Text
90 & olb
- j Da "8 ctgg, UT41TED STATES
!\\T,ulj NUCLEAR REGULATORY COMMISSION C
WASHING T O N, D. C. 20555 gh s..,...,/
t October 27, 1982 Michael H. Lipson, Esquire Of fice of the Lieutenant Governor State of Vermont IN RESPONSE REFER Montpelier, VT 05602 TO FOIA-82-445 Daar Mr. Lipson:
This is in further response to your letter dated September 16, 1982, in which you requested, pursuant to the Freedom of Information Act, three separate categories of documents regarding shipments of waste through Vermont from Chalk River.
The documents listed o. Appendix A are responsive to your request.
Documents 1 and 2 are released in their entirety.
Documents 3, 4, and 5 contain unclassified safeguards information. The statutory authority-for withholding this information is found in Section 147 of the Atomic Energy Act (42 U.S.C. 2167). This information is being withheld from public disclosure pursuant to exemption (3) of the Freedom of Information Act (5 U.S.C. 552(b)(3)) and 10 CFR 9.5(a)(3) of the Commission's regulations.
Copies of the non-exempt portions of these documents are enclosed.
Pursuant to 10 CFR 9.9 of the Conmission's regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest.
The persons responsible for this denial are the undersigned and Mr. John G. Davis, Director, Office of Nuclear Material Safety and Safeguards.
This denial may be appealed to the Connission's Executive Director for Operations within 30 days from the receipt of this letter.
As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Connission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial FOIA Decision."
The search for additional documents r,ubject to your request is continuing.
When we have completed our search, you will be advised of our determination.
Sinc,er ly,
/
f
. M. Felton, Director Division of Rules and Records Office of Administration
Enclosures:
As stated ei2'11300'140' B2102f '
'" ~ ]
~
1 O'
- Re:' F0IA-82-445 Appendix A 1.
Letter to Director,- Region I from F. L. Danese, June 16,'1982.
~
- 2..
Letter to Raymond McCandless from F. L. Danese, July 2,.1982.,
3.
. Letter to Director, Region I from F. L; Danese, with enclosure, June 3, 1982.
4.
Letter to Directc., Region i from F. L. Danese, with enclosure, July 7,1982.
5.
Schedule Information Sheet, July 1982.
d 6
_______-_--___.._----__-_-_____.-_____)
e Nucletr Assurancs Corporation 24 Esecutiva Pan West A!!ama. Georcia 30329 (404)325-4200
.,3 Te.oc 549567, f *.2703 Y? D N$~h u,-:a w;;Q.%:j.~ h w W ex..;p:w
="*~~
- ~"*'v
- 715 horaon Drive w.q=ryg%- '
- ~
z h
~ ~~ M'- *:5495:ior.d Junction;Cosoraco B1501
}
gy3gy.; y -
- ^~
(393,945 43pg TWX: 9109296334 Weinbergstrasse 9 8001 Zurich. Switzerland (01) 470844 Telex: 57275 June 16, 1982 FLD/82/66/ETS Director, Region I U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 631 Park Avenue King of Prussia, Pennsylvania 19406 Attn: Mr. A. Gody
Dear Sir:
This letter confirms my telephone call to your office this morning advising that a series of six spent fuel shipments from the Atomic Energy of Canada Chalk River facility to the DOE Savannah River facility have been indefinitely delayed.
We will provide you with a new shipment itinerary when these shipments are rescheduled.
Please call me if you have any questions.
Sincerely, NUCLEAR ASSURANCE CORPORATION 0w-a A F. L. Danese Manager,, Cask Op'6 rations FLD:lwb r
cc: Director, Region II Material Transfer SG Licensing Branch U.S. Nuclear Regulatory Commission Division of Safeguards Office of Inspection and U.S. Nuclear Regulatory Commission Enforcement Washington, D.C.
20555 101 Marietta Street Suite 3100 Attn: Mr. Charles Hillman Atlanta, GA 30303 Attn:
Mr. M. D. McGuire p DP~
L
\\
'~
~
3, -
b c r A. mem W 2 4 te. w,% ri w -=:.
w.: t_ G nvp :c23 ' ',.
_]{ ^,
V& u &L *:X>
h ? y M=
9 '. :.7.::*.'*:::. ;-
m.-cic e;;, N T -
.. c.. t i' '. --.
