ML20028A973

From kanterella
Jump to navigation Jump to search
Forwards LER 82-021/03L-0
Date released: 02/11/2020 Download: ML20028A973


LER 82-021/03L-0:on 821027,following Use in Routine Sampling Procedure SV-33655,hot Leg Loop B Sample Inside Containment Isolation Valve Failed to Remain Closed.Caused by Malfunction of Limit Switch.Switch Replaced
ML20028A976
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 11/17/1982
From: Hunstad A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20028A976 (1)
Forwards LER 82-021/03L-0
ML20028A972
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 11/17/1982
From: Musolf D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML20028A972 (1)