ML20028D513

From kanterella
Jump to navigation Jump to search
Requests Issuance of Initial Decision Authorizing OL Amends to Permit Sleeving of Steam Generator Tubes.Licensee & NRC Filed Proposed Findings of Fact & Conclusions of Law on 821223 & 830110,respectively.Certificate of Svc Encl
ML20028D513
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/17/1983
From: Churchill B
SHAW, PITTMAN, POTTS & TROWBRIDGE, WISCONSIN ELECTRIC POWER CO.
To: Bloch P, Kline J, Paxton H
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OLA-1, NUDOCS 8301190212
Download: ML20028D513 (4)


Text

=

S 6

SHAW, PITTMAN, PoTTs & TROWBRIDGE ,

A PARTNERSMip or PROFESSIONAL CORPORATIONS 1800 M STR E ET, N. W.

WASHINGTON D. C. 20036 00.W%.@

(202) 822-1000 RAMSAY D POTTS. P C. THOM AS A. 5AATER P C. JOHN M. O'NEtLL J et NNETH J. M AUTM AN STEU ART L PITTMAN. P C. J AMES M. SURGER. P C. JAYA PSTigm i *I VfD LAWRENCE MILLER GEORGE F TROWsRsOGE. P C. SHELOON J. WEISEL P C. 9g ,, g ,

WA ALg(pd 5 ANNE M FRAUSMCPF ETEPHEN D POTTS. P C. JOMN A McCULLOUGM. P C. TIM S. MceRIDE FREDERsCM L MLEIN EEKALD CHANNOFF. P C. J. DATRICM MICMEY. P C (202t 822-1099 & S22-6:99 CUSABETH M. PENOLETON GORDON R. MANOFSMY SMsLLap D SOsmtCM. P C. GEORGE P MacMAELY. JR.. P C. PAUL A. MAPLAN JEFFREY S. GiANCOLA R. TIMOTMY MANLON, P C. J TMOM AS LENM ART. P C. - . , . M ANN AM E. M. LIEgERMAN MARRY M. GLASSPsEGEL 4.g 6 JEFFERY L. YASLON -

GEORGE M ROGE RS. JR . P C. STEVEN L. MELTZER. P C.

FPED A. LITTLE. P C. DE AN O. AULiCM. P C, TELEX JACM MenAy . ,h N' h h *i f B ANDRA E. FOLSOM"' M ARCIA JOMN 3 RMsNELANDER.

  • C. JOHN ENGEL P C. 89-28593 (SM AWLAW WSMI TMON AS M; McCORMsCy JUDITH A. SANDLER C4WCE W CHURCM4LL W C. CHARLES 3. TEMWIN P C. SUSAN M. FREyNO W EDWARD O. YOUNG. m LESLiE A. NtCMOLSON. JR . P C. STEPHEN 5 MUTTLER. P C. CABLE "SMAWLAW" JOMN L. CARA JR ROBERT L wtLLMORE M ARTIN O. MRALL. P C. WINTMRO8 N. BROWN. p C. DMeupJ.MARVEY ANDREW O. ELLIS

~

RICH ARD J. M ENOALL P C. JAMESS M AMLIN. P C. ROSERT M. GORDON WENDEUN A. WMITE AY E. S.BE RO. P C. RANDAL 3. MELL P C. BASSARA J. MORGEN STANLEY M. BARG CAZ8 ARA M ROSSOTTI.PC. RosERT E. 2AMLER SONNIE S. GOTTUES MaiSTI L UMSO GEORGE V ALLEN. JR., P C. RICHARO E. GALEN JCNN F. DEALY' mow ARO M. SM AFFERMAN LESLIE M. SMITH FRED QAASNER. P C. RosERT S RQassNS COumsEL DEBORAM S. SAUSER VIRGINIA S. RUTLEDGE R. MENLY WE SSTER. P C. STEVEN M. LUCAS SCOTT A. ANENGERG MATHERINE p CMEEM NATMANIEL P BRE ED. JR . P C. DAVID M RUSENSTEIN CAMPSELL MeiLEFER JANICE LEMRER-STEIN M AIM AUGENGLsCM. P C. LYNN WMITTLESEY WILSON SETH M. MOOGASI AN TRAVIS 7. BROWN. JR EKNEST L. SL AME. JR. P C. MATIAS F TRaviESO-dea 2 GAIL E. CURREY CAnETON S. JONES. p C. VICTORIA J. PERMiNS January 17, 1983 SMEILA oEUSSAMcC. ,MARVEY A R 0GWAY R,CHAmo M. MRONTH AL STEPHEN m. MEIMANN

  • NOT AOaseTTED IN O C.