- ..212 C M.y;g._.
D NfNQ.p~Ita- :w, Dae
'C* - D -
E ;-j[d* M h h,$[h Ii-
,15 Gas.T.!un::::rt. hw ad 4*dQ) 24.4320
- - Twx
- Stamt
%+r: or~;: s e 9
.l ~
- . 5Xn Zun:~.. S-ctv;wn anj oosu w=c srzrs July 2,1982 FLD/82/81/ETS
'ir Rayr.:nd. McCerdia.ss, Director rGiWsion of Occupational and Radiologica.1 Fealth 3 0 Saic' vin Street r.ontpelier, Ver;cnt ' 05602 3
.3.~.1r. M cc. n,11 m -
In eccordance'with the rWui rr 2nts of 10 CFR 73.37, the Nuclear Assur-.
fuel ship.wnts ance Corporation barnby rekes noti fica:iori of a series of spant through the st-te of Vermnt.
F. equi red i nfo rm,3ti on regarding these shipments
.is es ful1o.rn Shipp3r:-
Chalt River Nuclear Laborataries Atesic Enmy of Car. eda, Limi.ted Crutik Ri ver, Chta ri o, Can a da XOJ IJO 1-613-687-5531, ex*. 2400 Carrier:-
Tri-Stata.'.!at'pr-Tran> i u c a pany P.
O._ Box 113 Joplin, Missouri 6.301 1-MO-M1--7 5 91
-Meivar-S Depar cant of Errargy S vannik R i ver P1 ant D.nba rton, Scuttr Can)1ina 29801
~..
1-90' -7 25-6 P_I L for t.M shipper in The Nucle.sr Assurance Cormoration. is fctintr._as Acent 1
8211300142 821027 the Unit ed States.
LIPSON82-445 PDR P e t -ri al c.-3 c.ri p:-i nn :
C~a r.!: P.a di oact i v e r.at e ri a l, fissile N.0 5 ;
Irradi at ed uranium fuel rods; Rac1onuclidds Group II-Cor.ninar-Nt_I M02-Cnntainer Certification:
USA /9103/S( )F 3 CON Endorse.. cot E-53; Label:
Radioctri Ye TallCW 111:
Transport Inde:(- 50:
License ISNM 79008-Sol i d-U/Al alloy Ir. cort Act i v i ty -.300,000-600,000 Ci, rai x ed fission pr ed ucts.
L -
.g.
i z...
7)... -
u.,
t,...-.-
s..
$, l.;p~s ::; :
- ..w m...yse.,wl,y.:.-g- : &.zg..
3.... g e,,,.
.. - L~; c
._v,,
=-.
...,.,..,. e,.. n
- % * 'i'S->[+ ' -
%--~i& 1k. ;j;5.x.,..... -g:.
r..
.m.
~ - =.
W;yyg;3 nd1YMM3X'd~'
July: 2, 1982 Page. T wo
~
Rodning N "_.en'ont is on: -
1-91 south to Massachusetts Scheduling: infomation is enclosed separately.
If you. have any goestians. p1 t.ase dalT
=c.
2 i n c are,s y,.
3 F.JCLOR ASSURANCE CfRPORATION
.4,,
3.
r F. L. Danese Man?. gar, Cask. Operations FLD.*.?vb b
.0 8
2 2
e e
N.
h S
e S
e 9
e.
Nuclear Assuranc2 Corporttion 24 Enembve Park West At!anta. Georg:a 30329 (404)325-4200
- Telex: 549567, 542703,
,3' fry & - Q-.13 ;;.t 3QyF9y*
? _
f.e_y % % : % x::f ~ & W e t m M ;~ & nt fe
.kn
%&w
- '. 715 horizon Ddver...-
O S h Q Q h.*; Q W '~-: W W i 2 h ' ' '.
- ~~'WN. S. Grac:L' JJnction;;C5'5? ado 815G1 s w. - - -.-
. (303; g45 43po 7WX: 9109296334 Weinbergstrasse 9 8001 Zurich. Switzerland (01) 470844 Telex: 57275 June 3,1982 FLD/82/52/ETS Director, Region I U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 631 Park Avenue King of Prussia, Pennsylvania 19406 Attn:
Mr. A. Gddy
Dear Sir:
~
The Nuclear Assurance Corporation (NAC), as agent for Atomic Energy of Canada, Limited (AECL), plans to make a series of spent fuel shipments from an AECL facility at Chalk River to the U.S. DOE Savannah River Plant. These shipments would enter the U.S. at Alexandria Bay, New York, under NAC's Import License No. ISNM81005, Revision 1, and would continue until the material described by the license has been shipped or the shipments are delayed for reason.
