ML20028C148

From kanterella
Jump to navigation Jump to search
Forwards LER 82-048/03L-0.Detailed Event Analysis Encl
Date released: 02/11/2020 Download: ML20028C148


LER 82-048/03L-0:on 821201,w/thermal Margin/Low Pressurizer Pressure (Tm/Lp) Channel D Inoperable,Trip Signal Inserted in Tm/Lp Channel a Removed Before Declaring Channel a Operable.Caused by Misinterpretation of Requirements
ML20028C152
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/28/1982
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20028C152 (1)
Forwards LER 82-048/03L-0.Detailed Event Analysis Encl
ML20028C147
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/28/1982
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20028C147 (2)