ML20028D968
| ML20028D968 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 01/14/1983 |
| From: | Bournia A Office of Nuclear Reactor Regulation |
| To: | Carter J, Case W, Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8301200178 | |
| Download: ML20028D968 (1) | |
Text
_
DISTRIBUTILN:
C Document Controld(50-373)3 M '4 123 L PDR NRC PDR LB#2 Reading EHylton ABournia Docket flo. 50-373 ASchwencer 11EMORAIIDUli FOR:
H. R. Denton,ilRR E. G. Case, NRR J. Carter,liRR D. G. Eisenhut, DL H. Thompson, DHFS R. Vollmer, DE R. Mattson, DSI S. Hanauer, DST J. Sniezek, I&E T. Ippolito, ORAB T. !4ovak, DL G. Lainas, DL F. Miraglia, DL THRU:
A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing FROM:
A. Sournia, Project fianager Licensing Branch No. 2, DL
SUBJECT:
DAILY HIGHLIGHT - LA SALLE UNIT 2 A letter dated 1/13/83 was telecopied by the licensee to indicate that fuel load date for La Salle, Unit 2 is no longer scheduled for 4/83. The status of Unit 2 is currently being re-evaluated at the highest levels of its corporate management and consideration is being given to issuance of a new projected fuel load date within the next several weeks. Nevertheless, the licensee indicates that the new fuel load will not extend beyond the Construction Permit extension which is 9/30/83.
Original signed by:
A. Bournia, Project Manager Licensing Branch lio. 2 Division of Licensing 030120017e 830114 PDR ADOCK 05000373 PDR p