ML20028C102

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 50 to License DPR-70
ML20028C102
Person / Time
Site: Salem 
Issue date: 12/27/1982
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20028C100 List:
References
NUDOCS 8301060537
Download: ML20028C102 (2)


Text

.

7590-01 MNITE9 STATES NUCLEAF, REGULAT09Y COMMISSION DOCKET MO. 50-272 PUBLIC SERVICE ELECTRIC AND GAS COMPANY, PHILADELPPIA ELECTRIC COMPAhY, DELMARVA POWFD. AND LIGHT COMPANY, AND ATLANTIC CITY ELECTRIC COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICEilSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 50 to Facility Operating License No. DPR-70, issued to Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees), which revised Technical Specifications for operation of the Salem Nuclear Generating Station, Unit No.1 (the facility) located in Salem County, New Jersey. The amendment is effective as of the date of issuance.

The amendment revises the Technical Specifications pertaining to borated water systems, the refueling water tank, and the spray additive system to bring these specifications into agreement with those for Salem Unit 2 and with the requirements of NRC/IE Bulletin 77-04 The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commissio.n has made appro-priate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

8301060537 E21227 PDR ADOCK 05000272 p

PDR

759d-01 2-The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR ;51.5(d)(4)'

an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the application for amendment dated October 5,1982,(2) Amendment No. 50 to License No. DPR-70, and (3) the Commission's related Safety Evali;6 tion.

All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D.C. and at the Salem Free Public Library,112 West Broadway, Salem, New Jersey. A copy of items (2) and (3) may be obtained upon request addressed to the U. S.

Nuclear Regulatory Commission, Washington, D.C.

20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 27 day of December,1982.

f\\

F0ll)THE NUC AytEGULATORYCOMMISSION t

rN, f

perating Reactors anch #1 Division of Licensi a

9 e

.*E 8