ML20028F210

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-267/82-19.Corrective Actions:Cn 653 Completed on 811008 & Functionally Tested Via SR 5.4.9-A2 on 801028. Proper Procedures Implemented for Processing of CNs & CWPs
ML20028F210
Person / Time
Site: Fort Saint Vrain 
Issue date: 11/03/1982
From: Lee O
PUBLIC SERVICE CO. OF COLORADO
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20028F211 List:
References
P-82499, NUDOCS 8301310267
Download: ML20028F210 (3)


Text

.

o e

v

\\~

PUBLIC SERVICE COMPANY OF COLORADO p _ tf g P.

O.

BOX 840 DENVER, COLORADO 80201 OSCAR R. LEE November 3, 1982 v,ce usiom Fort St. Vrain Unit No. 1 P-82499 G

%~G. t r5 yS l TFT]L

} -

1;u.. :

y 2.===

q Mr. John T. Collins, Regional Administrator f Jo B

j

. hl }$ l 2_lN.

! Il U. S. Nuclear Regulatory Commission 1

611 Ryan Plaza Dr., Suite 1000 b

Arlington, TX 76012 I ul _

SUBJECT:

I & E Inspection Report 82-19

REFERENCE:

NRC Letter dated October 6, 1982

Dear Mr. Collins:

This letter is in response to the Notice of Violation received as a result of inspections conducted at Fort St. Vrain during the period August 9-13, and August 30-September 3, 1982. The following response to the items contained in the Notice of Violation is hereby submitted:

Functional Test Documentation of Safety-Related Change Technical Specification 7.4.a.3 requires that

" Written procedures shall be established, implemented and maintained covering... test activities of safety related equipment."

Licensee Procedure Q-11, Issue 3 (December 29, 1981), " Test Control," requires, in Section 3.0e, that " Testing practices employed on safety-related items are required to assure that... test results are documented and evaluated to assure test requirements have been satisfied."

Licensee Procedure Q-17, Issue 4 (January 13, 1982), " Quality Records," requires in Sections 4.2.3b and c,

that " Records providing objective evidence of conformance are required to

include, as appropriate.

. results of the inspection or test... dated signatures (s) of the person (s) verifying conformance or j

acceptability of evaluated test results."

Contrary to the above, there was no documentation of functional testing of the safety-related design change performed in CN 653.

h tP 8301310267 821103 PDR ADOCK 05000267 O

PDR

i' o

/

i,

.i (1) The corrective steps which.have been taken and the results achieved:

The licen' sees processing ofECN's and CWP's was changed in August 1980 to give uniform treatment to FT documentaticn.

CN 653 did not receive the benefit of this aforementioned processing; (2) Corrective steps which will be taken to avoid further i

violations; Proper implementation of existing procedures for processing of i

CN's and CWP's.

l (3) The date when' full compliance will be achieved:

.j CN 653 was completed October 8, 1981 and functionally tested via SR 5.4.9-A2 (copy attached),

on October 28, 1980.

Compliance was achieved as a result of the SR on October;28, 1980.

r Should you have any further questions, please contact Mr. Edwin D. Hill, (303) 571-7436, ext. 201.

l Very truly yours, 5

Oscar R. Lee ORL/skr Attachments c

.)

T r

r 9

,-e.,,

,-e

-.u

.,,,--n...

,---,-,,..r.

, ~

-s

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter

)

)

Public Service Company of Colorado

)

Docket No.

50-267 Fort St. Vrain Unit No. 1

)

AFFIDAVIT

. being duly sworn, hereby deposes and says that he is Vice President of Electrical Production of Public Service Company of Colorado; that he is duly authorized to sign the file with the Nuclear Regulatory Commission the attached response to the Notice of Violation identified in NRC Inspection Report 82-19; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

94

0. R. Lee Vice President of Electrical Production C 0.0400

)

STATE OF 0

COUNTY OF b IN7L

)

Subscribed and s orn to before me, a Notary Public in and for h Nile 1. U.

on this 97 day of NoveudsL,1982.

e l

r 1

' Notary Public

/

My commission expires _hcTV6t4 7

, 19 13

.