ML20028D325

From kanterella
Jump to navigation Jump to search
Forwards LER 82-163/03L-0
Date released: 02/11/2020 Download: ML20028D325


LER 82-163/03L-0:on 821211,during Routine Power Supply Switching Operation,Both Shutdown Cooling Loops Isolated. Caused by Momentary Loss of Power to Rps.Shutdown Cooling Restored
ML20028D326
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/07/1983
From: Freeman M
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20028D326 (1)
Forwards LER 82-163/03L-0
ML20028D324
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/07/1983
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20028D324 (1)