Discusses Potential Deficiency Re Westinghouse 3-inch Gate Valves.Full Stroke Not Accomplished During Preoperational Testing.Engineering Evaluations Underway.Interim Rept Will Be Submitted by 810303
ML20028C105
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/12/1980
From: Dutton D
GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-102, NUDOCS 8301070010
Download: ML20028C105 (2)


Text

S ho I.!-034 WJ.-c8V03h N Geona Power Coir;;r:r/

2l"V '

(?

Pora 05:e Bcx 4s45 Atum. Georg'a 30302

- {, pu

' 9 Telephone 404 522-Gogo 0D Vcgile Project Sv/Jicm Corvany sA:rvices. Inc.

Pes: Of5ce Box 2625 B:rm'nr. ham, A:abama 352c2 TCcphons 2oG 07Mo11 Deceraber 12, 1980 '

JE FILE COPIg United States t!uclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street Atlanta, GA 30302 Attention: Mr. James P. O'Reilly File: T.76G03-M15 Log: Gll-102

Reference:

59-424, 50-425, Westinghouse 3" Gate Valve Closure Problem Gentlemen:

On Npvember 13, 1980, Mr. Charles Hayes of Georgia Power Company ,

reported to Mr. John Rausch of the liRC a potential deficiency concerning Westinghouse EMD Division manufactured three-inch gate valves Models $18fL g and 3GM99. The problem associated with the valves was that full stroire ~ ~

~

C' I

was not accomplished during pre-operational testing at a domestic station.

Georgia Power Company is conducting engineerina evaluations on the uses of the above type valves in piping systems 6t Plant Vogtle. These i

evaluations will datermine whether or not a deficiency exists.

i At this time, Georgia Power Company cannot com.Tiit to a fira date for i the final report concerning this prcblem. He will submit en interim report to the Commission on or before March 3, 1981.

i l

This response contains no proprietary information and mey be placed

! in the i4RC Public Document Rocia upon receipt.

p q QJfc em Ccug D eton Projcct General funager CWH:tp xc: (See Page 2) DESIGUATED ORIGINAII certified BY--

r301070010 801212 PDR ADOCK 05000424 S PDR OFFi.CIAL COPY

R

~ '

Mr. Jcmes P. O'Reilly Uestinghouse 3" Gate Valve Closure Problem 4

Deceder 12, 1980 Page 2 xc: U. S. Nuclear Regulatory Conriission ,

Attn: Victor Stello, Jr., Director

) Office of Inspection and Enforcement Washington, DC 20555

~

l1. D. Hunt, NRC - Region II J. H.. Miller,. Jr.

W. E. Ehrensperger F. G. Mitchell , Jr.

R. J. Kelly C. F. Whitr..er -

R. E. Conway D. E.. Dutton-H. C. Diz...~.,'b'.

R. W. Staffa -

K. M. Gillespie ,

e L. T. Gucwa C. P.. tiiles, Jr.

E. D. Groover D. L. IicCrary

._ s R. A. Themas
0. Batum 1

J. A. Bailey II. Z. Jeric '

B. L. Lex -

9.,q. w p, i

)

i 1

s

  • f i

3 e.,

,w~ v < .-,-- ,. - - , - -p w-n .. ,-.m--- ,- -- -, ,ee - ~ , - - - , ,nw- m-~,a ,,, - -