ML20028C825

From kanterella
Jump to navigation Jump to search
Informs That No Other Utils Have Disclosed Any Weld Enhancements.All But One Weld Resolved Per IE Bulletin 82-01,Rev 1.Remaining Weld to Be re-radiographed by Bechtel at Site
ML20028C825
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/20/1982
From: Jordan R
JOHNSON CONTROLS, INC.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-SSINS-6820, REF-SSINS-SSINS-6 IEB-82-01, IEB-82-1, NUDOCS 8301140182
Download: ML20028C825 (1)


Text

-

. - - =

,f /~ se Associated Piping & Engineering Corp.

- 1707 West Compton Boulevard Post Office Box 4309 Compton. CA 90224 -

Tel. 213/537 7200 United States Nuclear JQ Q .

Regulatory Commissio:

CONIR5LS n'ygg2=ori>

b & ROCOSS Pip.ing Arlington, Texas 76012 Division December 20, 1982 Attn: Mr. John T. Collins, Regional Administrator-Region IV Subj: FOLLOW-UP INFORMATION TO MY LETTER DATED JULY 6, 1982 REGARDING NRC BULLETIN #IE-82-01, REV. 1.

Dear Mr. Collins:

As I suggested in the subject letter, all but one (1), of what eventually turned out to be fifteen (15),of the welds in question at the WNP-2 site, were resolved by reviewing, comparing, and substituting our file copy of the film for the custcuer's copy, This was accomplished at our facility in conjunction with l Bechtel site personnel. The one (1) weld which could not be resolved was to l be re-radiographed by Bechtel on-site and, since we have never heard any more about it, we can only assume it has been taken care of in the field.

We have completed the review of all the radiosraphs on the Sacramento Municipal Utility District, Rancho Seco, project as we stated we would in the last para.

of the subject letter. I am pleased to report that this review did not reveal any evidence of any enhancement being performad.

l We have not been informed by any other utilities of disclosure of any enhancemer,ts, so we feel that the enhancement activities were restricted to the two (2) nuclece sites, WNP-2 and WNP-3, of which you have been advised.

If any further action needs to be taken by us, please advise. As of this tine,.

we feel that we have taken all necessary action to review and resolve the question-able areas and therefore consider this a closed subject.

Very turly yours, AT IP & ENGINEERING CORP. O R. L. Jg dan g

ManagefE of Quality Assurance 8301140 82 821220 ~"

J\

PDR M 05000397 G pop