The schedule for these shipments is enclosed.
Adjustments to the schecole will be made in writing if time permits, and by telephone (followed by letter) if necessary.
This notification is made in accordance with the requirements of 10 CFR 73.72.
Sincerely, NUCLEAR ASSURANCE CORPORATION F. L. Danese Manager,, Cask Oferations FLD:1wb cc: Director, Region II Material Transfer SG Licensing Branch U.S. Nuclear Regulatory Commission Division of Safeguards Office of Inspection and U.S. Nuclear Regulatory Conmission Enforcement Washington, D.C.
20555 101 Marietta Street Suite 3100 Attn:
Mr. Charles Hillman Atlanta, GA 30303 Attn:
Mr. M. D. McGui re
'y h',
59 -
-7
- -~
- y...
. J - n -.
. ~ ~
- . - ;+=&:, :;.;.. c.
~
p 11 -
x;yg=7;; -
-c
__-i~~-
~
sm YN m ?$. &_ YN'T Y $
$5l-?:
_a
%s-
- SCHEDULE 1riFORMATI0ft
~
&^
T. ~ Q.' : ' ' -
.-._ g - w % -- B g y -
~
E
__ _ _ T Q. g g g
MN95?Nd-- @W-M-M-
- _cmnemnfomation descr'ibed b' ?
k N E D O N N W 3 D-M. M d t h.'
elow is required by fiRC regulations to be irrotec~tede~
[
in accordance with the requirements of 10 CFR 73.21.
.3' Number of shipments: :6
~
t Estimated Time and Date 'of Departure from Origin (AECL):
Ti me Date 4
~ Shipment 1:
01:30A
.06/11/82 Shipment 2:
01:30A 06/18/82 Shipment.3:
01:30A 06/25/82
~
Shipment 4:
01:30A 07/02/82~
Shipment 5:
01:30A 07/09/82 Shipment 6:
01 :30A 07/16/82 Estimated Time and Date of Entry at Alexandria Bay, NY:
., Time Date Shipment 1:
06:15A 06/11/82 Shipment 2:
06:15A 06/18/82 Shipment 3:
06:15A 06/25/82 Shipment 4:
06:15A 07/02/82 Shipment 5:
.06: 15A
'07/09/82 Shipment 6:
06:15A 07/16/82 Estimated Time and Date of Arrival at Destination (SRP):
Time _
Date Shipment 1:
01:30P 06/12/82 Shipment 2:
01 :30P 06/19/82 Shipment 3:
01:30P 06/26/82 Shipment 4:
01:30P 07/03/82 Shipment 5:
01:30P 07/10/82 Shipment 6:
01: 30P 07/17/82 For this series of shipments, this schedule information must be protected in accordance with the provisions of 10 CFR 73.21 until 10 days after the last shipment in the series is complete.
The last shipment in this series is esti-mated to be completed on July 16, 1982.
Note:
Lines 38 and 39 may be used in the event the above schedule is revised.
l'.
e n
g o
- l
'd g ;
Nuclesr Assuran:e Corpor;.tlon 24 E=ecube raq west At'ama. Georc a 30329 (C 21325-4200
...g,
1 men.54 FAG 7,542JD3.
..? =m -.
- a....
~~:h). -- < - :.:......,.,. ~3.q-1 *vi?;~ ~ ~ '. a.~ W m ".,-:~*., & ~'=?' M & =~ M ".
1
- ~. 21b nopron Dmt _
w ':2.~:
J r% t M ?,::=.*:
'~ ' * "* :..W }'? Gu,r.cf.Jan; Son. Co*xado 81501
- L.w=st - ; *.. %Ly3k;,J.' Q?:
l: M,,.Q v " w '* " ~ ~
- (303) 245-4320 IWX: 9109295334 Wcinbergstrasse 9 8001 Zurich, Switzerlanct (01) 470844 Telex: 57275 July 7,1982
~
FLD/82/86/ETS Director, Region I U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 631 Park Avenue King of Prussia, Pennsylvania 19406 Attn:
Mr. A. Gody
Dear Sir:
On July 2,1982, the Nuclear Assurance Corporation sent to you a letter making pre-notification of a planned series of irradiated reactor fuel shipments from the Chalk River Facility of Atomic Energy of Canada, Ltd., to the U.S. Savannah River Plant.
