Forwards First Installment of Testimony for Hearings Beginning 830214.Second Installment to Be Filed 830124. Related Correspondence
ML20028E138
Person / Time
Site: Midland
Issue date: 01/17/1983
From: Steptoe P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), ISHAM, LINCOLN & BEALE
To: Bechhoefer C, Cowan F, Harbour J
Atomic Safety and Licensing Board Panel
Shared Package
ML20028E139 List:
References
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8301210021
Download: ML20028E138 (2)


Text

L4,

n91 ATEO

~~

ISHAM, LINCOLN & BEALE COUNSELORS AT LAW THREE FIRST NATIONAL PLAZA g f{}{p CHICAGO,ILUNOIS 60602 i e9y EDWARD S ISHAM. 1872-1902 WASHINGTON OFFICE 24288 ROB T L NCOLN.1 188 1120CONNECDCUT AVENUE,N W-

'83 JM 19 A10 93"'"Jgg'"*'

cq

.- mtiAr-January 17, 1983 is.iimd SEPvia SRANCH In the Matter of

)

)

Docket Nos. 50-329-OM CONSUMERS POWER COMPANY

)

50-330-OM

)

50-329-OL (Midland Plant, Units 1

)

50-330-OL and 2)

)

Charles Bechhoefer, Esq.

Dr. Jerry Harbour Atomic Safety & Licensing Atomic Safety & Licensing Board Panel Board Panel U.S. Nuclear Regulatory Com-U.S. Nuclear Regulatory Com -

nission mission Washington, D. C.

20555 Washington, D. C.

20555 Dr. Frederick P. Cowan 6152 N. Verde Trail Apt. B-125 Boca Raton, Florida 33433

Dear Administrative Judges:

Enclosed is the first installment of Applicant's prepared testimony for the evidentiary hearings beginning February 14.

Pursuant to agreement of the parties and my conversation with Chief Judge Bechhoeffer on Friday, a second installment will be filed on January 24 dealing with Sinclair contention 3 (water hammer) and certain remaining subissues of Stamiris contention 4.

My understanding is that the Staff has been granted an extra week, until February 7, to file testimony with respect to the correspond 1ng issues.

One of Applicant's witnesses on Sinclair contention 4 (steam generator corrosion due to pond water chemistry), Cris Hillman, may not be able to be present in Midland during the week of February 14 due to longstanding vacation planc.

Rather than asking Mr. Hillman to cancel his vacation, we have arranged for Mr. Bi11 Beckman, who as Chemistry / Health Physics Superin-tendent at Midland Plant is Mr. Hillman's boss, to stand in for 8301210021 9

PDR ADOCK 0 PDR T

P) CJO^O)

Administrative Judges January 17, 1983 Page 2 Mr. Hillman if necessary.

Mr. Beckman's resume is included with Applicant's testimony.

Also included in this package is Applicant's exhibit 29R, which is a redrafted figure showing the locations agreed upon by Applicant and the NRC Staff for Diesel Generator Building crack monitoring, together with an explanation of the frequency and acceptance criteria for such monitoring.

This material is provided with the Board's permission merely for the sake of clarity; no substantive changes in the drawing or the explanation of the monitoring program have been made.

(See Tr. 11068-72).

Re h full ubm ited,

[

t (A

\\~

Phi' lip P'. 'St$ toe)

One of the Attorneys kor Consumers Power Company cc Service List Isham, Lincoln & Beale 3 First National Plaza Chicago, Illinois 60602 (312).558-7500 l