ML20028E761

From kanterella
Jump to navigation Jump to search
Forwards Annual Update for Interim Solid Waste Staging Facility, Technical Evaluation Rept,Rev 4,per
ML20028E761
Person / Time
Site: Crane 
Issue date: 01/24/1983
From: Kanga B
GENERAL PUBLIC UTILITIES CORP.
To: Snyder B
Office of Nuclear Reactor Regulation
Shared Package
ML20028E762 List:
References
4410-83-L-0020, 4410-83-L-20, NUDOCS 8301280180
Download: ML20028E761 (1)


Text

.

GPU Nuclear Corporation i P3 duclear

=?=s$te;e

Middletown, Pennsylvania 17057 717 944-7621 TELEX 84-2386 Writer"s Direct Dial Number:

January 24, 1983 4410-83-L-0020 M Program Office Attn: Dr. B. J. Snyder, Director US Nuclear Regulatory Comission Washington, DC 20555

Dear Sir:

'Ihree Mile Island Nuclear Station, Unit 2 ('IMI-2)

Operating License No. DPR-73 Docket No. 50-320 Recovery Systs Description and Technical Evaluation Report Update In accordance with your letter of February 4,1982, attached is the annual update for the Interim Solid Waste Staging Facility (ISWSF) Technical Evaluation Report. In addition, a review of the Standby Pressure Control Systs, the Mini-Decay Heat Rsoval System, and the Fuel Pool Waste Storage Syste System Descriptions indicate that no changes are necessary.

'Ihe need for and extent of revisions to the following Systs Descriptions and Technical Evaluation Reports is presently undergoing internal review and updates will be provided to the NRC as they become available:

Auxiliary Building Emergency Liquid Cleanup Syst e (EPICOR II)

System Description

l Solid Radwaste Staging Modules Systs Description l

Suhnerged Deineralizer Systs (SDS) System Description Submerged Deineralizer System Technical Evaluation Report If you have any questions, please contact Mr. J. E. larson of my staff.

Sincer y, /

j c!

I. J(. Kanga h

I irector, M -2 BKK/JJB/jep Attachnent CC: Mr. L. H. Barrett, Deputy Program Director - M Program Office r301280180 830124 DRADOCK05000h ration is a subsidiary of the General Public Utilities Corporation r-

- -