Final Rept Re Significant Const Deficiency 23, Defective Valve Actuators (Fisher Controls). Spring Return Actuator Guide Sleeves Replaced & Valve Actuator Assemblies Reworked.Also Reported by Gh Bettis Per Part 21
ML20028C726
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/06/1983
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, W3I83-0003, W3I83-3, NUDOCS 8301140041
Download: ML20028C726 (2)


Text

}

s

yt._.

LOUISIANA P O W E R & L 1 G H T! R o. Box 6008. NEW ORLEANS. LOUISIANA 70174 242 oeunoNoe srnter

  • (504) 368-2345

$uS$sysS$

L V. MAURIN Voce President Nuckar Operations Janusry 6, 1983 W3I83-0003 Q-3-A35.07.23 Mr. John T. Collins, Regional Administrator, Region IV

]

/

i U. S. Nuclear Regulatory Commission t

r

'"i j

611 Ryan Plaza Drive, Suite 1000

-l s

Arlington, Texas 76012 M101983 i

SUBJECT:

Waterford SES Unit No. 3 8

m Docket No. 50-382 Significant Construction Deficiency No. 23

" Defective Valve Actuators (Fisher Controls)"

Final Report

REFERENCE:

LP&L Letter W3I82-0074 dated October 15, 1982

Dear Mr. Collins:

In accordance with the requirements of 10CFR50.55(e), we are hereby providing two copies of the Final. Report of Significant Construction Deficiency No. 23, " Defective Valve Actuators (Fisher Controls)."

If you have any questions, please advise.

Very truly yours,

{ d.7 L. V. Maurin LVM/ MAL:keh Attachment cc:

1) Director 3)

E. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 (with 15 copies of report) i l

2) Director 4)

W. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission l

Washington, D. C.

20555 i

(with I copy of report) l 8301140041 830106 PM ADOCK 05000382 g

PDR

y.

n

25 0 :5 g

ha a

y 7.

.FkNALREPORTOF-SIGNIFICANT' CONSTRUCTION DEFICIENCY NO.L23c

" DEFECTIVE VALVE ACTUATORS ((FISHER' CONTROLS)'?

- INTRODUCTION;

- This report :is; submitted, pursuant to 10CFR5'0.55(e).

It describes defects in 'the

- Spring Return Actuators.:resulting in replacement of the-spring' guide sleeves.

'c

-This problem is considered reportable:under the requirements of 10CFR50.55(e). :

This problem was identified to the USNRC by G.H. Bettis ' Corporation under 10CFR23..

DESCRIPTION In November 1980, during testing by thel.Hd Bettis Corporation _in'their R &-D G

Laboratory, a defect was discovered in the N521C-SR/N522C-SR (Spring Return)-

Actuators supplied by Jamesbury Corporation,LPO No. NY-403539, and Fisher Controls Company, PO No. NY-403483. Bettis'found that the sp' ring guide sleeve shifting internally could prevent the movement of.the actuator. The failure to actuate ~

l could only occur in the normal power ' stroke, and if the "0" degree position'of' the: valve is actually past the normal "0" of the actuator. These actuators are'

.used.on valves-in the component cooling water and HVAC systems.

~

i SAFETY IMPLICATIONS l

r Further evaluation since.the Interim Report has indicated that this deficiency I

on the component cooling water isolation valves to the Reactor Coolant Pumps (3CC-B188A1, 3CC-B189B1, 3CC-B190A2, and 3CC-B191B2) would not create a safety i

haza.d.

The deficiency is, however, still considered reportable due to its j

effect on HVAC control room isolation valves (3HV-B169A, 3HV-B170B, 3HV-B177A,

~

3HV-B178B, 3HV-B171A, 3HV-B172B). This deficiency could have caused these

~

valves.to fai11to isolate.

CORRECTIVE ACTION IMPLEMENTED

+

The corrective action for this significant construction deficiency involved the reworking of the above mentioned valve actuator assemblies.

i Nonconformance Report W3-3058, along with service forms #81-11-235, 81-11-236, 82-4-49, 82-12-122, and G.H. Bettis-Corporation Corrective Action Report No. 0011 were generated to instruct, track, and document corrective action.

l Corrective action was completed under the direction of the Bettis-representative, using'the above mentioned NCR, service forms, and corrective action report.

' The corrective action, service forms, and nonconformance report documentation have j

been reviewed.. accepted, and closed as of December 28, 1982.

l i

This report is submitted as the final report.

i f

I i

6