ML20028E317

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Suspension of Fire Protection Sys Piping from Essential Hangers W/O Adequate Design Review.Sargent & Lundy Response to Corrective Action Request 82-80 Expected by 830120.Final Rept Submitted by 830215
ML20028E317
Person / Time
Site: Zimmer
Issue date: 01/14/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2216, NUDOCS 8301210216
Download: ML20028E317 (1)


Text

( .- .

N . Yl-_

THE CINCINNATI GAS & ELECTRIC COMPANY WM. H. ZIMMER NUCLEAR POWER STATION P.O. BOX 201 set b' .' ".OHtO4 CIN CIN N ATI January 14, 1983 MOSCOW, OH 45153 QA-2216 E. A. BORGMANN stNion vict PatsiotNY U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Attention: Mr. J. G. Keppler Regional Administrator RE: WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 10CFR50.55(e) , ITEM M-61, FIRE PROTECTION SYSTEM PIPING SUSPENDED FROM ESSENTIAL HANGERS WITHOUT I

ADEQUATE DESIGN REVIEW, DOCKET NO. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.0.#57300, JOB E-5590, FILE NO. NRC-8, M-61 Gentlemen:

This letter constitutes an interim report to document the current status concerning the subject condition, initially reported to the Commission as a potentially reportable deficiency under the requirements of 10CFR50.55(e) .

In our previous report, QA-2103, dated November 19, 1982, CG&E identified that Corrective Action Request (CAR) #82-80 had been issued to resolve this i issue. At that time, we expected to complete our verification and analysis of the CAR response by January 15, 1983. Although a response to the CAR has been re-ceived from the H. J. Kaiser Company and is under evaluation, a final response ty Sargent & Lundy, scheduled for completion by January 20, 1983, is required to complete the resolution of this issue and determine its safety implications.

These actions will be completed by February 15, 1983, at which time a final report will be submitted.

We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

I Vsry t.ruly yours, THE CINCINNATI GAS & ELECTRIC COMPANY wyec~- - -

YE. A. BORGMANN V SENIOR VICE PRESIDENT RNT:ple cc: NRC Of fice of Inspection & Enforcement Washington, D.C.

NRC Senior Resident Inspector Attn: W. F. Christianson Zimmer Project Inspector Region III B301210216 830114 JAN 171983 gDRADOCK05000 %d

_ _ - _ - _ _ _ . ___- _ . . _ __ _ . . _ _ _ _ _ - . ______. - _ _ _ _ __~