DISTRIBUTION:
- Document 1 Control 440/441' Ny W PDR " ' ~ ~'"~~~~~~" " '-
PRC System JAN 2 01983 LBO Rdg MRushbrook vak Docket flos.:
50-440 JStefano and 50-441
??EMORANDUM FOR: Multiple Addressees (See attached list)
FROM:
B. J. Younablood, Chief Licensing Branch Ho. 1 Division of Licensinq
SUBJECT:
PERRY HEARING SCHEDULE CHANGE /SSER #3 EVALUATION INPUT REQUEST This is to advise you of the currently targetted start date for the Perry Board hearing, and to schedule your evaluation innuts (as applicable) for the next SER supnlenent (SSER #3).
With respect to the Perry hearing, the Board has reached agreement with the staff, anplicant and intervenor attorney's to reschedule the start of the Perry hearing on Hav 23,1983 (the current Bevill schedule reflects a February 15, 1983 hearing start date). The hearing will take place at the Painesville Admin-istration Center located in Painesville, Ohio. At this tire, seven (7) of the fifteen (15) admitted contention issues have been deleted by the Board or dis-posed of by the process of sumnary disposition and accepted as no longer at issue by the Board. The current list of contention issues is contained in.
For your information, SER Supplement #2 was released to printing on January 12, 1983, Printed copies should be available within the next few weeks. We are scheduling issue of the next suppleaent, SSER #3, at least 30 days prior to the start of the Board hearings, i.e., on or about April 15, 1983. In order for us to meet this target date, your evaluation inputs will be required not later than Friday, March 11, 1983. In providing your inputs, emphasis should be placed on providing the staff's disposition of those contention issues (listed in Attachment
- 1) which remain the subject for hearing. Examples are turbine missile protection, in-core thermocouples, steam erosion, hydrogen control, etc. issues. Emphasis should also be placed addressing the LRG-II issues cited in the SER applicable to Perry, and that inputs recorded therein are correctly related and identified (reference Table 1.1 in Section 1 of the SER). Attachment 2 contains the appli-cant's comitments for addressing the remaining unresolved Perry SER issues, sone of which are contention issues (turbine missiles, in-core themocouples).
Should inforcation be required from the applicant for the staff to address any and all contention /SSER unresolved issues, please let the project manager know imediately.
8301260052 830120 PDR ADOCK 05000440 A
PDR omer>
sua m e) emy nac ronu sis oo-em nacu ana OFFICIAL RECORD COPY uso m e - m.,ea
l F
!!ultiple Addressees Your continued assistance to ensure the timely receipt of the staff's evaluation inputs by the date noted above will be nost appreciated and is urged. If there are cny questions concerning this nemo, please direct then to John J. Stefano, the Perry project nanager.
B. J. Youngblood, Chief Licensing Branch No.1 Division of Licensina Attachments:
As Stated cc w/ attachments:
H. Denton R. LaGrange D. Eisenhut/R. Purple G. Baqchi i
T. Novak W. Haass R. Vollmer M..Ilodges l
R. Mattson C. Rossi
- 11. Thompson /J. Kramer J. Kudrick E. Jordan, DEQA: IE V. Panciera i
J. P. Knight J. E. Knight W. Johnston A. Ungarc W. Butler P.. Meyer L. Rubenstein L. Phillips 1
R. Houston T. Quay L. L. Boweenan I. Spickler i
H. Bramer C. Villis F. Cherny W. Pasciak O. Jenq D. Collins C. Y. Cheng D. Tondi R. Klecker H. Clayton
- 4. Harelton R. VanNiel
{
R. Ferguson i
A JIO b
i orrect >
..L.1@ '...........Q.4.i' )ly SURNAME)
OQ
- M... h.d.YQ.y QQd.
1../.1.7./. 83..1
..4. 1...
om>
nac renu ais om sacu ono OFFICIAL RECORD COPY usceo:im-sma
...m,
7 f
Multiple Addressees for Perry Hearing Schedule Change /SSER #3 Evaluation Input Request R. J. Bosnak, Chief, l'echanical Engineering Branch, DE F. P. Schauer, Chief, Structural Engineering Branch, DE B. D. Liaw, Chief, Materials Enoineering Branch, DE V. Nasan, Chief, Equipment Qualification Branch, DE V. Benaroya, Chief, Chemical Engineering Branch, DE B. Sheron, Chief, P.eactor Systems Branch, DSI F. Rosa, Chief, Instrumentation and Contiol Systems Branch, DSI D. Parr, Chief, Auxiliary Systems Branch, DSI H. Srinivasan, Chief, Power Systems Branch, DSI C. Berlinger, Chief, Core Performance Branch, DSI F. Congel, Chief, Radiological Assessnent Branch, DSI W. Ganmill, Chief, Heteorological and Effluent Treatment Branch, DSI L. G. Hulman, Chief Accident Evaluation Branch, DSI V. A. Moore, Chief, Human Factors Engineering Branch, DHFS
- 0. L. Zienann, Chief, Procedures & Test Review Branch, DHFS T. L. Harpster, Chief, Quality and Assurance Branch, DEQA:IE F. G. Pagano, Chief, Emergency Preparedness Licensing Branch, DEP:IE
~
i omer >
suaswe >
om) mc rosu an omso> uscu o24o OFFIClAL RECORD COPY usa m asi.-sw.co l
ATTACHMENT.1 O
SUMMARY
- PERRY-CONTENTION ISSUES INCLUDED IN ISSUE SER/SSER-FES" COMMENT (1)
Emergency evacuation plans Yes Need to address staff resolution in SSER.
