Suppls 820930 Response to NRC Re Violations Noted in IE Insp Rept 50-358/81-27.Corrective Actions: Nonconformance Repts Dispositioned & Approved & Necessary Weld Cards to Prepare Surface for Dye Penetrant Exam Issued
ML20028E392
Person / Time
Site: Zimmer
Issue date: 11/15/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20028E389 List:
References
QA-2115, NUDOCS 8301210288
Download: ML20028E392 (2)


Text

.

..+..,,

THE CINCINNATI GAS & ELECTRIC COMPANY as ~

CINCINNATl. OHIO 45201 November 15, 1982 QA-2115 EL A. BORGMAN N

$E NIOR WCE PRESsDE.NT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. H. ZIMMER 'IUCLEAR POWER STATION UNIT I I. E. INSPECTION REPORT 81-27, ITEM #2 -

PIPE LUG ATTACHMENTS, DOCKET NO. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O.

  1. 57300 JOB E-5590 FII.E NO. NRC-1 Gentlemen:

This letter constitutes a follow-up to our previous response, QA-2022, dated September 30, 1982, regarding the subject item.

As stated in QA-2022, a dye penetrant examination identified twenty (20) pipe lugs as having indications requiring further evaluation.

Twenty two (22) lugs were selected because relief cuts were made in these lugs on piping elbows similar to the lug for hanger LP-K-114, originally identified by the Commission.

To resolve this condition, CG&E has dispositioned and approved the related Nonconformance Reports (NR's) and issued the necessary weld cards to properly prepare the surface for dye penetrant examination.

l However, because of the current "Show Cause and Order Immediately l

Suspending Construction," imposed by the NRC for all safety-related work, such action is not possible at this time.

CG&E plans to complete this item shortly after the Commission's concurrence with our plan to perform required surface grinding for NDE, at which time a report will be submitted.

l 8301210288 830112 PDR ADOCK 05000358 G

ppg DEC 1 1982

s'.

Mr. J. G. Keppler-Region III November 15, 1982 - QA-2115 Page 2 We trust the above will be found acceptable as a follow-up report concerning the subject concern.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By E. A. BORGMANN SENIOR VICE PRESIDENT FKP:as cc:

NRC Office of Inspection & Enforcement Washington, D.C.

20555 NRC Senior Resident Inspector Attn:

W. F. Christianson Zimmer Project Inspector Region III 1

J

.