear rating Station Techni-cal Specifications:
l 2.1 SAFETY LIMITS, REACTOR CORE, Figure 2.1-2 2.3 LIMITING SAFETY SYSTEM SETTINGS PROTECTIVE INSTRtMENTATION, Figure Z.3-Z 3,5.2 CONTROL R00 GROUP AMQ PSfER DISTRIBUTIOK LIMITS 1here are no withdrawal ifaits for the gray APSRs 3.5.2 in Rancho Seco 1 Cycle 6.
Therefore, the ApSR withdrawal 1tates arw being(deleted from theFigures 3.5.2-7 r
Technical Specifications.
3.5.2-8 will be removed from the Tech. Specs.)
THE QUADRANT PINER TILT, Figures 3.5.2-1 through 12 3.5.2.4 3.5.2.5 CONTROL ROD POSITIONS -
5.3 REACTOR -
BM-1758. " Rancho Seca Unit No.
Also attached is Sa6 cock & Wficox ReportThe Reload Report includes a summary of
- 1. Cycle 6 Reland Report".
operating parameters and contains the safety analyses supporting the operating of Rancho Seou Unit Ma,.1 Cycle 6 core at rated power in accordance with the Technical Specifications provided.
!DR DO O
O 2
P PDR j
b U
i M
be 5
/
1A 3:
r q/, w s
g i
I L h
=
9
y.
~ ~= December 14, 1982
. Dagrell G. Eisenhuc a
The District considers this Amendment request to be defined underThe requ
.10 CFR 170.22 Class 111.
review and approval is attached to this letter, If you have any questions concerning this matter, please contact Mr.
R.' W.
Colombo at the 4tanche Seco Nuclear $1 ant..
W
' John
. Matthese General Manager JJM:RWC:jc
{"""*f.PW-,", "" *3" "f*g"*R Subscribed and sworn to before me