ML20028D339

From kanterella
Jump to navigation Jump to search
Order Extending Const Completion Date from 840301 to 860701 for CPPR-147
ML20028D339
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/11/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20028D340 List:
References
NUDOCS 8301190002
Download: ML20028D339 (3)


Text

_

7590-01 UtlITED STATES Nt! CLEAR REGULATORY COMMISSION KANSAS GAS AND ELECTRIC C0"PANY KAHSAS CITY POWER & LIGHT COMPANY KANSAS ELECTRIC POWER COOPERATIVE, INC.

}{0LFCREEKGENERATINGSTATION,UNITNO.1 1

DOCKET NO. STN 50,482 ORDER EXTENDING CONSTRUCTION COMPLETION DATE Kansas Gas and Electric Company, Kansas Power & Light Company and Kansas Electric Power Cooperative, Inc. are holders of Construction Pemit !!o. CPPR-147 issued on Ny 17, 1977 by the U. S. Nuclear Degulatory Comission for constrec-tinn of the Wnif Creek Generating Statien, Unit No.1 located in Coffey County, Kansas.

By letter, dated "ovember 24, 1982, Kansas Gas and Electric Company filed an application far extension of the latest construction connietion date for the Wolf Creek Generating Station, Unit No.1 Construction Permit. It was requested that Construction Pemit CPPR-147 be extended from March 1,1984 to July 1,1986.

I The reasons given for the requested extension in tice were:

(1) the slow progres-sion of construction due in part to increasingly stringent ouality requirementsl and (2) numerous changes and additional requirements for,ilant design, including those required as a result of the Comission's regulatory review of the Three Mile Island accident.

This action involves no significant hazards consideration, good cause has been shown for the delays, and the requested extension is for a reasonable period, the bases for which are set forth in the staff's safety evaluation for this extension.

8301190002 830111 PDR ADOCK 05000482 A

PDR 07FiCE )

sua~ae )

oan >

OFFICIAL RECORD C0PY us=.an-m-=

NRC FORM 318 00-80) NRCM 024a

V 7590-01 The Corvnission has determined that this action will not result in any sig-nificant environmental impact and, pursuant to 10 CFR 51.5(d)(4), an environnental impact statenent or negative declaration and environnental impact appraisal need not be prepared in connection with this action.

The applicant's letter, dated November 24, 1962, and the NRC staff's safety evaluation supporting the OrNr are available for public inspection at the Com-nission's Public Document Room,.1717 il Street, N. M., Washington, U. C.

20555 an6 at the reporia State University, William Allen White Library,1200 Commercial Street, Enooria, Kinsas 66801.

IT IS HEREBY ORDERE0 that the 1.ttest construction completion date for CPPR-147 he extended from March 1,1934 to July 1,1986.

FOR Tile NUCLEAR REGULATORY C0tt11SS1014

/

l

! $ %kr1-A. f"P e-Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance:

JAN 11 1333

  • SEE PREVIOUS PAGE FOR CONCURRENCES sc y 3,1 m

a

[ ', _,

DL 8,(,1,,

,DL;LBil,,

,,,0 Ek D,,,

, Dk,;kf,(,1k,, DL,(g,.h,,,,,

omc, p w.M n h u.t....

suamur pu,,,,,,,,,,, i ;c y,*,JHo,1,o nic h*

, M,Ka,g a !) *,,,,,,,

,,,#,E,d,1,sp,n,

B,Q,Ypu,,, ]pp,d.

..T.N,,y.0 k......... <

U i

t 12l28L82...

.1.1a/8a.....

.1.19a............1/pl8a.....

...UQ82........1Lj0.83......1l..$l.?L...

om>

nac resu a,s00-803 nacu cua OFFICIAL RECORD COPY usa m an -assoeo

+

7590-01 /.

/

This action involves no significant hazards consideration good cause has been shown for the delays, and the requested extension is for a r/

easonable period, the bases for which are set forth in the staff's safsty evaluation for i

this extension.

/

The Comission has determined that this action will not result in any sig-

/

nificant environmental impact and, pursuant to 10 CFR Sl.5(d)(4), an environmental

/

inpact statement or negative declaration and en/

vironmenta impact appraisal need

/

not be prepared in connection with this action.

/

/

The applicant's letter, dated November 29, 1982, and the ?.RC staff's safety

/

evaluation supporting the Order are available for public inspection it the Com-

/

nission's Public Document Room,1717 H Street, H. W., Washington, D. C.

20555 and at the Emporia State Univers ty, Willian Allen White Library,1200 Comercial

/

I Street, Emporia, Kansas 66801.

/

IT IS HEREBY ORDERED that the latest construction completion date for CPPR-

/

147 be extended from March 1,1984 to July 1,1986.

FOR THE N0 CLEAR REGULATORY C0ttilSS109 l

i Darrell G. Eisenhut, Director Division of Licensing l

Office of !!uclear Reactor Regulation l

l Date of Issuance:

1

/

l t

omce >.. 0.0.LJM.1...........9h.ikBjl,h,,g,E L D,,,,,,,,,,,,

0 :(B f0,,,,,,,,,

,,DL,; ADLL,,,,,,D,(,: 0IL,,,,,,

,1,,g,nic,h,,, f,

,,$ @h(y,,9uygklppd sunu-c> M.R,u,{p,),f,@,$,,:,H

,,,,!,,,,,,,@[1[t3

,,,,,T!!py,a h.,,,, D,E,b,e,n h,u,,t,,,,

....li61/.8.2,,,

em>

NRC FORM 318 0W NRCM ONO OFFISAL RECORD COPY usago ieei-ns-eso