(2)
Financial qualifications N/A SECY-82-21 deleted need for staff to address - Board agrees.
0(3)
QA construction program No Add'l info requested by Board Order 12/22/82.
Need to acdress-
, revised construction program in.
SSER.
.o (4)
Full-scale 30 degree sector Yes Deleted by luard Order 12/3.0/85.
steam test-(5)
Fipe break in SDV Yes Deleted by Board Order 12/22/82.
(6) ATWS-auto standby liquid Yes Need to address staff resolution'.
control systems in SSER.
(7) Asiatic Clams Yes Deleted.by Board Order 12/22/82.
(SER & FES)
(8) Hydrogen rupture of Yes Need to address staff resolution containment in SSER - respond to ORCE & Board interrogatories by 2/1/83.
(9)
Polymer degradation elect.
No Need to address staff resolution i
equip.
in SSER.
Summary disposition filed to Board on 1/14/83.
(10)
Psychological str'ess N/A Deleted by Board Order 7/19/82.
OCRE appealing.
(
(11) Cost-benefit analysis Yes(FES)
Deleted by Board Order 12/30/82.
(12)
Severe accidents per N/A Deleted by Board Order 12/3d/82.
NUREG/CR-2591 Needtoaddress(updatetorefl[ct) o(13)
Turbine missiles Yes staff resolution in SSER.
- ACR'., requested technical report.
l l
\\
l
i N
^
~
E.
,~
INCLUDED IN W
ISSUE.
SER/SSER-FES-COMMENT s
l (Id)
In-cote thermocouples Yes Need to address staff resolution i-
- of this license conditioh in SSER (15) Steam erosion No
- Need to address issue in SSER.
1 1
5 5
L 4
5 I
s O -
/
e.
F a
I' a;
?
}
9 m
4 g
4 y
e
~
,e m
+
1
ATTACHMENT 2 UNRESOLVED PERRY SER ISSUES Type 1/
. Applicant Issue (SER Section)
Isstfe
- Commitment Date (1) Turbine missile protection (3.5.1.3),
0, Need SSER input to define info to Shiffgens - MTEB be' required by applicant.
(5)
Inservice testing of pumps and valves 0
1/30/83 (3.9.6), Terao - MEB (7)
Control room design (18), Serig -
0 Applicant has not yet sched. final HFEB DCRCR or HED disposition.
(8)
Containment (Humphrey Issues [6.2]) -
0
~
1/17/83 CSB (9) Pool dynamic loads (6.2.1.8) - CSB 0
1/17/83 (10)
Containment purge (6.2.4) - CSB 0
Staff evaluation of CEI'12/2/82 lte input awaited.
(12) Manual. initiation / termination of ESF 0
1/31/83 Systems (7.3.2.7) - ICSB
(.13 )
IE Bulletin 79-27 (7.5.2.4) - ICSB 0
1/31/83 ~
(14)
Control system failures (7.7.2.1) -
0 1 /31 /83 1
ICSB (19)
Emergency plans (13.3) - EPLB 0
Rev. 1 to Emergency Preparedness Plan by 2/15/83; EOF & Rad. Assess.
3/15/83.
(20) Standby Liquid Co,ntrol System (9.3.4) -
0 1/17/83 ASB (21 )
Re-Analysis of transients & accidents -
0 Awaiting staff questions re CEI develop eme'rgency op. procedures per ltr of 11/16/82.
I.C.1(1) (13.5.2.2) - PTRB (1)
Final piping stress analysis (3.6.2) -
C 6/15/83 MEB
?
l (7)
Performance testing of R/SV's per 1MI C
Awaiting staff response.
II.D.1 (3.9.3.2.1) - EQB k-Outstanding Issue (Sect.1.9 of SER); C-Confirmatory Issue (Sect. l.10 of SER);
LC-License condition to be resolved OL issue (Sect.1.11 of SER).
e
c.
Type 1/
Issue (SER Section)
Issue.
Applicant Gommitment Date (8)
IE Bulletin 79-02 (3.9.3.3) - MEB C
Awaiting staff input.
