ML20028C240

From kanterella
Jump to navigation Jump to search
Forwards LER 82-025/03L-0
Date released: 02/11/2020 Download: ML20028C240


LER 82-025/03L-0:on 821130,one Steam Flow Channel Differed from Redundant Channels During Power Reduction Due to out- of-calibr Transmitter.Cause Not Known.Transmitter Recalibr & Returned to Svc.Transmitter to Be Replaced If Drift Recurs
ML20028C244
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 12/30/1982
From: Hunstad A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20028C244 (1)
Forwards LER 82-025/03L-0
ML20028C239
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 12/30/1982
From: Musolf D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20028C239 (1)