ML20028D400
| ML20028D400 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/30/1982 |
| From: | Hudspeth J ALABAMA POWER CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20028D390 | List: |
| References | |
| NUDOCS 8301190074 | |
| Download: ML20028D400 (1) | |
Text
e,
,v m
AlabemaPower the scutnem electnc system December 30, 1982 so-342 srk Director NRR Nuclear Reactor Relations USNRC Phillips Building 7920 Norfolk Avenue Bethesda, MD 20014 i
Dear Sir:
In accordance with Alabama Power Company Administrative Procedure FNP-0-AP-4, Control of Plant Documents and Records, attached are revisions to plant procedures.
Please verify that you have the procedures with the corresponding copy numbers as designated on the Document Transmittal Form.
Please sign and return the Document Transmittal Forms as soon as possible to the following address:
Alabama Power Company Farley Nuclear Plant P.O. Box 470 Ashford, AL 36312 ATTN: Document Control Supervisor If you should have any questions, please call me at (205) 899-5156 Ext. 422.
Sincerely, m
_H- -
,"_S !
l Q Joeg B. Hudspeth
/
j FNP Document Control Supervisor JBil:hre cc:
Larry W. Enfinger Q O File 7
/ IO 8301190074 830113 PDR ADOCK 05000348 F
_PDR 1
4