(10) Hyaro load ef fect on CRD/HCU (3.9.4) -
C 1/17/83 MEB (11)
Fuel mechanical fracturing (4.2.3.2) -
C Awaiting staff input.
CPB (12)
Fuel assembly damage from external
-C Awaiting staff input, sources (4.2.3.1) - CPB (13)
Fuel rod bowing (4.2.3) - CPB C
Awaiting staff input, (14)
Overheating gadolinia fuel pellets C
Info request to CEI on 1/6/83.
(15)
Preservice inspect. prograni (5.2.5.2) -
C PSI plan - 4/15/83. ~ PSI inspect.
MTEB results - 9/15/83.
(18)
HPCS & RCIC initiation per TMI C
Staff audit to resolve 8/83.
II.K.3.13 (5.4.1) - RSB (19)
Isolation of HPCS/RCIC per TMI C
Staff audit to_ resolve 8/83.
II. K. 3.'15 (5.4.1 ) - RSB (20) Subcompartment pressure analysis C
Staff response to CEI ltr 12/2/82 a
(6.2.1.6) - CSB awaited.
(21)
Suppression pool temp. limits (6.2.1.8)
C 1/17/83
- CSB (25)
ADS actuation logic to TMI II.K.3.18 C
Staff response to BWROG alt's.10/82; I
(6.3.1.3) - RSB CEI requested to ident. mod to be t
incorporated in 12/82.
l (35)
Physical separation of redundant safety C
Staff. audit needs to be scheduled.
l related elect. system (8.4.4) ~- PSB i
(36) 3-Hour fire resistance of gypsum wall C
Staff input awaited.
boards (9.5.1.4.1) - CHEB i
U7)
Light & comm. fire protect. features C
Staff input awaited.
(9. 5.1.4.7) - CffEB I
1/0-0utstanding Issue (Sect.1.9'of.SER); C-Confirmatory Issue (Sect.1.10 of SER);
l LC-icense condition to be resolved OL issue (Sect.1.11 of SER).
i,-
TypeV Applicant Issue.(SER Section)
Issue Commitment Date (38)
Fire protect. standpipe & hose C
Staff input awaited, locations (9.5.1.5.3) - CHEB' (39)
Portable fire extinguisher locations C
Staff input awaited.
(9.5.1.5.5) - CHEB
~
(40) Watertight curbs in switchgear/DG Rooms C
Staff input akaited.
(9.5.1.6.4, 9.5.1.6.6) - CHEB (41) Design for noble gas effluent monitor C
Staff response to CEI ltr 12/21/82 per TMI II.F.1.1 (11.5) - ETSB awaited.
(42) Design for sampling & analysis of plant C
. Staff response to CEI ltr 1.2/21/82 effluents per TMI II.F.1.2 (11.5) -
awaited.
ETSB (51) NSSS Vendor review at low power, ascen-C Staff audit needs to be scheduled.
sion and emerg. op. procedures per TMI I.C.7 (13.4.2.2) - PTRB (52)
Pilot monitoring of selected emergency C
Awaiting staff questions to CEI op. precedures per TMI I.C.8 (13.5.2.2) ltr 11/16/82.-
- PTRB (53) Reactor internals vibration proto, test C
Staff review of GE rpt. required to *'
(3.9.2.3) - MEB close.
(3) Op beyond Cycle 1 is not permitted LC 11/1/83 until stability analyses are provided (4.4.4) - CPB (4.)
Final rpt analyzing inadequate core LC 1/14/83 cooling instrumentation req'ts per TMI II. F.2 (5) Hydrogen control for degraded core LC 1/31/83 l
accidents p.er TMI II.B.8 (6.2.7) -
CSB (6)
IE Bulletin 80-06 (7.3.2.5) - ICSB LC Staff audit req'd.
(7) Postaccident sampling per TMI II.B.3 LC 3/1/83 (9.3.2) - CHEB-l l
1/ -Outstanding Issue (Sect.1.9 of' SER); C-Confirmatory Issue (Sect.1.10 of SER);
0 LC-License condition to be resolved OL issue (Sect.1.11 of SER).
e
Typel/
Applicant.
Issue (SER Section)
Issue Commitment Date (11)
Test and maint. proced. associated LC Staff audit req'd.
with ESF systems per TMI II.K.l.5 (13.5.2.3) - LQB
~
(12)
Proced. for removing safety-related LC -
Staff audit req'd.
systems from service per TMI II.K.l.10 (13.5.2.4) - LQB
~
'(14 )
Initial test program per TMI I.G.1 LC 6/15/83 (14) - PTRB (16)
Leakage surveillance preventative LC 6/15/83 maint. program to TMI III.D.l.1 (11.5) - ETSB
- e J
.)
'l/0ut' standing Issue (Sect.1.9 of SER); C-Confirmatory Issue'(Sect.1.10 of SER);