Responds to NRC 820930 Ltr Re Violations Noted in IE Insp Rept 50-382/82-18.Corrective Actions:Nonconformance Rept W3-4374 Issued Reporting Lack of Approved Design & Weld Insp Documentation on Mod Insp.Procedure CP-717 Revised
ML20028B919
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/29/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20028B916 List:
References
W3I82-0088, W3I82-88, NUDOCS 8212070228
Download: ML20028B919 (2)


Text

~

l OUISIANA f 242 OctARONOe smeer POWER & LIGHT / P O box 6008

  • NEW ORLEANS. LOUISIANA 70174 * (5041 366 2345

'#NO Uf dYS L.V. MAURIN Vice President Nuclear Operations i/

October 29, 1982 W3I82-0088 Q-3-A35.02.01 Mr. G. L. Madsen I Reactor Projects Branch, Regien IV U. S. Nuclear Regulatory Commission iJ hh '

in n a 012 ,

3R l  ;

}

L g

SUBJECT:

Waterford SES Unit 3 -

Reply to USNRC Inspection Report 50-382/82-18 -

Dear Mr. Madsen:

The following informatica is provided in response to inspection report 50-382/82-18 which identified the following violation:

"10 CFR Part 50, Appendix B, Criterion V, states in part:

Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.

" Contrary to the above, an unspecified weld had been used to attach a plate to a diagonal horizontal angle brace at elevation 53' location 9'9" north and 6'9" west at column L-10 AZ instead of attaching the plate with bolting as specified by Ebasco Drawing G-842D.

"This is a Severity Level V Violation. (Supplement TT)

(382/8218-01)"

The following information is submitted:

1. Corrective Action Taken and the Results Achieved:

Nonconformance Report W3-4374 has been issued reporting the lack of an approved design and weld inspection documentation on the modification observed by the NRC Inspector. As a result of the referenced Nonconfor-mance Report, FCR-AS-2229, Revision 2, has been written to document the change.

2. Corrective Action Taken to Preclude Repetition:

Ebasco Procedure CP-717 has been revised to provide a method to establish Hold Points on Seismic Class I welds and to provide a record form for Cou-struction and Quality Control to sign off required Hold Points.

8212070228 821203 PDR ADOCK 05000382 O PDR

a. ,

, l Mr. C. L. Madsen W3I82-0088 Page 2 If you have any questions concerning this response, please advise.

Very truly yours,

f. gaa L. V. Maurin h ((

LVM/ DAB /keh cc: E. Blake, M. Stevenson