ML20028C105
| ML20028C105 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/12/1980 |
| From: | Dutton D GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-102, NUDOCS 8301070010 | |
| Download: ML20028C105 (2) | |
Text
ho I.!-034 S
WJ.-c8V03h 2l"V N
Geona Power Coir;;r:r/
(?
Pora 05:e Bcx 4s45 Atum. Georg'a 30302
- {, p 9
0D Vcgile Project
u Telephone 404 522-Gogo Sv/Jicm Corvany sA:rvices. Inc.
Pes: Of5ce Box 2625 B:rm'nr. ham, A:abama 352c2 TCcphons 2oG 07Mo11 Deceraber 12, 1980 JE FILE COPIg United States t!uclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street Atlanta, GA 30302 Attention: Mr. James P. O'Reilly File:
T.76G03-M15 Log:
Gll-102
Reference:
59-424, 50-425, Westinghouse 3" Gate Valve Closure Problem Gentlemen:
On Npvember 13, 1980, Mr. Charles Hayes of Georgia Power Company reported to Mr. John Rausch of the liRC a potential deficiency concerning Westinghouse EMD Division manufactured three-inch gate valves Models $18fL
~
C' g
and 3GM99.
The problem associated with the valves was that full stroire ~ ~
was not accomplished during pre-operational testing at a domestic station.
I Georgia Power Company is conducting engineerina evaluations on the uses of the above type valves in piping systems 6t Plant Vogtle.
These evaluations will datermine whether or not a deficiency exists.
i i
At this time, Georgia Power Company cannot com.Tiit to a fira date for i
the final report concerning this prcblem. He will submit en interim report to the Commission on or before March 3, 1981.
i l
This response contains no proprietary information and mey be placed in the i4RC Public Document Rocia upon receipt.
p q QJfc em Ccug D eton Projcct General funager CWH:tp xc:
(See Page 2)
DESIGUATED ORIGINAII certified BY--
r301070010 801212 PDR ADOCK 05000424 S
PDR OFFi.CIAL COPY
R Mr. Jcmes P. O'Reilly
.~ '
Uestinghouse 3" Gate Valve Closure Problem Deceder 12, 1980 4
Page 2 xc:
U. S. Nuclear Regulatory Conriission Attn:
Victor Stello, Jr., Director
)
Office of Inspection and Enforcement Washington, DC 20555
~
l1. D. Hunt, NRC - Region II J. H.. Miller,. Jr.
W. E. Ehrensperger F. G. Mitchell, Jr.
R. J. Kelly C. F. Whitr..er R. E. Conway D. E.. Dutton-H. C. Diz...~.,'b'.
R. W. Staffa K. M. Gillespie e
L. T. Gucwa C.
P..
tiiles, Jr.
E. D. Groover D. L. IicCrary R. A. Themas
._ s 1
- 0. Batum J. A. Bailey II. Z. Jeric B. L. Lex 9.,q. w p, i
)
i 1
s f
i 3
e.,
,w~
v
<.-,--,. - -, - -p w-n
,-.m---
.n
,ee
- ~, - - -
,nw-m-~,a w
-m.
- -