WRITER'S DIRECT DIAL NUMBER (202) 822-1051 Peter B. Bloch, Esquire Dr. Jerry R. Kline Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D.C. 20555 Dr. Hugh C. Paxton Administrative Judge Atomic Safety and Licensing Board 1229 41st Street Los Alamos, New Mexico 87544 In the Matter of Wisconsin Electric Power Company ~

l (Point Beach Nuclear Plant, Units 1&2)

Docket Nos. 50-266 and 50-301(OLA1) .

l

Dear Administrative Judges:

In accordance with the schedule established by the Licensing Board, Tr. 1877, Licensee and the NRC Staff filed proposed findings of fact and conclusions of law on December 23, 1982 and January 10, l

1983, respectively. Both parties analyzed the evidence in this proceeding and demonstrated that the record supports issuance of the requested operating license amendments to permit sleeving of steam generator tubes.

Decade, the sole intervenor in this proceeding, has not filed proposed findings and conclusi6hs as contemplated by the Commission's C301190212 830117  %

l gDRADOCK05000 Q

e e SHAW, PITTMAN, PoTTs & TROWBRIDGE A PA2TNCRSMl9 Or smOFESStONA:. COIpo2AfiONS Administrative Judges Atomic Safety and Licensing Board Page Two January 17, 1983 Rules of Practice, 10 C.F.R. S 2.754, and as instructed by the Licensing Board, Tr. 1875-80; Memorandum and Order, October 1,,1982, at 18. Instead, Decade filed on December 30, 1982 a " Statement of Inadequate Record" and did not brief the defined issue in contro-versy in this proceeding.

Accordingly, Licensee respectfully requests the issuance of an initial decision authorizing the requested operating license amendments. Because the NRC Staff is in agreement with the Licensee on the resolution of the matter in controversy, and because Decade has failed to file proposed findings and conclusions, this letter constitutes Licensee's sole post-hearing reply filing pursuant to 10 C.F.R. S 2.754 (a) (3) .

Respectfully ubmitted,,

}

e W. Churchill Delissa A. Ridgway l

Counsel for Licensee cc: Service List attached i

l l

l l

9 l

e 4

00LKETE0 UNITED STATES OF AMERICA "W4' NUCLEAR REGULATORY COMMISSION BeforetheAtomicSafetyandLicen3fhgSbhhd d

-s, In the Matter of ) ,NOU.t.!IY[5nt!Ab", SERVICE ERANCH

)

WISCONSIN ELECTRIC POWER COMPANY ) Docket Nos. 50-266

) 50-301 (OLA1)

(Point Beach Nuclear Plant, )

Units 1 and 2) )

CERTIFICATE OF SERVICE This is to certify that copies of the foregoing letter from counsel for Licensee to the Atcmic Safety and Licensing Board, dated January 17, 1983, were served by deposit in the

- U.S. Mail, first class, postage prepaid, to all those on the i

attached Service List, except that those marked with an asterisk were served by hand delivery, this 17th day of January, 1983.

O. .

e0

' Bruce W. Churchill

! Dated: January 17, 1983 .

o i

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of . )

)

WISCONSIN ELECTRIC POWER COMPANY ) Docket Nos. 50-266

) 50-301 (OLA1)

(Point Beach Nuclear Plant, ) , . ,

Units 1 and 2) )

SERVICE LIST

  • Peter B. Bloch, Chairman
  • Stuart A. Treby, Esq.

Atomic Safety and Licensing Office of the Executive ,

Board . Legal Director U.S. Nuclear Regulatory Commission

~

U.S. Nuclear Regulatory Commission Wasington, D.C. 20555 Washington, D.C. 20555 Dr. Hugh C. Paxton

  • Richard G. Bachmann, Esq.

1229 - 41st Street .

Office of the Executive Los Alamos, New Mexico 87544 Legal Director U.S. Nuclear Regulatory Commission

  • Dr. Jerry R. Kline Wasington, D.C. 20555 Atomic Safety and Licensing Board - Kathleen M. Falk, Esq.

l U.S. Nuclear Regulatory Commission Wisconsin's Environmental Decade Washington, D.C. 20555 114 North Carroll Street Suite 208 l Atomic Safety and Licensing Madison, Wisconsin 53703 Board Panel U.S. Nuclear Regulatory Commission Francis X. Davis, Esq.

Washington, D.C. 20555 Monroeville Nuclear Center Westinghouse Electric Corpcration Atomic Safety and Licensing P. O. Box 355 Appeal Board Panel Pittsburgh, PA 15230 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Barton Z. Cowan, Esq.

John R. Kenrick, Esq.

Docketing and Service Section Eckert, Seamans, Cherin & Mellott Office of the Secretary Forty-Second Floor U.S. Nuclear Regulatory Commission 600 Grant Street Washington, D.C. 20555 Pittsburgh, PA 15219 0

l