Interim Deficiency Rept Re Potential Problem of Supporting Equipment from Block Walls.Initially Reported on 821213. Vendor Plans to Conduct Analysis of All Equipment Currently Attached to Wall.Next Rept Will Be Provided by 830512
ML20028E963
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/12/1983
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-61532, NUDOCS 8301280302
Download: ML20028E963 (2)


Text

.-

e Donald A. Wells y ; 9.r 0 w y As .-vw c a f .1.) 23/ 'M7 Edison Ens!**

January 12, 1983 EF2-61532 Mr. James G. Keppler, RerJional Administrator Region III U.S. Nuclear Regulatory Ccmnissicn 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Report of Potential 10CFR50.55(e) Item on Equipment Supported frm Block Walls (#84)

Dear Mr. Keppler:

On December 13, 1982, Detroit Edison's Mr. D. Ferencz, Acting Supervisor-Construction Quality Assurance, telephoned Mr. H. Wescott's office of NRC Region III to report on a potential prcblem of supporting equipment frun block walls at the Fermi 2 site.

It was recently discovered that portions of the security system (control panels, card readers, pull boxes, and 4" rigid conduit) have been installed on block walls. Also, the fire detection devices have been mounted to those same walls.

The above installations conflict with Edison's response to NRC Bulletin 80-11 (Edison letter EF2-52,623 frcIn Mr. H. Tauber) . This response stated, in part, that piping and equipuent is not supported on block walls. hhere items were on the walls, they either weighed less than 2% of the wall weight, or had been included in the design.

Troy Engineering plans to conduct an analysis of all equipment currently attached to the walls to detemine the loading.

Another report on this item, either interim or final, is scheduled to be sent on or before May 12, 1983. If you have questions concerning this matter, please contact Mr. G.M. Trahey, Assistant Director-Project Quality Assurance.

Very truly yours,

)~)l DAW /DF/cp

(

Ss 27 8301280302 830112 PDR ADOCK 05000341 S 11 t S PDR I

o 6'

Mr. James G. Keppler, Regional Administrator January 12, 1983 Page Two EF2-61532 cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Ocmnission Washington, D.C. 20555 Mr. Bruce Little, Senior Resident Inspector U.S. Nuc1 car Regulatory Cmanission 6450 North Dixie Highway Newport, Michigan 48166 1