In our letter we incorrectly identified the port of entry as Alexandria Bay, New York.
The correct port of entry is Derby Line, Verment.
In addition, we have revised the estimated time of entry.
This change in indicated in the separately enclosed schedule inforriation sheet.
We regret this error.
This letter confirms verbal notification of these changes made on this date to the addressees.
Sincerely, NUCLEAR ASSURANCE CORPORATION uf p
i F. L. Danese Manager, Cask Operations FLD:pwh cc:
Director, Region II Material Transfer SG Licensing Branch U.S. Nuclear Regulatory Commission Division of Safeguards Office of Inspection and U.S. Nuclear Regulatory Commissica Enforcement Washington, D.C.
20555 101 Marietta Street Suite 3100 Attn:
Mr. Charles Hillman Atlanta, GA 30303 4.1 O Attn:
Mr. M. D. McGuire
[TW
(
~~
..fi;.M,--
,.'i-
- i; ;. ;-. <.. -k.*k..%D
-9 24#+L *..--l
- : R M :.4;TR i %.; n ~v~g g
~
^
01
+h.
.. SCHEDULE. JiiT'ORMAT10ti Revision
~ ~?50? q_*r,,.=.y W 4 m.
m 1;. 2/8/;823.W4.
c'E$W=$[gy((Qj]h,;..:w- -- y..FV%p%w.,oMpn.;oegcFjbed b
- - = - -.
y 03 h
n in accordance with the requirements of 10 CFR 73.21.
to T$pr61etttmt--
' 05 06
..-u.-
. - :a. --.-
- ~ = - - -
.L.
07 Number of shipments: -6~
. ~.Q' E.
C' 08
.c~
' Estimated Time and Date'of De[a'rtureEfrom Origin (AECL):
09 Time Da'te 10 Shipment 1:
07:00P 07/11/82
~
11
- Shipment 2:
. 07:00P 07/18/82 12 13
. Shipment 3:
07:00P 07/25/82
' Shipment 4:
14
'. Shipment 5:
07:00P 08/01/82 07:00P 08/08/82 15 Shipment 6:
' 07:00P 08/15/82 16 17 Estimated Time and Date of Entry at Derby Line, VT:lR.$
Time i Date 18 19 Shipment 1:
04:30A 07/12/82
'~~
20 Shipment 2:
04:30A 07/19/82
.. ~
21
-Shipment 3:
04:30A Rt07/26/82 22
' Shipment'4:
04:30A 08/02/82 23 Shipment 5:
/04:30A 08/09/82 Shipment 6:
~04:30A 08/16/82 24 25 Estimated Time and Date of Arrival at Destination (SRP):
Time Date 26 Shipment 1:
07:00P 07/13/82 27 28
' Shipment 2:
07:00P 07/20/82 Shipment 3:
'07:00P 07/27/82 29 30 Shipment 4:
07:00P 08/03/82 31 Shipment 5:
07:00P 08/10/82 Shipment 6:
07:00P 08/17/82 32 33 For this series of shipments, this schedule nformation muist be protected in 34 accordance with the provisions of 10 CFR 73.21 until 10 days after the last 35 shipment in the series is complete.
The last shipment in this series is 36 estimated to be completed on August 17, 1982.
37 38 39 40 41 Note:
Lines 38 and 39 may be used in t'he event the above schedule is revised.
9 e
p
~
0}-
SCHEDULE INFCI:MATION gy
.. g -
- 4. :..__ _
- ' _. 7._--:-
- r - --
0 4,..; W;.,
, m 6.::~ ; = :.0 u
[nsj$s,stg@i4NiiFIiqin remen'ts of 3U 'CF'R 7.i.2'l!#~* ~ ". ions. :to
_ iEf8:E.tT01.Tf;;.2ET50Mh1N3cg_ a. G red by-HRC creealat i
.j
~
TU-7 5TMf 07 Namber of shipr.ents:
6 08 09 Estimated Time and Date of Departure from Origin (AECL):
" Time Date
.0 6
10
/,pi.fld.
