ML20028B959

From kanterella
Jump to navigation Jump to search
Mod 7,providing 3-month no-cost Extension to 821231,to Quantitative Classification of Two Phase Flow Regimes Using Global & Local Neutronic Perturbations II
ML20028B959
Person / Time
Issue date: 12/15/1982
From: Gustave R, Treibel W
NRC OFFICE OF ADMINISTRATION (ADM), WASHINGTON, UNIV. OF, SEATTLE, WA
To:
Shared Package
ML20028B956 List:
References
CON-FIN-B-6324, CON-NRC-04-78-245, CON-NRC-4-78-245 NUDOCS 8301040150
Download: ML20028B959 (2)


Text

-

4 Modifitition lio. 7

' uppit. ent al / greer.u nt t o 6

contiat1 !!o. NRC-04 48-245 SUPPL LI,f N1 AL AGRI i nEll)

BE lWL Eri

'THE UNIVERSITY OF WASHINGTON AND lHE U. S. fiUCI E AR Rf GUL A10RY C0".MlSS10N THIS SUPPL LMf fil AL AGRI LMEtil, ef fec t i ve the 1st day of October 1982, by and betteren the UNllED ST ATES Of AMERICA (hereinaf ter referred to as the "Gover n:7.ent"), as' repre',ented by the UNIT ED ST AT ES NUCI EAR R! GUL A10RY C0" MIS-S10" (hereinef ter referred to as the "Co:n.nission"), and THE UNIVERSITY OF WASHIriGT0fi (hereinafter referred to as the " Contractor").

WilNL55LTl! IHAT:

UHE RF AS, the pa rties desire to modify Contract !!o. NRC-04-78-245 as hereinafter pr ovided, and this supplem: ental agreement is authorized by law, including the Er.ergy Reor canization Act of 1974, as amended, and the Atomic Energy Act of 1954, as a;:. ended.

NOW, lHE.L.EI ORE, said contract i s hereby modified as follow's:

1.

in the prefatory sentence of APPENDIX A, the date " December 31, 1982" is substituted for the date " September 30, 1982 2.

ln ARTICL E II - IHE PERIOD Of PERFORMANCE, the date "Deccober 31, 1982 is substituted fcr the date " September 30, 1982,"

q

~

l 1

i I

t l

8301040150 821215 l

PDR CONTR NRC-04-79-245 PDR

'u;>;.h

  • enici l y cti : nt t-a C ont i. ri I:3. NRC-04-T8-N5 Pc9e !;o. 2 5

IN WilNf 55 L'iill' LOT, tiie parties have execut ed thie, document.

UN)l E D 51 A1 E S Of A"J h ) C A o,,pQ[ff

&2 BY:

<aymond P. Gustavt Contracting _ Officer _

( t i t.l e)

Nuclear Regulatory Cornission THE UNIV T

r WINGTON BY:

~ Jg_

WALLACE C TREIBEL DEC 1 5 1982 Gpvornman!_M:a! _ Relation %-

Fk and Pat, di),e,)r n

r.

k._ _

grig,_rM_, c e r t.i fy th a t I ar. t he 1, [,u h g $a;ttyter3

. Wb E

__ of the Contractor r.amed that _],c)Q[1gq f g(signatory)d t_. W 4 _ _ _ _ _ ___

under t his document; who signed this document on behalf of said Contractor was t!.en e-<> T f M C L COM%>2t--(_I M8 v of said Contractor; that this document was duly signed for and on behalf of said Contractor by authority of its governing body and is within the scope of its legal p o.ce rs.

i IN UllNESS 1,'HLREOF,1 have hereunto affixed my hand and the scal of said Contrector.

O

-f c.A sjw,

_ w (SEAL)

\\

l t

(