ML20028E058
| ML20028E058 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/13/1983 |
| From: | Russell L BALTIMORE GAS & ELECTRIC CO. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| RO-83-03, RO-83-3, NUDOCS 8301200308 | |
| Download: ML20028E058 (1) | |
Text
~
DESIGHATED ORIGINAL Certified By M/
.3 m LTIMORE G A S AND ELECTRIC COMPANY ~
J PO.DOA I47s D A LTIM OH E. MARYLAND 21203
- .JCLt A R PO tsER DD'ARTMENT "mi vtR T CLt
- F1 mbCL EAR #*Q u t s PLAwT
.gl av, ka Mv L a sso tot t?
January 13. 1983 Kr. Ronald C. Raynes. Director U. S. Nuclear Regulatory Co= mission Dockee No. 50-318 Region 1 Licensa No. DPR 59 631 Park Avenue King of Prussia. PA 19406
SUBJECT:
LER 83 03 (U-2)
Dear Mr. Haynea:
This letter is to confirm our verbal notification to your Mr Archittel of the discovery that
. Ralph the auxiliary feedvater regulating valves failed to the open position thereby rendering the PSAR steam line break analysis invalid.
At 1030. on 1-12-83 while im Mode 3. an air line supplying instr==aat air to the auxiliary feedvater regulating valves I/Ps became diacon-nected.
Locs of air to these 1/Ps caused the auxiliary feedwater regulattaa valves (AFW-4511 and AFW-4512) to fail open.
in the event of a steam line break, auw111ary feedvater actuation on Therefore, low steam generator level would result in prompt auxiliary feedwater flow to the ruptured steam generator.
This would be contrary to the stema line break analysis presented in Section 14.14 of the PSAR which assumes a three (3) minute time delay before auxiliary feedwater reaches the ruptured steam generator.
Consequently. the event is reportable per Technical Specification 6.9.1.8.e.
line was repaired at 1125 terminating the event.
The instrument air A complete description of this event and any further corrective action will be addressed in a follow-up report.
Very truly yours.
L. R. Rusep T Plant Si A ! ate
- mnt LBR: bag cet J. A. Tiernan Director. Of fice of hnapent R. M. Douglaso Information & Progran Control R. E. Architzel G. S. Pavia L. B. Russell U. S. Gibson
.n
- c
=
_ = _... - -.. -
- -~~ ~ --- ~ -
- ~
- 9 SS0*S0000*o!oSo$$a s
S PDR
__-__-_ _ - - - - - - -