Forwards LER 82-022/03L-0.Detailed Event Analysis Submitted
Date released: 02/11/2020 Download: ML20028B462


LER 82-022/03L-0:on 821025,RHR Time Delay Relay 10A-K45A Failed to Operate within Required Time Limits.Caused by Setpoint Being Set Too Conservatively.Relay Readjusted & Correct Operation Verified