Shipment'1:
07:00P
-07/11/82
-11 Shipment 2: V:00P 07400P. 07/18/82 12 b-M b ~ M A, g (Shipment 3: '/:oo/ 07-00P 07/25/82 13
-jy g
}
. / Shipment 4 : y:.;>t' 07 : 00P 08/01/82
~
14,.)
.VMg
- Shipment 5::/ta.# 07.'UDF 08/08/82
-15~
pd }.;, Shipment 6:9.:J07dOP 08/15/82 16 V4 17 Estimated Time and Date of Entry at Alexa 6dria Bay, NY:
Time Date 18 Shipment 1: 'D9:30A 07/12/82 T4*_
^
f/ Y Q is o Shipment 2:
19.
. ~. -
09:30A 07/19/82 20 /
Shipment 3:
09:30A 07/26/82 21,
fjp /. 'd
- Shipraent 4:
09:30A 08/02/82 22
'g.,..,
' Shipment 5:
09:30A 08/09/82 23-Shipment 6:
09:30A 08,/16/82 24 25 Estimated. Time and Date of Arrival at Destination (SRP):
Time Date 26 Shipment 1:
07:00P 07/13/82 27 Shipnent 2:
07:00P 07/20/82 l
28 Shipment 3:
07:00P 07/27/82 29 Shipment 4:
07:00P 08/03/82 30 Shipment 5:
01:00P 08/10/82 31 Shipment 6:
07:00P 08/17/82 32 33 for this series of shipments, this schedule information must be protected in 34 accordance with the provisions of 10 CFR 73.21 until 10 days after the last 35 shipment in the series is complete.
The last shipment in this series is 36 estimated to be completed on August 17, 1982.
37 38 39 40 41 Note:
Lines 38 and 39 may be used in the event the above schedule is revised.
f <( -
hhhhhs$$
c, q. > o A.
e f.*.
Office of thr LiIutenant Governor E
M ADE LEINE M. KUNIN to
[
828 2226 STATE OF VERMONT MONTPELIER 05602
.i I
t FREEDOW OF INFORMATION September 16, 1982 ACI REQUEST Fbr A-22-4 W
%d. q-a n -22.
Patricia G. Norry Director Office of Administration U.S. Nuclear Regulatory Commission j
Washington, D.C.
20005
Dear Ms. Norry:
Pursuant to the Freedom of Information Act, 5 U.S.C. 552, et seq., I am requesting, on behalf of Lieutenant Governor Madeleine Kunin, that you furnish copies of the following described agency records:
I (1) Any correspondence between your agency and Governor Richard A. Snelling of Vermont, or members of his staff (including, but not limited to Dean Pineles, Thomas Evslin, or William Gilbert), and dated between l
August 25, 1982 and the present, which relates to the transport of nuclear waste material through the state of u
Vermont and/or public release of the dates of any such ij transport;
?
l (2) Any writings memorializing conversations between p
officials of your agency and Governor Richard A. Snelling of l
Vermont or members of his staff (including, but not limited l
to Dean Pineles, Thomas Evslin or William Gilbert), and dated between August 25, 1982 and the present, which related to the transport of nuclear waste material through the state of Vermont and/or public release of the dates of any such transport; i
(3) Any correspondence or other writing between the agency and Nuclear Assurance Corporation of Atlanta, Georgia, dated after l
November 13, 1981, which relates to a revision in the anticipated schedule or number of shipments of irradiated fuel from the Chalk River Nuclear Laboratories, originally scheduled to commence on l
May 18, 1982, and to consist of six shipments.
l l
NOT PRINTED AT GOVERNMENT EXPENSE
, [. =~
- t ;
+
Patricia G. Norry September 16, 1982 Page 2 If the agency should claim that an exemption justifies the withholding of any or all of these records, we would appreciate consideration of its exercise or discretionary authority to release them to us, in the public interest.
Thank you for your cooperation.
Should you have any questions about this request, please call me at (802) 863-5888 or (802) 863-5708.
4 Very truly yours,- /
/
Ja Michael H. Lipson Attorney at Law i
Mill / psp h
,i i
e i
i 1
I l
l L.
.