ML20028C998

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Item Q-E Re Lack of Insp Personnel Qualifications.Initially Reported on 821208.Investigation Expected to Be Completed by 830315 & Followup Rept Will Be Submitted
ML20028C998
Person / Time
Site: Zimmer
Issue date: 01/06/1983
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2202, NUDOCS 8301140386
Download: ML20028C998 (1)


Text

-

o-  %

kii 's THE CINCINNATI GAS & ELECTRIC COMPANY AGtN

' " ' " " ^ ^ " ' ## '

WM. H. ZIMMER NUCLEAR POWER STATION, UNIT 1 P.O. BOX 201, MOSCOW, OH 45153 January 6, 1983 QA-2202 E. A. SORGMANN SENIOR VICE PRESiOENT U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road

- Glen Ellyn, IL 60137 Attention: Mr. J. G. Keppler Regional Administrator RE: WM. H. ZIMMER NUCLEAR POWER STATION, UNIT 1 10CFR50.55(e) ITEM Q-E, LACK OF INSPECTION PERSONNEL QUALIFICATIONS DOCKET NO. 50-358, CONSTRUCTION PERMIT NO.

CPPR-88, W.O. 57300, JOB E-5590, FILE NO. NRC-9 -

Gentlemen:

This letter consitutes an interim report concerning the subject condition reported to the Commission as a potentially reportable deficiency under 10CFR50.55(e) on December 8, 1982.

As stated in our December 8 report, the possibility exists that personnel may have performed inspections without the proper personnel qualifications per ANSI N45.2.6 (1978). The quality assurance programs controlling measures to en-sure that only qualified personnel performed inspections is also indeterminate.

These concerns are presently under investigation to establish their validity and determine if a reportable condition exists. This effort will be completed by March 15, 1983, at which time a follow-up report will be submitted.

We trust the above vill be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY 8301140386 830106 PDR ADGCK 05000358 By S PDR E. A. BORGMANN SENIOR VICE PRESIDENT DLC:jas cc: NRC 0ffice of Inspection & Enforcement Washington, D.C. 20555 NRC Senior Resident Inspector JAN101983 Attn: W. F. Christianson Zimmer Project Inspector, Region III

'p t . -